HomeMy WebLinkAboutC200-Site Development Plan-C201672(33(/:(57+
$/:$<621
(DVWWK6WUHHW)LVKHUV,1
SKRQHID[
Know what's
R
GRAPHIC SCALE
CONTACT:
CARMEL UTILITIES (317) 571-2648 FOR WATER LOCATES
FOR SANITARY SEWER LOCATES
CONTACT: CLAY TOWNSHIP REGIONAL WASTE DISTRICT
(317) 844-9200
STORM SEWER FOR THIS PROJECT WILL BE PUBLIC.
ALL STORM SEWERS WITHIN PUBLIC RIGHT-OF-WAY SHALL
BE RCP CLASS III.
NOTE:
FOR STORM AND PIPE CHARTS SEE SHEET C202
EARTHWORK:
1. EXCAVATION
A. Excavated material that is suitable may be used for fills. All unsuitable
material and all surplus excavated material not required shall be removed from the
site.
B. Provide and place any additional fill material from offsite as may be
necessary to produce the grades required on plans. Fill obtained from offsite shall
be of quality as specified for fills herein and the source approved by the Developer.
It will be the responsibility of the Contractor for any costs for fill needed.
2. REMOVAL OF TREES
A. All trees and stumps shall be removed from areas to be occupied by a road
surface or structure area. Trees and stumps shall not be buried on site.
3. PROTECTION OF TREES
A. The Contractor shall, at the direction of the Developer, endeavor to save and
protect trees of value and worth which do not impair construction of improvements
as designed.
B. In the event cut or fill exceeds 0.5 foot over the root area, the Developer
shall be consulted with respect to protective measure to be taken, if any, to
preserve such trees.
4. REMOVAL OF TOPSOIL
A. All topsoil shall be removed from all areas beneath future pavements or
building. Topsoil removal shall be to a minimum depth of 6 inches or to the depth
indicated in the geotechnical report provided by the Developer to be excavated or
filled. Topsoil should be stored at a location where it will not interfere with
construction operations. The topsoil shall be free of debris and stones.
5. UTILITIES
A. Rules and regulation governing the respective utility shall be observed in
executing all work under this section.
B. It shall be the responsibility of the Contractor to determine the location of
existing underground utilities 2 working days prior to commencing work. For
utility locations to be marked call Toll Free 1-800-382-5544 within Indiana or
1-800-428-5200 outside Indiana.
EXISTING CONTOUR
EXISTING SANITARY SEWER
EXISTING STORM SEWER
PROPOSED GRADE
PROPOSED CONTOUR
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
PROPOSED WATER LINE
PROPOSED SWALE
PROPOSED 5' & 8' SIDEWALK (BY HOME BUILDER)
(DEVELOPER SHALL INSTALL SIDEWALKS ALONG ALL COMMON AREAS)
DENOTES REAR PROTECTION GRADES
LOT NUMBER
PAD ELEVATION
DENOTES FRONT PROTECTION GRADES
PROPOSED 6" DUAL WALL HANCOR HI-Q TYPE 4
UNDERDRAINS UNDER CURB.
MIN. FINISH FLOOR ELEV. IS BASED OFF OF THE BELOW
CRITERIA, WHICHEVER IS HIGHER:
1. (1) FOOT ABOVE THE NEAREST UPSTREAM
OR DOWNSTREAM SANITARY MANHOLE
WHICH EVER IS LOWEST.
2. 15" (1.25') ABOVE THE ROAD ELEVATION
3. 6" (0.5') ABOVE THE M.L.A.G
MINIMUM FLOOD PROTECTION GRADE
MINIMUM LOWEST ADJACENT GRADE
LEGEND
RISER TC
DUAL WALL, HANCOR
HI-Q TYPE 4 SSD
(SIZE NOTED ON PLANS)
4" SSD TO LOT
CONSTRUCTION LIMITS
OVER EXCAVATE
0.9" FOR SEDIMENT
ACCUMULATION
XXX.X
&
2
+
6
'
5
)
'
'
1
6
5
4
2
4
6
'
9
.
'
&
'
*
8
#
&
+
4
,
#
&
0
+
0
#
+
'
'
)
0
+
4
'
0
1
+
.
#
0
5
(
'
2
4
1
56#6'1(
5
APPROVAL PENDING
NOT FOR CONSTRUCTION
6. SITE GRADING
A. Do all cutting, filling, compacting of fills and rough grading required to
bring entire project area to subgrade as shown on the drawing.
B. The tolerance for paved areas shall not exceed 0.05 feet above established
subgrade. All other areas shall not exceed 0.05 feet plus or minus the established
grade. Provide roundings at top and bottom of banks and other breaks in grade.
C. The Engineer shall be notified when the Contractor has reached the
tolerance as stated above, so that field measurements and spot elevations can be
verified by the Engineer. The Contractor shall not remove his equipment from the
site until the Engineer has verified that the job meets the above tolerance.
DRAINAGE SUMMARY
29(5$//6,7($&5($*( $&
ALLOWABLE RATE CALCULATION:
0.1 cfs/acre = 10-yr 0.30 cfs/acre = 100-yr
$//2:$%/( %DVHGRII$F
10 YR. 100 YR.
1.850cfs 5.550cfs
POST DEVELOPED 1.381cfs 3.317cfs
VOLUME DETENTION REQUIRED
LAKE #1 = IWñ
LAKE #2 = IWñ
VOLUME DETENTION PROVIDED
LAKE #1 = IWñ
LAKE #2 = IWñ
LAKE #2 OFFSITE DRAINAGE:
THERE IS NO OFFSITE TO LAKE #1
LAKE #2 OFFSITE DRAINAGE:
THERE IS NO OFFSITE TO LAKE #2
BENCHMARK INFO
BM DNR
DNR HAM 40 1989 NAVD 88
ELEV.=906.076
TBM #3
R.R. SPIKE SET 1' UP ON THE NORTH SIDE OF POWER POLE
074697. SAID POLE IS THE 4TH POLE EAST OF THE
INTERSECTION OF 146TH & SHELBORNE ON THE SOUTHSIDE
OF 146TH STREET. 1ST POLE WEST OF BUCKEYE GAS
CROSSING.
ELEV.=914.51
MATCH LINE "A" MATCH LINE "A"
MATCH LINE "B" MATCH LINE "B"
MATCH LINE "B" MATCH LINE "B"
MATCH LINE "C" MATCH LINE "C"
MATCH LINE "C" MATCH LINE "C"
CONTRACTOR TO TIE PROPOSED CURB
AND PAVEMENT TO EXISTING CURB
AND PAVEMENT IN TRAILS AT HAYDEN
RUN AS SHOWN.
BMP #2
SEE DETAIL SHEET
C803
FLOOD STATEMENT
THIS SITE DOES NOT LIE WITHIN A FLOODWAY OR
FLOOD PLAIN PER FIRM 18057C0205F DATED FEB. 19,
2003
VEGETATIVE COVER
EXISTING SITE CONSIST MOSTLY OF GRASS AND
WEEDS WITH WOODS ON THE SITE.
ADJACENT PROPERTIES
NORTH: AGRICULTURE
EAST: AGRICULTURE
SOUTH: RESIDENTIAL
WEST: AGRICULTURE
NOTES TO CONTRACTOR:
ALL PADS SHOULD BE TESTED TO ASSURE A COMPACTION OF AT LEAST 95
PERCENT OF THE MAXIMUM DRY DENSITY USING THE STANDARD
PROCTOR TEST METHOD.
ANY PRIVATE TILES LOCATED ON THIS SITE WILL NEED TO BE LOCATED;
BREATHERS SET AT THE DOWNSTREAM PROPERTY LINE AND CRUSHED OR
REMOVED ACROSS THIS SITE. IF ANY OF THESE TILES EXTEND BEYOND THE
LIMITS OF THIS PROJECT, THEY WILL NEED TO BE PROVIDED A POSITIVE
OUTLET AND ALLOWED TO CONTINUE TO FUNCTION, AS IT IS ILLEGAL TO
BLOCK OFF A PRIVATE "MUTUAL" TILE.
CONTRACTOR SHALL VERIFY DEPTHS OF ALL EXISTING ONSITE UTILITIES
PRIOR TO CONSTRUCTION TO CONFIRM THERE IS NOT ANY CONFLICTS
WITH OTHER UTILITIES, STORM SEWERS OR STREETS. CONFLICTS AFTER
CONSTRUCTION BEGINS ARE SOLELY THE CONTRACTOR'S RESPONSIBILITY.
ALL PAVING WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY SHALL
CONFORM TO THE REQUIREMENTDS OF THE DEPARTMENT ENGINEERING.
THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING
TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE
DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION
REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF WORK
TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO
WORK WITHIN THE EXISTING AND PROPOSED CITY R/W.
EXISTING PAVEMENT TO BE SAW CUT TO A CLEAN EDGE ADJACENT TO
ANY WIDENING, AUXILIARY LANES, ETC.
NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE WITHOUT AN
APPROVED STORM WATER MANAGEMENT PERMIT.
THERE IS TO BE NO DRIVEWAY ENCROACHMENTS INTO EASEMENTS
BETWEEN LOTS.
UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE
RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS
REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH
PROPOSED DEVELOPMENT SHALL BE THE RESPONSIBILITY OF THE
DEVELOPER TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES
REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED
RIGHT-OF-WAY LINE.3
DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED/REPAIRED
TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT.
THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH
THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE
EXISTING CONDITION OF THE RIGHT-OF-WAY.