Loading...
HomeMy WebLinkAbout39 P0.1.PDFABBREVIATIONS A AFF AFG APPROX ARCH B LDG BP BTU BTUH CO CP CW CSW DIAORQS DWG EC ECO E LEC EQUIP ET EX �F FCO FD G GAL GALV GC GPH GPM GT GW HB HP HVAC HW HX HYD HZ IMB IN KW KWH L LA LB LF LP � � U � c� � � Q � M r r � � 0 � � � r � Cfl � � � r � � i � U � 0 � a � � r U (� � m � a� z � m Z � � � U N O � � � r � /I � COMPRESSED AIR {100 PSIG} AB�VE FINISHED FLOOR ABOVE FINISHED GRADE APPROXIMATELY ARCHITECT BUILDING BOOSTER PUMP BRITISH THERMAL UNIT BTU PER HOUR CLEAN OUT CIRCULATOR PUMP COLD WATER COLD S�FT WATER QIAMETER QRAWING ELECTRICAL CONTRACTOR EXTERIOR CLEANOUT ELECTRIC EQUIPMENT EXPANSION TANK EXISTI NG QEGREES FAHRENHEIT FLOOR CLEANOUT FLOOR DRAIN NATU RAL GAS GALLONS GALVANIZED GENERAL CONTRACTOR GALLONS PER HOUR GALLONS PER MINUTE GREASE TRAP GREASE WASTE HOSE BIB HORSEPOWER HEATING VENTILATING AND AIR CONDITIONING HOT WATER HEAT EXCHANGER WALL HYDRANT H E RTZ ICE MAKER BOX I NCH KI LOWATT KILOWATT HOUR LAVATORY LAB GOMPRESS AIR {15 PSIG} POUND LINEAR FEET LI UIFIED PETROLEUM GAS Q DRAWING SYMBOLS P401 A P401 ABBREVIATIQNS MAX MBH MC MCA MECH MFR MIN MISC N/A N NO NP O OS PC PQ PH PSI PSIA PSIG PW PWR RPZ RD SAN SH SK SPEC SQ FT ST STD TD TMV TYP UR V VAC VERT VOL VTR W W/ WB WC WCO WH WS Y CO CONNECT NEW TO EXISTING DRAWING REVISION NUMBER PLAN NOTE NUMBER MAXIMUM 1000 BTU PER HOUR MECHANICAL CONTRACTOR MINIMUM CIRCUIT AMPACITY MECHANICAL MANUFACTURER MINIMUM M ISCE LLAN EDUS NOT APPLICABLE NITROGEN NITROUS �XIDE NON-POTABLE WATER OXYGEN OIL SEPARATOR PLUMBING �ONTRACTOR PRESSURE DROP PHASE POUNDS PER SQUARE INCH POUNDS PER SQUARE INCH ABSOLUTE POUNDS PER SQUARE INCH GAGE PURE WATER (CAP 2} PURE WATER RETURN {CAP 2} REDUCED PRESSURE BACKFLOW PREVENTER RODF DRAIN SANITARY SHOWER SINK SPECIFICATION SQUARE FEET STO RM STANDARD TRENCH DRAIN THERMOSTATIC MIXING VALVE TYPI CAL URINAL VOLT / VENT VACUUM VERTICAL VOLUME VENT THROUGH ROOF WASTE WITH WASH E R BOX WATER CLOSET WALL GLEANOUT WATER HEATER WATER SOFTENER YARD CLEAN OUT SECTION NUMBER WITH SHEET REFERENCE DETAIL NUMBER WITH SHEET REFERENCE PIPING LEGEND DOMESTI� COLD WATER COLD SOFT WATER NON-POTABLE WATER DQMESTIC HOT WATER DOMESTIC HQT WATER RETURN COMPRESSED AIR LAB CQMPRESSED AIR NATURAL GAS SANITARY (SUSPENDED) SANITARY (BURIED} T RM PENDED S 0 SUS � ) T RM B RIED S O U � ) VENT DRAIN PIPING SYMB�LS CAP � CLEAN OUT � DROP REDUCER RISE � TEE - BOTTOM CONNECTION v TEE - SIDE CONNECTION I TEE - TOP C4NNECTION BALL VALVE BUTTERFLY VALVE CHECK VALVE BALANCING VALVE WITH MEMORY ST P GATE VALVE GAS VALVE PRESSURE REDUCING VALVE P/T PLUG RELIEF VALVE THERMOMETER UNION IN-LINE CIRCULAT�R PUMP BACKFLOW PREVENTER ASSEMBLY PLUMBING NOTES: (APPLY TO ALL PLUMBING DRAWINGS) 1. ALL PLUMBING SYSTEMS TO BE INSTALLEDTO MEETTHE REQUIREMENTS OF INDIANA PLUMBING CODE (2006 INTERNATIONAL PLUMBING CODE WITH THE LATEST INDIANA AMENDMENTS�. 2. ALL SOIL, WASTE, VENT AND STORM PIPING SHALL BE INSTALLED AT A MINIMUM SLOPE AS FOLLOWS: �2" AND SMALLER: %4" PER FOOT (2%} MINIMUM 3" AND LARGER: %" PER FOOT 1% MINIMUM s ( } 3. PIPING AND/OR EQUIPMENT SHALL NOT BE SUPPORTED FROM STRUCTURAL MEMBERS WITHOUT PRIOR REVIEW AND APPROVAL FROM THE STRUCTURAL ENGINEER. 4. PROVIDE FREEZE PROTECTION FOR ALL DOMESTIC WATER PIPING AND TRAPS INSTALLED IN UNHEATED AREAS. USE ELECTRIC HEAT TRACE CABLE AND INCLUDE ALL ACCESSORIES FOR A COMPLETE AUTOMATIC OPERATING FREEZE PROTECTION SYSTEM. COVER WITH INSULATION. ALL HEAT TRACING COMPONENTS SHALL BE PROVIDED AND INSTALLED BY THE PLUMBING CONTRACTOR. FINAL CONNECTION TO THE ELECTRICAL SYSTEM SHALL BE MADE BY THE ELECTRICAL CONTRACTOR. 5. CONTRACTOR IS PROHIBITED FROM USING LEAD-BASED SOLDER. 7. �. INSULATE DOMESTIC WATER PIPING PER INSULATION SCHEDULE IN THE SPECIFICATIONS. ALL PLUMBING FIXTURES AND EQUIPMENT SHALL CONFORM TO ALL APPLICABLE ENERGY CONSERVATION CODES. ALL PIPING, VALVES, AND ACCESSORIES SERVING EQUIPMENT SHALL CONFORM TO ALL APPLICABLE ENERGY CONSERVATION CODES. 9. ANCILLARY SYSTEMS NOT ASSOCIATED WITH EQUIPMENT SHALL NOT BE INSTALLED SO AS TO INHIBIT SERVICING AND/OR REMOVAL OF SAID EQUIPMENT. 10. STERILIZE DOMESTIC WATER PIPING SYSTEM IN ACCORDANCE WITH STATE AND LOCAL CODES, AND BASE BUILDING SPECIFICATIONS. CONTRACTOR SHALL BE RESP�NSIBLE F�R FLUSHING D�MESTIC, INC�MING PIPING UNTIL FREE OF DEBRIS, PRIOR TO CONNECTING TO WATER HEATING E UIPMENT. CLEAN BA�KFLOW STRAINER PRIOR TO FINAL CONNECTION. 11. NTRA T R HALL BE RE P N IBLE F R PR VIDIN AN N- ITE CO C O S S O S O O G O S FLOW TEST AT THE NEAREST FIRE HYDRANT. THE RESULTS OF THIS TEST SHALL BE SUBMITTED TO THE ENGINEER OF RECORD UPON COMPLETIQN OF TEST. 12. PRIOR TO THE INSTALLATION, FABRICATION, REMOVAL, OR RELOCATION OF ANY WORK, THE CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH THE ACTUAL CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED AND SHALL FULLY COORDINATE ALL WORK WITH THE ARCHITECTURAL PLANS BUILDING STRUCTURE AND , , WORK OF ALL OTHER TRADES. CONTRACTOR SHALL VERIFY EXISTING INVERTS PRIOR TO CONSTRUCTION. 13. FOUNDATION AND FOOTINGS SHALL NOT BE DISTURBED WITHOUT OBTAINING PERMISSION FROM THE ARCHITECT AND/OR STRUCTURAL ENGINEER. PROPER UNDERPINNING METHODS SHALL BE USED TO PROTECT AFFECTED FOUNDATION COMPONENTS. 14. PROVIDE SLEEVES FOR ALL PIPING THAT PENETRATES FULL HEIGHT WALLS, WHETHER SHOWN OR NOT. 15. PROVIDE A CHECK VALVE ON HOT AND COLD WATER BRANCH LINES SERVING ALL MOP SINKS, WHETHER SHOWN ON NOT. 16. PROVIDE WATER HAMMER ARRESTERS PRIOR TO QUICK-CLOSING VALVES (�e. ELECTRIC, PNEUMATIC, SPRING LOADED VALVES OR DEVICES, �UICK HAND CLQSURE VALVES OR FIXTURE TRIM}. SIZE ARRESTERS PER SCHEDULE ON DRAWINGS AND PDI-WH 201 CERTIFIED STANDARD. 17. INSULATE ALL PLASTIC PIPING IN RETURN AIR PLENUMS TO MAINTAIN 25/50 FIRE SMOKE RATING AND AS DIRECTED IN SPECIFICATIONS. 1$. INSULATE ALL DOMESTIC WATER PIPING WITHIN MECHANICAL ROOMS. 19. COORDINATE VENT PENETRATIONS WITH MECHANICAL ROOF TOP EQUIPMENT, REFER TO "H" SERIES DRAWINGS. OFFSET VENTS AS REQU I RE D TO MAI NTAI N M I N I M U M 10'-0" SEPARATI ON FROM AI R I NTAKES. 20. ALL FEROUS PIPING EXPOSED TO THE ELEMENTS OUTDOORS SHALL RECEIVE A PRIME COAT AND TWO COATS OF ACRYLIC ENAMEL FINISH COATS. COLOR SELECTION BY ARCHITECT. 21. ALL NATURAL GAS PIPING RUN HORIZONTAL ON ROOF SHALL BE SUPPORTED BY PRE-MANUFACTURED PIPING SUPPORTS SIMILAR TO "ROOFTOP BOX" OR "MIRO INDUSTRIES". PROVIDE ADDITIONAL LAYER OF ROOFING WEAR PAD BENEATH PIPING SUPPORTS. FIRE PRQTECTION NOTES: (APPLY TO ALL PLUMBING DRAWINGS) 1. FIRE PROTECTION SYSTEM FOR BUILDING SHALL BE DESIGNED FOR LIGHT HAZARD, 0.10 GPM PER SQUARE FOOT OVER 1,5Q0 SQUARE FEET. MECHANICAL, STORAGE AND LAB AREAS SHALL BE DESIGNED FOR ORDINARY HAZARD, 0.15 GPM PER SQUARE FOOT OVER 1,500 SQUARE FEET. 2. SPRINKLER SYSTEM SHALL BE HYDRAULLICALLY CALCULATED, FULLY SUPERVISED AND INSTALLED ACCORDING TO NFPA 13. 3. CONTRACTOR SHALL OBTAIN FLOW TEST DATA BY MEANS OF A FLOW TEST PRIOR TO DESIGN HYDRAULI� CALCULATION OF SPRINKLER SYSTEM. 4. ALL SPRINKLER SYSTEM ITEMS REQUIRED BY �ODE SHALL BE THE RESPONSIBILITY OF THE FIRE PROTECTION CONTRACTOR WHETHER SHOWN ON THE DRAWNGS AND SPECIFICATIONS OR NOT. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL COORDINATION, LAYOUT, CODE COMPLIANCE AND DESIGN. 6. PROVIDE UPRIGHT HEADS IN UNFINISHED SPACES �I.E.: THOSE WITH EXPOSED STRUCTURE}, RECESSED PENDENT HEADS IN FINISHED SPACES (I.E.: THOSE WITH LAY-IN OR HARD CEILINGS), SIDEWALL HEADS WHERE IMPRACTICAL TO INSTALL PENDENT OR UPRIGHT TYPE, OR AS INDI�ATED OTHERWISE ON THE DRAWINGS. 7. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR COORDINATION OF CEILING MOUNTED ITEMS. $. FIRE PROTECTION CONTRACTOR IS RESPONSIBLE TO ATTEND ALL BUILDING WALK-THRU'S (AFTER BUILDING IS OCCUPIED AND PRIOR TO THE END OF THE 1 YEAR WARRANTY PERIOD} BY THE BUILDING FIRE MARSHAL AND IS RESPONSIBLE FOR MAKING ANY MODIFICATIONS TO THE SYSTEM REQUIRED AS A RESULT OF THIS BUILDING INSPECTION. 9. SEISMIC RESTRAINTS: IF THE SEISMIC DESIGN CATEGORY FOR THE BUILDING IS "C" OR WORSE, THEN THE FIRE PROTECTION SPRINKLER SYSTEM AND SUPPORTS SHALL BE DESIGNED AND INSTALLED F�R THE SEISMIC FORCES IN ACCORDANCE WITH THE BUILDING CODE. �ENERAL NOTES: 1. ALL CONTRACT DOCUMENTS {SPECIFICATIONS AND DRAWINGS}, I.E.: ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL ARE COMPLIMENTARY AND MUST BE USED IN COMBINATION TO OBTAIN COMPLETE CONSTRUCTION INFORMATION. 2. ALL CONFLICTS, WHICH MAY PREVENT THE COMPLETI4N OF WORK AS INTENDED, SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION. THE CONTRACTOR SHALL NOT PROCEED WITH ANY RELATED WORK UNTIL ALL CONFLICTS ARE RESOLVED AND THE CLARIFYING INFORMATION IS ISSUED TO THE CONTRACTOR BY THE ARCHITECT. 3. IT IS THE INTENTION OF THESE DRAWINGS TO CALL FOR FINISHED WORK, I.E.: FULLY ADJUSTED, TESTED, AND READY FOR OPERATION. WHEREVER THE WORD "PROVIDE" IS USED, IT SHALL MEAN, "FURNISH AND INSTALL COMPLETE AND READY FOR USE". 4. THE PLUMBING DRAWINGS ARE DIAGRAMMATIC AND DO NOT NECESSARILY SHOW EVERY �OMPONENT AND/OR ACCESSORY REQUIRED FOR A COMPLETE INSTALLATION. THE CONTRACTOR SHALL INCLUDE SUCH ITEMS AS ARE REQUIRED TO ENSURE THAT THE ENTIRE SYSTEM IS FUNCTIONING IN COMPLIANCE WITH APPLICABLE CODES, ACCEPTED INDUSTRY STANDARDS, AND MAN U FACTU RE R'S I NSTALLATI ON REQUIREMENTS/RECOMMENDATIONS UPON COMPLETION OF WORK. 5. ALL CUTTING, DRILLING AND PATCHING OF WALLS, FLOORS, AND/OR STUCTURAL MEMBERS FOR THE INSTALLATION OF THE PLUMBING AND FIRE PROTECTIQN SYSTEMS SHALL BE PROVIDED. STRUCTURAL COMPONENTS SHALL NOT gE CUT, DRILLEa OR MODIFIED IN ANY WAY WITHOUT THE STRUCTURAL ENGINEER'S REVIEW AND PRIQR WRITTEN APPROVAL. 6. PROVIDE NFPA APPROVED FIRE STOPPING WHERE PIPES PENETRATE FIRE RATED FLOORS AND WALLS. 7. FIELD VERIFICATION: CONTRACTOR SHALL INSPECT AND VERIFY ALL EXISTIN� FIELD CONDITIONS, CLEARANCES AND DIMENSIONS BEFORE STARTING CONSTRUCTION. COMMENCEMENT OF WORK CONSTITUTES ACCEPTANCE OF EXISTING CONDITIONS. SHOULD DIFFERENT CONDITIONS BE ENCOUNTERED, CONTACT ARCHITECT/ENGINEER BEFORE PROCEEDING WITH ANY WORK. �;; ECTOR CONSULTING 'a''�=" L L C Mechanical & Electrical Engineering �;;nn ,�,,,;. �!lir ''�" ' 1005 North Senate Avenue ��r lndianapolis, lndiana 46202 ph. 3 97. fi32. 4444 fax 317. 632.4960 �����\\\1 � ',//���// ��� `� 000000��_�% ��i �� �o�°° '°oO� �i ��� G °° °°/l� �� .. �Qo p � oti � , o �v O � � v� ; _�o� � o , _ �W o Z� J_ . - _�°~ � O W a°Q- - Z - = o%� Z 0 Q 40 = - � � �� N N �� �; - ° v> � � �y O o �� ; . �i ��°oo � oo° � � /�/ �i/�/� ��OO000000�°Q�� ` ♦ /��/"� o ``-\\ %,, P ���� �/111����►1�� -r+ - � � � o � , � � ,-, � . �o �� � 0 0 '� N N �� � NN� NN ' . . � � �� ��