HomeMy WebLinkAboutMeuhlenbein variance request
3961 Perry Boulevard
Civil Engineering
April 23, 2015
City of Carmel
Engineering Department
One Civic Square
Carmel, IN 46032
Re: Muehlenbein Home Site Variance request
We are requesting a variance of the requirements
Stormwater Technical Standards Manual.
This section reads:
“Slopes no steeper than 3 horizontal to 1 vertical (3:1) for safety, erosion control, stability, and ease of
maintenance shall be permitted.”
The proposed detention pond will be built
vertical side slopes. The wall system
vertical side slopes. The pond has been designed
be surrounded by a fence with a security gate as the only access
potential safety hazard to the general public.
Thank you for your consideration of this issue
Best regards,
Jerry Kittle
Director of Engineering
Perry Boulevard • Whitestown, IN 46075 • Phone: (317) 769 - 69
Civil Engineering • Land Planning • Development Consultants
Variance request
requesting a variance of the requirements listed in Section 302.06(5) of the City of Carmel
Stormwater Technical Standards Manual.
Slopes no steeper than 3 horizontal to 1 vertical (3:1) for safety, erosion control, stability, and ease of
roposed detention pond will be built using an interlocking Keystone block type wall system with
The wall system will eliminate any erosion control and stability issues due to the
vertical side slopes. The pond has been designed and will remain a private pond; the entire site will also
be surrounded by a fence with a security gate as the only access. This will reduce or eliminate any
hazard to the general public.
Thank you for your consideration of this issue.
922
of the City of Carmel
Slopes no steeper than 3 horizontal to 1 vertical (3:1) for safety, erosion control, stability, and ease of
type wall system with
will eliminate any erosion control and stability issues due to the
and will remain a private pond; the entire site will also
This will reduce or eliminate any