HomeMy WebLinkAboutAdministrative Approval for Meijer Window System Change
Motz, Lisa
From:Conn, Angelina V
Sent:Wednesday, July 22, 2015 1:53 PM
To:'Craig Armstrong'; Motz, Lisa
Cc:Keesling, Rachel M; Cory Miller; Motz, Lisa; Mishler, Nicholas F; Blanchard, Jim E
Subject:RE: Administrative approval request, Meijer window system change
Attachments:130-A201_Glazing Mods_2015-7-20.pdf
Good afternoon, Craig –
Thank you for your email request. Please accept this email as the Planning/Zoning Department’s administrative
approval of the window systems changes you spell out in your July 20 email, shown below, and also as shown
in the attached PDF file. Copies of all of this will be placed in Plan Commission file docket no. 14080002
ADLS Amendment, for Meijer Store Remodel. (Lisa – please add a copy of this email and its attachments to
Laser Fiche.)
Angie Conn,
AICP | Planning Administrator
City of Carmel Dept. of Community Services
1 Civic Square, 3rd Flr., Carmel, IN 46032
O: 317-571-2417 | Direct: 317-571-2281 | F: 317-571-2426 | W: www.carmeldocs.com
From: Craig Armstrong \[mailto:CArmstrong@elevatusarchitecture.com\]
Sent: Tuesday, July 21, 2015 4:49 PM
To: Conn, Angelina V
Cc: Keesling, Rachel M; Cory Miller; Motz, Lisa; Mishler, Nicholas F; Blanchard, Jim E
Subject: Re: Administrative approval request, Meijer window system change
It will be low-e vision glass.
Respectfully,
Craig Armstrong
ELAVATUS Architecture
111 E. Wayne St.
Ste: 555
Fort Wayne, IN 46802
P: 260-424-9090
C: 260-241-2648
_________________________________________________________________________________
On Jul 21, 2015, at 10:41 AM, Conn, Angelina V <Aconn@carmel.in.gov> wrote:
Good morning, Craig -
Thank you for letting us know about this proposed change. Please also let us know if this will
become all clear vision glass, or if any of the glass will be frosted or spandrel. Then, we can
send you the Planning/Zoning administrative approval email.
Angie Conn, AICP | Planning Administrator
City of Carmel Dept. of Community Services
1 Civic Square, 3rd Flr., Carmel, IN 46032
O: 317-571-2417 | Direct: 317-571-2281 | F: 317-571-2426 | W:
www.carmeldocs.com<http://www.carmeldocs.com/>
1
____________________________________________________________________________
From: Craig Armstrong \[mailto:CArmstrong@elevatusarchitecture.com\]
Sent: Monday, July 20, 2015 6:09 PM
To: Conn, Angelina V
Cc: Keesling, Rachel M; Cory Miller; Motz, Lisa; Mishler, Nicholas F; Blanchard, Jim E
Subject: RE: Administrative approval, Meijer garden center canopy change
Angie,
Following up on our conversation late last week. Please find the attached revised drawing
indicating the replacement of an existing window system with a new window system. There are
only 2 differences between the existing and new and are as follows:
1. The existing had some vertical butt joints, mullions behind and inside the store. The new
has vertical mullions.
2. The existing had (4) horizontal mullions. The new only has (3) horizontal mullions.
Note that the glass area increased slightly with the reduction of (1) horizontal mullion. This
revision is being made because the owner wanted a temporary entry, make it easier for patrons,
in this location and demolition of the existing system is required to achieve that. The end
condition will be as indicated in the attached.
Thank you for your time.
Craig M. Armstrong, AIA
Associate
Project Manager
ELEVATUS ARCHITECTURE
111 East Wayne Street Suite 555
Fort Wayne, Indiana 46802
O 260-424-9080
M 260-241-2648
www.elevatusarchitecture.com/<http://www.elevatusarchitecture.com/>
formerly SchenkelShultz Architecture Fort Wayne
P Please consider the environment before printing this email.
2