Loading...
HomeMy WebLinkAboutCarmel response 3961 Perry Boulevard Civil Engineering April 27, 2015 Mr. Alex Jordan Plan Review Coordinator City of Camel Engineering Department One Civic Square Carmel, IN 46032 Re: Muehlenbein Home Site Review Comments Mr. Jordan, We are offering this submittal in response to your prepared our response in a point, by point format aligned to match the format of your letter are shown below. A copy of your letter is also att Construction plan comments: 1. The email address has been added to the cover sheet. 2. Additional spot elevations have been added, see Sheets C103 and C104. 3. The northern part of the drive will be sloped toward the west so that runoff w existing farm field. 4. None are planned, contractor will obtain as needed 5. In the “Board of Public Works and Safety” section, Item 4 states this is not required. 6. A variance request is attached to this submittal 7. The MLAG and MFPG elevations 8. The emergency over flow can convey 1.25 times the 100 year flow. See Page 5 calculations. General Information: No response is needed to any item in this group, except the following. Page 2, Item 4. A completed and signed Stormwater Management Permit Page 2, Item 5. This is a contractor item. Page 2, Item 7. A CD containing the digital files transmittal is attached. Page 2, Item 10. We will serve letters from the utilities Board of Public Works and Safety: With the exception of the following, these items do not apply to this project. Item 3. We are not proposing a commercial curb cut Item 4. See Construction Plan comment 5 Perry Boulevard • Whitestown, IN 46075 • Phone: (317) 769 - 69 Civil Engineering • Land Planning • Development Consultants City of Camel Engineering Department Review Comments We are offering this submittal in response to your review comments dated March 24 prepared our response in a point, by point format aligned to match the format of your letter below. A copy of your letter is also attached for your reference. The email address has been added to the cover sheet. have been added, see Sheets C103 and C104. The northern part of the drive will be sloped toward the west so that runoff will flow into the None are planned, contractor will obtain as needed. In the “Board of Public Works and Safety” section, Item 4 states this is not required. A variance request is attached to this submittal. The MLAG and MFPG elevations and definitions are shown on Sheets C103 ad C104. The emergency over flow can convey 1.25 times the 100 year flow. See Page 5 No response is needed to any item in this group, except the following. completed and signed Stormwater Management Permit is attached. a contractor item. A CD containing the digital files has been delivered to Terry Krueskamp, a copy of the We will serve letters from the utilities are attached. Board of Public Works and Safety: With the exception of the following, these items do not apply to this project. Item 3. We are not proposing a commercial curb cut. tion Plan comment 5. 922 March 24, 2015. We have prepared our response in a point, by point format aligned to match the format of your letter, our responses ill flow into the In the “Board of Public Works and Safety” section, Item 4 states this is not required. and definitions are shown on Sheets C103 ad C104. The emergency over flow can convey 1.25 times the 100 year flow. See Page 56 of the drainage has been delivered to Terry Krueskamp, a copy of the Civil Engineering Bonding Requirements: A bond for the erosion control measures will be provided. The Engineer’s estimate for the bond amount is attached. Right of Way Bond: This is a contractor item. Availability and Connection Fees: Per the Carmel Water Department and Clay Township Regional Waste District all fees will be paid prior to permits being issued. Due to the construction schedule these fees will be paid by the owner prior to construction of the house and barn department and CTRWD, they have no issue with this. If you have any further questions or concerns please do not hesitate to contact us. Thank you, Jerry Kittle Director of Engineering Civil Engineering • Land Planning • Development Consultants A bond for the erosion control measures will be provided. The Engineer’s estimate for the bond amount Availability and Connection Fees: el Water Department and Clay Township Regional Waste District all fees will be paid prior to Due to the construction schedule these fees will be paid by the owner prior to construction of the house and barn, likely sometime next year. This has been discussed department and CTRWD, they have no issue with this. If you have any further questions or concerns please do not hesitate to contact us. A bond for the erosion control measures will be provided. The Engineer’s estimate for the bond amount el Water Department and Clay Township Regional Waste District all fees will be paid prior to Due to the construction schedule these fees will be paid by the owner prior to . This has been discussed with the water