HomeMy WebLinkAboutUtility Agreement - IDS JonesIDOED
UTILITY AGREEMENT
The Board of Public Works and Safety of the City of Carmel,
hereinafter referred to as the Board, and—IDS/Jones Growths
/PartneT's'-87-A, Ltd. the Permittee, hereby agree that utility
(fac.i.l-i-ties consisthg of Aerial and/or Underground Television
Cables located at the following described location,
intersection of 116th Street and Gray Road in Carmel, Indiana,
are hereby granted permit to he located within the highway
right-of-way in accordance with the attached drawings or if no
drawings are attached the utility facility will be placed
adjacent to the present utility facilities and within two feet
of the right-of-way line as indicated on the plans for the
proposed project. In consideration thereof the Permittee
hereby agrees to abide by and conform with the following terms
and conditions:
1. The above described utility facilities to be retained,
installed, adjusted or relocated on, over, along or under the
highway within the right-of-way limits will be located and
accommodated in a manner that will not impair the planned
highway, or its construction, or maintenance or interfere with
its safe operation.
2. The Permittee hereby agrees to assume liability for
making any necessary utility adjustments should future traffic
conditions or road improvement necessitate when so requested by
the Board and assume the cost thereof, except where Permittee
has a compensable property right therein or where reimbursement
of such costs is provided for by law.
The Permittee further agrees to comply with the rules and
regulations of the Board in servicing, maintaining, replacing
and removing the above described facilities, and to obtain a
permit before performing any of these functions on such
facilities located within the highway right-of-way.
3. The Permittee shall save harmless and indemnify the
Board from any claim for damages of any nature whatsoever
arising out of Permittee's negligence in connection with any
work done pursuant to this agreement.
4. During the progress of any construction undertaken
within the limits of the said highway in pursuance hereof, the
Permittee shall provide watchmen and flagmen as may be
reasonably required by the Board for safety and convenience of
the public and shall furnish all barricades, signs and lights
reasonably necessary to protect the public. Traffic shall be
maintained at all tunes unless otherwise indicated hereon by
special endorsement of the Board's duly authorized
representative.
5. All damage to drainage structures, roadbeds, pavements
and other highway appurtenances arising from the installation,
maintenance or repair of Permittee's utility facilities shall
be repaired at expense of Permittee. No portion of the
pavement of any highway shall be disturbed without prior
permission of the Board. Upon completion of any work within
limits of the highway all disturbed portions shall be replaced
as nearly as practicable in as good a condition as they were
when work was begun.
6. It is understood and agreed by the Board and the
utility that the utilities shall comply with the "State of
Indiana, Indiana Department of Highways, covering the Use and
Occupancy of Public Highway Rights -of -Way by Utilities 1971."
IDS/JONES GROWTH PARTNERS
87-A, Ltd., a Colorado
limited partnership
By:
Jones, Intercable,
Inc., its general
partner
Howard C. Olson
Fund Vice President
Authorized Rep. of Permittee
a,e9 L y :
Date:
-2-
BOARD OF PUBLIC WORKS AND
SAFETY, CITY OF CARMEL
Member
STATEMENTS ABOUT EXISTING CONDITIONS OF UTILITIES
There is no known involvement of utility companies or organizations
located within the limits of this Contract.
Statements of the status of all utility companies and organizations poten-
tially involved with the work to be performed on this Contract are pro-
vided below:
(A) The facilities of
exist within the limits of this Contract, but are not
expected to be affected by the proposed construction.
(B) The facilities of
exist within the limits of this Contract and their facili-
ties have been adjusted to accommodate construction.
(C) The facilities of
exist within the limits of this Contract and it is antici-
pated that they will adjust their facilities for construc-
tion on or before , 19
(D) The facilities of
exist within the limits of this Contract. The utility will
be able to complete its involvement with the Contract when
the Contractor has completed
in the location of
such that the utility may
adjust its facilities. It is anticipated that the utility
will take approximately work days to adjust its
facilities in this area.
The facilities of IDS/Jones Growth Partners n7 A, Ltd.
exist within the limits of this Contract. The utility will be able to
complete its involvement with the Contract when Irrlianapolis Power
& Light has completed Relocation of their
Facilities in the location of 116th and
Gray Road such that the utilitymay adjust its
facilities. It is anticipated that the utility will take approximately
5 work days After Relocation to adjust its
facilities in this area.