HomeMy WebLinkAboutC406-Entrance & Intersection Details-C406672(33(/:(57+
$/:$<621
(DVWWK6WUHHW)LVKHUV,1
SKRQHID[
&
2
+
6
'
5
)
'
'
1
6
5
4
2
4
6
'
9
.
'
&
'
*
8
#
&
+
4
,
#
&
0
+
0
#
+
'
'
)
0
+
4
'
0
1
+
.
#
0
5
(
'
2
4
1
56#6'1(
5
APPROVAL PENDING
NOT FOR CONSTRUCTION
Know what's
R
NOTES:
1. THERMOPLASTIC PAVEMENT MARKINGS ARE REQUIRED
ON ASPHALT PAVEMENT WITHIN RIGHT-OF-WAY.
2. UTILITY CONFLICTS (INCLUDING UTILITY POLES) MUST
BE COMPLETELY RESOLVED PRIOR TO CONSTRUCTION OF
ACCELERATION/DECELERATION, PASSING BLISTER LANES
AND/OR LEFT TURN LANES. CONSTRUCTION OF THESE
LANES INCLUDES BUT IS NOT LIMITED TO EXCAVATION,
EMBANKMENT, PAVING, AND SUBGRADE PREPARATION,
ETC.
3. ALL ROADS MUST BE BROUGHT BACK TO ORIGINAL OR
BETTER CONDITION, INCLUDING BUT NOT LIMITED TO
STRIPING, STONE SHOULDERS AND SIGNAGE. REPAIRS (i.e.,
STRIPING)SHALL COINCIDE WITH THE ADJOINING ROAD
AT BOTH ENDS.
LEGEND
PAVEMENT WITHIN RIGHT-OF-WAY OF 146TH STREET
(SEE THIS SHEET FOR DETAIL)
EXISTING PAVEMENT ELEVATION.
(CONTRACTOR TO VERIFY ALL ELEVATIONS PRIOR
TO STARTING CONSTRUCTION TO INSURE POSITIVE
SLOPE TO PROPOSED GRADES. IF NOT VERIFIED
BEFORE CONSTRUCTION STARTS IT IS SOLELY THE
CONTRACTORS RESPONSIBILITY.)
"A"
"A"
Primary Arterial cross-section for the R/W
pavement on 146th Street is as follows:
1" HMA surface, on
5" HMA intermediate, on
14" stone base,
on prepared subgrade.