Loading...
HomeMy WebLinkAboutC406-Entrance & Intersection Details-C406672(33(/:(57+ $/:$<621 (DVWWK6WUHHW)LVKHUV,1 SKRQHID[ & 2 + 6 ' 5 ) ' ' 1 6 5 4 2 4 6 ' 9 . ' & ' * 8 # & + 4 ,  # & 0 + 0 # + ' ' ) 0 + 4 ' 0 1 + . # 0 5 ( ' 2 4 1 56#6'1( 5 APPROVAL PENDING NOT FOR CONSTRUCTION Know what's R NOTES: 1. THERMOPLASTIC PAVEMENT MARKINGS ARE REQUIRED ON ASPHALT PAVEMENT WITHIN RIGHT-OF-WAY. 2. UTILITY CONFLICTS (INCLUDING UTILITY POLES) MUST BE COMPLETELY RESOLVED PRIOR TO CONSTRUCTION OF ACCELERATION/DECELERATION, PASSING BLISTER LANES AND/OR LEFT TURN LANES. CONSTRUCTION OF THESE LANES INCLUDES BUT IS NOT LIMITED TO EXCAVATION, EMBANKMENT, PAVING, AND SUBGRADE PREPARATION, ETC. 3. ALL ROADS MUST BE BROUGHT BACK TO ORIGINAL OR BETTER CONDITION, INCLUDING BUT NOT LIMITED TO STRIPING, STONE SHOULDERS AND SIGNAGE. REPAIRS (i.e., STRIPING)SHALL COINCIDE WITH THE ADJOINING ROAD AT BOTH ENDS. LEGEND PAVEMENT WITHIN RIGHT-OF-WAY OF 146TH STREET (SEE THIS SHEET FOR DETAIL) EXISTING PAVEMENT ELEVATION. (CONTRACTOR TO VERIFY ALL ELEVATIONS PRIOR TO STARTING CONSTRUCTION TO INSURE POSITIVE SLOPE TO PROPOSED GRADES. IF NOT VERIFIED BEFORE CONSTRUCTION STARTS IT IS SOLELY THE CONTRACTORS RESPONSIBILITY.) "A" "A" Primary Arterial cross-section for the R/W pavement on 146th Street is as follows: 1" HMA surface, on 5" HMA intermediate, on 14" stone base, on prepared subgrade.