Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Overall Site Plan 7-10-2015
IT a C 0 ._.._._._ _..— ..— ..— ....._ ._._.._. ...... _ _ _. _.._.._.._.._. ....... _.._.._.._........ _.._�. i v _�--- °- ------ - -- - -- -Il-d - I-I-I °- wr ' (solid y alhlo d whl e> m sT �EE � -__===_ - - - -- - - --- ------------- - - - -- -- - - - - -- -_ _ - - `= -p — � -__ ---- - - - - -- _ = = �_ - -- - - - - - -- - - 14th____ ______________________ - � I (dashed white) I _ _ o i �"conc cum - ASI o_ __ — __— _ _ _ - - - ----- - - - - -- - sphalt --- ----------------------- _ __ - ------ -t-. ---------- - =L% r- - --------- -- ®----- --�--- 1a i '� -�- 589'52'14 °E - 3.56'01 °E _ 198.30' N\ I i / /A9 831 588.43'29 "E – 246.11' N8T24'11 "E lb I r , [ I ___________ _____________ ________ ___________ _____ \\- - ________ a O 3 - -f9 III II i I � Q ro tii@al� I L, of 'm o N, cil u , -d .° oil ° I I - Go ill lid ' ! - -- -- -- li l MITI PROPOSED GAS I'^ STATION 6,1253 - li I� FFE:818.00 - I - -�.� II. M' ©S — �.: I WET POND - DETENTION Ii - IIII lil !nr 1111 o Ili I NOR100AYEARO V. ELEV: of ,y TOP OF BANK ELEV-. x)J > �k' t , i I I srlLLwnr ELEV: 36 v y� 1 / an T ly I< I fi 1 ,'�'��.. °r 1 �X o P I�1P 13 10' 1' (woods) 1001, / .11 N ZONE "X"-,> �II IN v ail IN 24' \ \ i TBMp32� Ii 12 12' 12 h.T , ?�S• / ` ♦ ` \ \ / i FEMA BASE FLOOD ELEVATION BASED UPON ACTUAL SURVEY D' E \` ELEVATION: 801 /) 12 12' 1 / N r ASPSCALED EXTENTS F OU FIRM. F FLOODWAY he°dwall) I I ` 4 !'� �•� °'I °ZONE AE' T /r BASED ON FIRM 18057CO227G I RBO I FEMA BASE FLOOD ELEVATION BASED UPON ACTUAL SURVEY ELEVATION: 801 / E% -- -�- 29. d o Ilu 0 (woods) \ - ----------- ` APPROX. EXTENTS FROM IT OF FLOODWAY a ii I ZONE _ AS SCALED FROM FIRM. / 3 ZONE AE' / BASED ON FIRM 18057CO227G X i - - - -- - -- / —:! -_ 1 ------------------------------------------------------ ---- -------- --- - --------- -- - -� ---- ----- - - - -I r w N895 2'14 "W – 330.00' i= �mrm tepee) N895 2'14 "W – 569.47'— „�, m" as E p I / I / / t I / NOTEc PARKING ANALYSIS 1. CONTRACTOR SHALL PROTECT AND NOT DESTROY THE PROPERTY CORNER MONUMENTS DURING GAS STATION S.F. = 6,125 CONSTRUCTION. TOTAL SPACES REQUIRED = _ 2. CONTRACTOR TO VERIFY LOCATION, SIZE AND DEPTH OF EXISTING UTILITIES PRIOR TO COMMENCING ANY CONSTRUCTION. CONTACT ENGINEER IF VARIATION EXISTS. STANDARD PARKING (9'x18') 60 10'x30' 6 3. NO EARTH DISTURBING ACTIVITIES MAY COMMENCE WITHOUT AN APPROVED STORMWATER PARALLEL PARKING ( ) MANAGEMENT PERMIT. HANDICAP PARKING PROVIDED 6 I INauocs a VA, Ac _hr I 4. IF IT WILL BE NECESSARY TO RELOCATE EXISTING UTILITIES, THE EXPENSE OF SUCH RELOCATION TOTAL PROPOSED PARKING 72 L ONE FOOT OF THE PROPOSED RIGHT -OF -WAY. SHALL BE THE RESPONSIBILITY OF THE DEVELOPER, ALL UTIUTY POLES SHALL BE LOCATED WTHIN SCALE: 1 " =40' EXISTING LEGEND BEEHIVE INLET ® TELEPHONE HANDHOLE IQ BRACE POLE Q TELEPHONE MANHOLE ® CURB INLET -Cl- TELEPHONE PEDESTAL COMBINATION POLE ' TREE (DD DRAINAGE MANHOLE TRAFFIC POLE ]E( ELECTRIC CROSS BOX TRAFFIC PEDESTAL WATER VALVE FIRE HYDRANT br OVERHEAD BRACE LINE H- GUY WIRE Phil, OVERHEAD ELECTRIC LINE MAILBOX t BURIED TELEPHONE LINE PINE otr OVERHEAD TRAFFIC LINE b POWER POLE w BURIED WATER LINE C3 RIGHT OF WAY MONUMENT tr TOP OF RIM ELEVATION SIGN iry INVERT ELEVATION rcp REINFORCED CONCRETE PIPE DFEMA FLOODWAY FEMA FLOODWAY ZONE FL ZONE AE ACTUAL FLOODPLAIN FROM SURVEY PROPOSED SITE LEGEND RIGHT OF WAY PAVEMENT ASPHALT PATH PAVEMENT OLIGHT DUTY PAVEMENT HEAVY DUTY PAVEMENT DCONCRETE ® ADA ACCESSIBLE PARKING SPACE -El LIGHT POLE (REFER TO SITE LIGHTING PLAN) 10000MM, BUILDING CONTRACTOR'S SCOPE LIMITS (ECHO) V.A. VAN ACCESSIBLE OA 6' STRAIGHT CONCRETE CURB OB COMBINED CURB k WALK © CONCRETE SIDEWALK 0 CONCRETE SIDEWALK FLUSH WITH ASPHALT O TACTILE WARNING (REF ARCH PLANS) O STOP SIGN (RI -1) © ADA PARKING SIGN (REF ARCH PLANS) OH 4' SOLD WHITE, PAINT LINE 4' SOLD BLUE, Oj PAINT 4' SOD YELLOW DOUBLE UNE,D PAINT 0 18' STOP BAR, WHITE. THERMOPLASTIC © PIPE BOLLARD 0 CONCRETE PAVEMENT O DUMPSTER PAD O 2' COMBINED CURB AND GUTTER © 24' SOLID WHITE, THERMOPLASTIC, PEDESTRIAN CROSSING O TRANSFORMER PAD ®1 A.D.A. RAMP (REFER TO ARCHITECTURAL PLANS) ® A.D.A. RAMP (TYPE D) 0 24" SOLD WHITE, PAINT UNE Oj REOBOX (REF ARCH PLANS) O2 OUTDOOR MERCHANDISER (REF ARCH PLANS) O3 ICE MACHINE (REF ARCH PLANS) ® PROPANE CAGE (REF ARCH PLANS) O BICYCLE RACKS (REF ARCH PLANS) NOTE, ALL MAINTENANCE OF TRAFFIC SIGNAGE METHODS, MATERIALS AND CONSTRUCTION DETAILS FOR WORK WITHIN PUBLIC RIGHT -OF -WAY SHALL CONFORM TO CITY OF CARMEL REQUIREMENTS, INDOT STANDARD DETOUR SHEETS AND SPECIFICATIONS AND THE INDIANA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, THIS INCLUDES PLACING ROAD CONSTRUCTION AHEAD SIGNS, LANE MERGING SIGNS, FLASHING ARROW SIGNS, CONSTRUCTION BARRELS, ETC. ALL PARKING LOT SIGNS MOUNTED IN PAVING SHALL BE BOLLARD AND POST MOUNTED REFER TO SHEET C002 FOR GENERAL SITE NOTES CAUTION II THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND EVIDENCE ( including, but not limited to, manholes, inlets, Valves, and marks mode upon the ground by others ) AND ARE SPECULATIVE IN NATURE. THERE MAY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO A80VE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF SAID EXISTING UNDERGROUND UTIUTIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO ANY AND ALL CONSTRUCTION. 1- 800- 382 -5544 CALL TOLL FREE INDIANA UNDERGROUND - 10 GIANT•'EAGLE, INC. 261 KAPPA DR. PITTSBURGH. PA 15238 CLIENT i� OAMERICAN 0: STRUCTUREPOINT 7260• adeland Station I InClanapol s Intl ana 46256 TEL 31]547.5601 FAX 31] 543.0270 www.etranurepaiat a. SUB - CONSULTANT GET -GO FILLING STATION 146th STREET & GRAY ROAD CARMEL, INDIANA CERTIFIED BY ISSUANCEINDEX DATE: 05/20/2015 PROJECT PHASE: DESIGN REVISION SCHEDULE NO. I DESCRIPTION I DATE Project Number 2015.00338 OVERALL SITE PLAN C200