NOTES:
1. ANY LANE RESTRICTION ON 146TH STREET MUST
BE APPROVED BY THE HAMILTON COUNTY
BOARD OF COMMISSIONERS AT A REGULARLY
SCHEDULED MEETING. LANE RESTRICTIONS
MAY ONLY OCCUR BETWEEN THE WEEKDAY
HOURS OF 9AM TO 3PM.
2. IF THERE IS A SIDEROAD INTERSECTION WITHIN
THE WORK AREA, ADDITIONAL TRAFFIC
CONTROL, SUCH AS FLAGGERS AND
APPROPRIATE SIGNAGE, MAY BE NEEDED ON
THE SIDEROAD APPROACHES.
3. THE DISTANCE BETWEEN ROAD WORK AHEAD
SIGNS SHOULD NOT EXCEED APPROXIMATELY 2
MILES.
4. WHERE FEASIBLE, WELL DEFINED END POINTS
(E.G. INTERSECTIONS, MAJOR DRIVEWAYS, CITY
LIMITS, ECT.) SHOULD BE USED TO ESTABLISH
THE LIMITS OF THE WORK ZONE.
5. ADDITIONAL PROTECTION VEHICLES TO WARN
AND REDUCE THE SPEED OF ONCOMING OR
OPPOSING TRAFFIC MAY BE USED. POLICE
PATROL CARS MAY BE USED FOR THIS PURPOSE.
6. ANY PLANNED LANE RESTRICTIONS FOR MORE
THAN 15 MINUTES REQUIRES 48-HOUR
NOTIFICATION TO THE CITY ENGINEER FOR
PROPER NOTIFICATION TO EMERGENCY
RESPONSE AGENCIES. ANY TEMPORARY LANE
RESTRICTIONS REQUIRE BOARD OF PUBLIC
WORKS AND SAFETY APPROVAL.
7. FOR ANY LANE RESTRICTION ON 146TH STREET A
CHANGEABLE MESSAGE SIGN WILL BE
REQUIRED, AT LEAST 5 WORKING DAYS IN
ADVANCE OF THE RESTRICTION, NOTIFYING
MOTORISTS OF THE PLANNED RESTRICTION. THE
MESSAGE SHOWN WILL BE REVIEWED AND
APPROVED BY THE HAMILTON COUNTY
HIGHWAY DEPARTMENT.
FLAGMAN
FLAGMAN AHEAD SIGN
ROAD CONSTRUCTION AHEAD SIGN/
END CONSTRUCTION
SIGN DRUMS
LEGEND
TWO "ROAD
CONSTRUCTION
AHEAD" TWO "END
CONSTRUCTION"
SIGNS REQUIRED
BUFFER
TAPER
FLAGMAN
500' 500' 320' 440'
TAPER
13 DRUMS w/"STEADY BURNING
LIGHTS" @ 40' O-C= 480' 320'
FLAGMAN
TWO "ROAD
CONSTRUCTION
AHEAD" TWO "END
CONSTRUCTION"
SIGNS REQUIRED
500' 500'
CONSTRUCTION LIMITS