3961 Perry Boulevard
Civil Engineering
April 27, 2015
Mr. Alex Jordan
Plan Review Coordinator
City of Camel Engineering Department
One Civic Square
Carmel, IN 46032
Re: Muehlenbein Home Site Review Comments
Mr. Jordan,
We are offering this submittal in response to your
prepared our response in a point, by point format aligned to match the format of your letter
are shown below. A copy of your letter is also att
Construction plan comments:
1. The email address has been added to the cover sheet.
2. Additional spot elevations have been added, see Sheets C103 and C104.
3. The northern part of the drive will be sloped toward the west so that runoff w
existing farm field.
4. None are planned, contractor will obtain as needed
5. In the “Board of Public Works and Safety” section, Item 4 states this is not required.
6. A variance request is attached to this submittal
7. The MLAG and MFPG elevations
8. The emergency over flow can convey 1.25 times the 100 year flow. See Page 5
calculations.
General Information:
No response is needed to any item in this group, except the following.
Page 2, Item 4. A completed and signed Stormwater Management Permit
Page 2, Item 5. This is a contractor item.
Page 2, Item 7. A CD containing the digital files
transmittal is attached.
Page 2, Item 10. We will serve letters from the utilities
Board of Public Works and Safety:
With the exception of the following, these items do not apply to this project.
Item 3. We are not proposing a commercial curb cut
Item 4. See Construction Plan comment 5
Perry Boulevard • Whitestown, IN 46075 • Phone: (317) 769 - 69
Civil Engineering • Land Planning • Development Consultants
City of Camel Engineering Department
Review Comments
We are offering this submittal in response to your review comments dated March 24
prepared our response in a point, by point format aligned to match the format of your letter
below. A copy of your letter is also attached for your reference.
The email address has been added to the cover sheet.
have been added, see Sheets C103 and C104.
The northern part of the drive will be sloped toward the west so that runoff will flow into the
None are planned, contractor will obtain as needed.
In the “Board of Public Works and Safety” section, Item 4 states this is not required.
A variance request is attached to this submittal.
The MLAG and MFPG elevations and definitions are shown on Sheets C103 ad C104.
The emergency over flow can convey 1.25 times the 100 year flow. See Page 5
No response is needed to any item in this group, except the following.
completed and signed Stormwater Management Permit is attached.
a contractor item.
A CD containing the digital files has been delivered to Terry Krueskamp, a copy of the
We will serve letters from the utilities are attached.
Board of Public Works and Safety:
With the exception of the following, these items do not apply to this project.
Item 3. We are not proposing a commercial curb cut.
tion Plan comment 5.
922
March 24, 2015. We have
prepared our response in a point, by point format aligned to match the format of your letter, our responses
ill flow into the
In the “Board of Public Works and Safety” section, Item 4 states this is not required.
and definitions are shown on Sheets C103 ad C104.
The emergency over flow can convey 1.25 times the 100 year flow. See Page 56 of the drainage
has been delivered to Terry Krueskamp, a copy of the
Civil Engineering
Bonding Requirements:
A bond for the erosion control measures will be provided. The Engineer’s estimate for the bond amount
is attached.
Right of Way Bond:
This is a contractor item.
Availability and Connection Fees:
Per the Carmel Water Department and Clay Township Regional Waste District all fees will be paid prior to
permits being issued. Due to the construction schedule these fees will be paid by the owner prior to
construction of the house and barn
department and CTRWD, they have no issue with this.
If you have any further questions or concerns please do not hesitate to contact us.
Thank you,
Jerry Kittle
Director of Engineering
Civil Engineering • Land Planning • Development Consultants
A bond for the erosion control measures will be provided. The Engineer’s estimate for the bond amount
Availability and Connection Fees:
el Water Department and Clay Township Regional Waste District all fees will be paid prior to
Due to the construction schedule these fees will be paid by the owner prior to
construction of the house and barn, likely sometime next year. This has been discussed
department and CTRWD, they have no issue with this.
If you have any further questions or concerns please do not hesitate to contact us.
A bond for the erosion control measures will be provided. The Engineer’s estimate for the bond amount
el Water Department and Clay Township Regional Waste District all fees will be paid prior to
Due to the construction schedule these fees will be paid by the owner prior to
. This has been discussed with the water