HomeMy WebLinkAbout2014 2010 COIT bond Huntington successor trustee pay request 11 081215 'JWQW o 0 0 WLWI'
Acme [MO um
1 1
CITY O ' CARMEL
JAMES BRAINARD, MAYOR
CITY OF CARMEL, INDIANA
LEASE RENTAL REVENUE BONDS OF 2010
CONSTRUCTION FUND DRAW REQUISITION
Disbursement Direction No. 11
The Huntington National Bank Corporate Trust Department
Attn:Maranda LujaJohnson
45 N. Pennsylvania St. INHP22
Indianapolis, IN 46207
312-229-4039
via email: Maranda.LujaJohnson@huntington.com
Date: 10th of August ,2015
RE: City of Carmel(Indiana)Lease Rental Revenue Bonds of 2010—Depository Account
Account#4087001459
Dear Maranda:
You are hereby authorized and directed as the Depositary under the above-referenced Agreement,to pay
the amounts set forth on the attached Register of Claims from the above-referenced Trust account and to
overnight the checks to the individual as set forth on the attached register.
The undersigned certifies that:
(a) The undersigned is an officer of the City of Carmel, Indiana;
(b) The amounts set forth on Schedule A are requested to be paid from the City
of Carmel(Indiana)Lease Rental Revenue Bonds of 2010—Depository
Account(#4087001459)
(c) Each obligation as reflected by the amounts set forth on Schedule A has
been properly incurred, is a proper charge against the City of Carmel
(Indiana) Lease Rental Revenue Bonds of 2010—Depository Account and
has not been the basis of any previous withdrawal from the Depository
Account;and
(d) Supporting information with respect to each payee designated on Schedule
A as to the amount owing is attached hereto.
CITY OF CARMEL, INDIANA
BY: 4-34.4Cheetthle
Diana L.Cordray,Clerk-Treasurer
Authorized Officer
DEPARTMENT OF ENGINEERING
ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 31.7.571.2441 FAX 317.571.2439
EMAIL enginecring@carmel.in.gov
REGISTER OF CLAIMS
CITY OF CARMEL,INDIANA
LEASE RENTAL REVENUE BONDS OF 2010
CONSTRUCTION FUND PAYMENT REQUISITION
DISBURSEMENT DIRECTION NO. II.
10-Aug-15
AMOUNTS
PAYEE'S NAME&MAILING ADDRESS REQUISITIONED COST ITEMIZATION
American Structurepoint,Inc. $67,131.07 Main St. from Illinois St to Old Meridian St
7260 Shadeland Station Construction Inspection
Indianapolis, IN 46256-3957 Proj. 14-06
P.O.#31847
Inv.#79353&Inv.#79174
Fluid Waste Services,Inc. $625.75 Bridlebourne Drainage
PO Box 264 Misc.Construction Repairs
Noblesville,IN 46061 Inv.#WO-14294
Rundell Ernstberger Associates,LLC $523.50 Keystone Ave/Main Street RAB
618 E.Market Street Landscape Design&Construction Inspection
Indianapolis,IN 46202 P.O.31846
Inv.#141370-7
Keller Macaluso,LLC $1,874.87 Misc. Legal Invoices related to Main St. Project
760 3rd Avenue SW,Suite 210 Proj. No. 14-06
Carmel,IN 46032 Inv.#2015-2380
Sub-Surface of Indiana,In.c $59,678.08 Bridlebourne Drainage Modification
7225 West 700 South Proj. 13-07
Morgantown,IN 46160 P.O.#27496
Inv.#4
Total $129,833.27
ALL CHECKS LISTED HEREON TO BE iV1AiLED TO: .
CrossRoad Engineers,PC-
1 Attn:Jill Newport .
3417 Sherman Drive
l _ _ Beech Grove,IN 46107 '
A-1
Remit to:
kr. 7260 Shadeland Station
Indianapolis, IN 46256-3957
o --- AMERICAN TEL 317.547.5580 FAX 317.543.0270
STRUCTUREPOINTww.vstructurepoint.com
� INC. Federal Tax ID: 35-1127317
® July 22,2015
Invoice No: 79353
Mr.Jeremy Kashman D ORIGINAL
City of Carmel
One Civic Square
Carmel, IN 46032
Total Due This Invoice (see breakdown below): $11,170.94
Project 0002014.00444.0003 Main Street Reconstruction-Amd#1
PO 31847
Services from June 01.2015 through June 30.2015
Fee
Percent Fee Prior Current
Phase Fee Complete Earned Billing Fee
Road Design Serivces 20,000.00 100.00 20,000.00 20,000.00 0.00
(Amd 1)
Rigt-of-Way 14,600.00 95.8904 14,000.00 14,000.00 0.00
Engineering
Right-of-Way 28,525.00 98.25 28,025.81 16,854.87 11,170.94
Acquisition
Total Fee 63,125.00 62,025.81 50,854.87 11,170.94
Total Fee 11,170.94
TOTAL DUE THIS INVOICE $11,170.94
Very truly yours, ����5�fe2728��'32
Wing Lau �i`
N
NN RECEIVED
Xi 1%)N JUL 2015
T C'ARMFL cn
Gay ENGINES 7
Full payment of this invoice is clue within 30 clays from invoice date.
Interest at the rate of 1.5%per month($25.00/month minimum) plus arty/all collection
costs/attorney costs maybe charged if payment is not received within 60 clays from the invoice date.
Remit to:
DU 7260 Shadeland Station
it^ Indianapolis, IN 46256-3957
AMERICAN TEL 317.547.5580 FAX 317.543.0270
ullSTRUCTUREPOINT www.structurepoint.com
INC. Federal Tax ID: 35-1127317
July 16,2015
Invoice No: 79174
Mr.Jeremy Kashman
City of Carmel U ORIGINAL
One Civic Square
Carmel, IN 46032
Total Due This Invoice (see breakdown below): S55,960.13
Project 0002014.00444.0002 Main Street from Illinois Street to Old Meridian Street-CI-Project No. 14-06, PO
#31847
PO 31847
Services from June 01,2015 through June 30,2015
Phase 00100 Construction Inspection
Professional Services
Hours Rate Amount
Project Engineer
Machala,David 156.00 95.00 14,820.00
Wildt,Clarence 11.50 95.00 1,092.50
Construction Inspector
Beechboard,Zachary 19.50 85.00 1,657.50
Brinkman,Robert 216.50 85.00 18,402.50
Grimstad, Heather 12.50 85.00 1,062.50
Reeves,Jay 178.50 85.00 15,172.50
Construction Inspector(Ovt)
Reeves,Jay 8.00 97.75 782.00
Project Manager
Cross, Ryan .25 102.51 25.63
Resident Project Representative
Everett, Eric 31.00 95.00 2,945.00
Totals 633.75 55,960.13
Professional Services Total 55,960.13
Billing Limits Current Previous Total
Total Billings ��8192021.5 55,960.13 212,103.75 268,063.88
Maximum ,��oX ,,2i� 355,226.61
Under Maximum h 87,162.73
V. RECEIVED ea 87,162.73
N L 2n15 °en TOTAL THIS PHASE $55,960.13
v IV
f CARMEL TOTAL DUE THIS INVOICE $55,960.13
X4,0 CC1Y ENGINEER tico
Outstanding Invoices:
g <9 {{�� X51
tilFp:0 of this invoice is clue within 30 days from invoice date.
Interest at the rate of 1.5%per month($25.00/month minimum)plus any/all collection
costs/attorney costs may be charged if payment is not received within 60 days from the invoice date_
Project 0002014.00444.0002 Invoice 79174
Number Date Balance
78431 6/19/2015 46,806.25
•
Very truly yours,
Todd Rutledge
Full payment of this invoice is due within 30 days from invoice date.
Interest at the rate of 1.5%per month($25.00/month minimum)plus any/all collection
costs/attorney costs may be charged if payment is not received within 60 days from the invoice date.
Page 2
TimeSheet for the Period Ending 6/15/2015 Wednesday,July 01,20,5
9:58:44 AM
American Structurepoint, Inc.
Employee DMACHALA Machala, David
Signed
Machala, David
rD)�0Stad
Approved
Snyder, Charles
Project Phase Task Labor Total Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon
Code Hr 6/1 _ 6/2 6/3 6/4 6/5 6/6 6/7 6/8 6/9 6/10 6/11 6/12 6/13 _ 6/14 6/15
0000000.00000.0010 00301 00 Reg 0.50 0.50
Labor Category: OVT 0.00 -
0002012.00579.0004 00100 IN090 00 Reg 1.50 1.50
Labor Category: Resident Project Representative OVT 0.00
0002013.00802.0001 00500 IN090 00 Reg 4.00 3.00 1.00
Labor Category: Resident Project Representative OVT 0.00 - -
0002014.00444.0002 00100 IN090 00 Reg 82.00 8.00 5.00 10.50 7.00 4.00 8.00 8.00 8.00 8.00 8.00 7.50
Labor Category: Project Engineer OVT 24.50 1.00 2.50 5.50 2.50 1.00 2.00 3.00 3.00 4.00
Daily Totals Reg 88.00 8.00 8.00 12.00 8.00 4.00 _ 8.00 8.00 8.00 8.00 8.00 8.00
OVT 24.50 1.00 2.50 5.50 2.50 1.00 2.00 3.00 3.00 4.00
TimeSheet for the Period Ending 6/30/2015 Monday,July 06, 20
7:19:49 AM
American Structurepoint, Inc.
Employee DMACHALA Machala, David
Signed
Machala, David
BUJ�OSt2d
Approved
Snyder,Charles
Project Phase Task Labor Total Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Code Hr 6/16 6/17 6/18 6119 6/20 6/21 6/22 6/23 6/24 6/25 6/26 6/27 6/28 6/29 6/30
0000000.00000.0030 00301 00 Reg 40.00 8.00 8.00 8.00 8.00 8.00
Labor Category: OVT 0.00
0002013.00802.0001 00100 IN090 00 Reg 2.50 1.50 1.00
Labor Category: Resident Project Representative OVT 0.00
0002014.00444.0002 00100 IN090 00 Reg 45.50 8.00 8.00 6.50 7.00 8.00 8.00
Labor Category: Project Engineer OVT 4.00 0.50 0.50 1.00 2.00
Daily Totals Reg 88.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
OVT 4.00 0.50 0.50 1.00 2.00
TimeSheet for the Period Ending 6/15/2015 Wednesday,July 01,2015
9:58:44 AM
American Structurepoint, Inc.
Employee CWILDT Wildt, Clarence
Signed
Wildt, Clarence
l�J)�ostod
Approved
Snyder, Charles
Project Phase Task Labor Total Mon Tue Wed Thu Fri Sat Sun Mon • Tue Wed Thu Fri Sat Sun Mon
Code Hr 6/1 6/2 6/3 6/4 6/5 616 617 6/8 619 6/10 6/11 6/12 6/13 6/14 6/15
0000000 00000.0010 00304 00 Reg 64.00 8.00 5.50 8.00 4.50 8.50 9.00 4.50 2.00 8.00 6.00
Labor Category: OVT 11.50 1.50 3.00 1.50 0.50 1.00 2.00 2.00
0002010.01298.0001 00600 IN090 00 Reg 2.00 2.00
Labor Category: Resident Project Representative OVT 0.00
0002013.00211.0002 51000 00590 00 Reg 2.00 2.00
Labor Category: Field Manager OVT 0.00
0002013.01777.0001 00200 IN090 00 Reg 1.50 1.50
Labor Category:Resident Project Representative OVT 0.00 T
0002013.01777.0001 00500 IN090 00 Reg 1.00 1.00
Labor Category: Resident Project Representative OVT 0.00
0002014.00444.0002 00100 IN090 00 Reg 11.50 8.00 3.50
Labor Category: Project Engineer OVT 0.00
0002014.02525.0003 00100 IN090 00 Reg 2.00 2.00
Labor Category: Field Manager OVT 0.00
•
0002014.02525.0003 00500 IN090 00 Reg 4.00 4.00
Labor Category: Field Manager OVT 0.00
TimeSheet for the Period Ending 6/15/2015 Wednesday,July 01,2015
9:57:16 AM
American Structurepoint, Inc.
1/
Employee ZBEECHBOA Beechboard,Zachary
Signed
Beechboard,Zachary
Approved P SIGd
Wildt,Clarence
Project Phase Task Labor Total Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon
Code Hr 611 6/2 6/3 6/4 615 6/6 6/7 6/8 6/9 6/10 6/11 6/12 6/13 6114 6/15
0002013.01777.0001 00200 IN090 00 Reg 0.00
Labor Category:Construction Inspector(Ovt) OVT 11.50 2.00 1.00 1.50 2.50 4.50
0002013.01777.0001 00200 IN090 00 Reg 72.00 8.00 8.00 8.00 10.00 10.00 10.00 10.00 8.00
Labor Category:Construction Inspector OVT 0.00
0002014.00444.0002 00100 IN090 00 Reg 16.00 8.00 8.00
Labor Category:Construction Inspector OVT 3.50 1,50 2.00
Daily Totals Reg 88.00 8.00 8.00 8.00 8.00 8.00 10.00 10.00 10.00 10.00 8.00
OVT 15.00 1.50 2.00 2.00 1.00 1.50 2.50 4.50
TimeSheet for the Period Ending 6/15/2015 Wednesday,July 41, 2415
9:58:44 AM
American Structurepoint, Inc.
Employee RBRINKMAN Brinkman, Robert
Signed
Brinkman, Robert
Approved
Wildt, Clarence
Project Phase Task Labor Total Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon
Code Hr 6/1 6/2 6/3 6/4 6/5 6/6 6/7 6/8 6/9 6/10 6/11 6/12 6/13 6114 6/15
0002014.00444.0002 00100 1N090 00 Reg 75.00 8.00 8.00 8.00 3.00 8.00 12.00 12.00 8.00 8.00
Labor Category:Construction Inspector -OVT 32.50 1.50 3.00 2.50 2.50 11.00 3.00 9.00
0002014.02344.0001 01000 10000 00 Reg 13.00 8.00 5.00 _
Labor Category: Intern -OVT 0.00
Daily Totals Reg 88.00 8.00 8.00 8.00 8.00 8.00 8.00 12.00 12.00_ 8.00 8.00
OVT 32.50 1.50 3.00 2.50 2.50 11.00 3.00 9.00
TimeSheet for the Period Ending 6/30/2015 Monday,July 06, 2015
7:19:49 AM
American Structurepoint, Inc.
Employee RBRINKMAN Brinkman, Robert
Signed
Brinkman, Robert
Posted
Payne, Sharon
Project Phase Task Labor Total Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Code Hr 6/16 6/17 6/18 6119 6/20 6/21 6/22 6/23 6/24 6/25 6/26 6/27 6/28 6/29 6/30
0002014.00444.0002 00100 IN090 00 r Reg 91.50 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 9.50 10.00
Labor Category:Construction Inspector OVT 17.50 1.00 1.00 8.00 2.00 2.50 3.00
Daily Totals Reg 91.50 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 9.50 10.00
OVT 17.50 1.00 1.00 8.00 2.00 2.50 3.00
TimeSheet for the Period Ending 6/30/2015 Monday,July 06, 2015
7:19:49 AM
American Structurepoint, Inc.
Employee EEVERETT Everett, Eric
Signed
Everett, Eric
POSted
Approved
Cross, Ryan
Project Phase Task Labor Total Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Code Hr 6/16 6/17 6/18 6/19 6/20 6/21 6/22 6/23 6/24 6/25 6/26 6/27 6128 6/29 6130
0000000 00000.0010 00304 00 Reg 5.00 5.00
Labor Category: OVT 0.00
0002011.00525.0001 00100 IN090 00 Reg 55.00 10.00 15.00 3.00 1.00 5.00 11.00 10.00
Labor Category Construction Inspector OVT 8.00 8.00
0002014.00444.0002 00100 IN090 00 Reg 29.00 9.00 8.00 7.00 3.00 2.00
Labor Category:Resident Project Representative OVT 2.00 2.00
Daily Totals Reg 89.00 10.00 15.00 3.00 9.00 8.00 8.00 8.00 7.00 11.00 10.00
OVT 10.00 8.00 2.00
TimeSheet for the Period Ending 6/30/2015 Monday,July 06,2015
7:16:35 AM
American Structurepoint,Inc.
Employee HGRIMSTAD Grimstad, Heather
Signed
Grimstad,Heather P0stb2 n
Approved (lL1�Jl
Snyder,Charles
Project Phase Task Labor Total Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Code Hr 6/16 6/17 6/18 . 6/19 . 6/20 6/21 6/22 6/23 6/24 6/25 6/26 6/27_6/28 6/291_6/30
0000000.00000.0010 00302 00 Reg 14.50 1.00 2.50 8.00 3.00
Labor Category: OVT 0.00
0002011.00525.0001 00100 IN090 00 Reg 24.00 8.00 8.00 8.00
Labor Category:Construction Inspector OVT 0.00
0002014.00444.0002 00100 IN090 00 Reg 12.50 7.00 5.50
Labor Category:Construction Inspector OVT 0.00
Daily Totals Reg 51.00 8.00 8.00 8.00 8.00 8.00 8.00 3.00
OVT 0.00
TimeSheet for the Period Ending 6/15/2015 Wednesday,July 01,2015
9:57:16 AM
American Structurepoint,Inc. ,//
Employee JAREEVES Reeves,Jay
Signed
Reeves,Jay P0Sted
Approved
Wildt,Clarence
Project Phase Task Labor Total Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon
Code Hr 6/1 612 6/3 6/4 6/5 616 617 _ 6/8 619 6110 6/11 6/12 6/13 6/14 6/15
0002014.00444.0002 00100 IN090 00 Reg 74.50 8.00 8,00 8.00 2.51 8.00 8.00 8.00 8.00 8.00 8.00
Labor Category:Construction Inspector OVT 13.00 1.00 1.00 1.00 1.01 2.00 2.00 1.00 4.00
0002014.02344.0001 01000 10000 00 Reg 13.50 8.00 5.50
Labor Category:Construction Inspector OVT 0.00
Daily Totals Reg 88.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
OVT 13.00 1.00 1.00 1.00 1.00 2.00 2.00 1.00 4.00
Monday,July 06,2015
TimeSheet for the Period Ending 6/30/2015 7:16:36 AM
American Structurepoint,Inc.
Employee JAREEVES Reeves,Jay
Signed
Reeves,Jay p O sta cd1 n
Approved
Wildt,Clarence
Project Phase Task Labor Total Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Code Hr 6/16 6/17 6/18 6/19 6/20 6/21 6/22 6/23 6/24 6/25 6/26 6/27 6/28 6/29 6/30
0002014.00444.0002 00100 IN090 00 Reg 91.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 10.00 9.00
Labor Category:Construction Inspector OVT 0.00
0002014.00444.0002 00100 IN090 00 Reg 0.00
Labor Category:Construction Inspector(Ovt) OVT 8.00 1.00 2.00 2.00 3.00
Daily Totals Reg 91.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 10.00 9.00
OVT 8.00 1.00 2.00 2.00 3.00
TimeSheet for the Period Ending 6/30/2015 Monday,July 06,2015
7:16:35 AM
American Structurepoint, Inc.
Employee RCROSS Cross, Ryan
Signed
Cross,Ryan P O S t2/lr�l�Jl
n
Approved
Snyder,Charles
Project Phase Task Labor Total Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Code Hr 6/16 6/17 6/18 6/19 6/20 6/21 6/22 6/23 6/24 6/25 6/26. 6/27 6/28 6/29 6/30
0000000.00000.0010 00304 00 Reg 95.50 6.25 11.50 9.75 9.75 9.25 5.50 7.25 11.50 7.00 5.50 2.50 4.75 5.00
Labor Category: OVT 0.00
0002009.01450.0002 00100 IN090 00 Reg 0.50 0.25 0.25
-
Labor Category:Project Manager OVT 0.00
0002011.00525.0001 00100 IN090 00 Reg 1.75 0.75 0.25 0.75
Labor Category:Project Manager OVT . 0.00
0002013.00518.1003 00100 00200 00 Reg 2.7 1.00 0.25 1.50
Labor Category:Project Manager OVT • 0.0
0002013.00518.1003 00200 00200 00 Reg 1.50 1.50
Labor Category:Project Manager OVT • 0.00
0002013.00547.0001 00700 00040 00 Reg 4.50 0.50 1.00 1.50 1.00 0.50
Labor Category:Project Manager OVT 0.00
0002013.01777.0001 00200 IN090 00 Reg 2.75 2.50 0.25
Labor Category:Project Engineer OVT 0.00
■
0002013.01777.0001 00500 IN090 00 Reg 1.50 1.50
Labor Category:Project Engineer OVT 0.00
0002014.00157.0001 00200 C0090 00 Reg 0.50 0.50
Labor Category:Project Manager OVT 0.00
0002014.00444.0002 00100 IN090 00 Reg 0.25 0.25
Labor Category:Project Manager OVT 0.00
Fluid Waste Services, Inc. Invoice
P. 0. Box 264
Noblesville, IN 46061 B''' c1 e l boL " '
Date Invoice#
317 773-7996
7/9/2015 WO-]4294
Bill To
City of Carmel Street Department Customer P.O./Job# F.T.#
3400 West 131st Street
Westfield, IN 46074 2398
US
ORIGINAL
• Project Terms
11091 Hintocks Circle Net 30
Description Qty Rate Amount
Date of Work:Thursday 7-9-15 1 0.00 0.00
Site Contact: Dan Greskamp 317-714-3058
•
Site Address: 11091 Hintocks Circle
FWS Crew:CG/JC
Units&Equipment:1-05
Water: Indy-]
Disposal :N/A
Field Notes:
Rootcut 12" RCP line to restore flow as directed.
Jet Truck 2.75 205.00 563.75
Water Rental and 1-120 Usage Fee I 62.00 62.00
Thank you,for your,business-we appreciate it very much! Please reference Invoice#on remittance.
Total $625.75
Payments/Credits $0.00
Balance Due $625.75
Invoice
Rundell Ernstberger Associates,Inc.
618 E.Market Street DATE INVOICE#
Indianapolis, IN 46202
7110/2015 141370-7
BILL TO
City of Cannel
Department of Engineering
Attn: Jeremy Kashman
One Civic Square ORIGINAL
Carmel,IN 46032
PROJECT
Keystone Ave/Main Street RAB
•
Item Description Prior Billed Total Billed Current Billed
Additional Services Amendment#4
PO#31846
Schematic Design Fee: $16,500.00(hourly)
Construction Documentation Fee: $14,500.00(hourly)
Bidding Fee: $2,500.00(hourly)
Construction Admin Fee: $6,000.00(hourly)
Total Fee: $39,500.00
Plus expenses
REA Time May 1,2015 to May 31,2015
Schematic Design Schematic Design Fee: $16,500.00(hourly) $16,500.00 $16,500.00 0.00
REA time exceeds fee: $455.00
General Construction Documentation Fee:$14,500.00(hourly) $14,500.00 $14,500.00 0.00
Time exceeds REA fee,REA fee exceeded:$16,841.00
Irrigation Design $0
Enverity Engineering SO
Bidding/Addenda Bidding Fee:$2,500.00(hourly) $1,492.00 $2,015.50 523.50
Chalfant 2.75 hrs($138.00/hr=$379.50
Maydalc 1.50 hrs @$138.00/hr=$144.00
Enverity Engineering:$0
Expenses Reproductions,Printing,Postage and Mileage $119.76 $119.76 0,00
Phone# Fax#
Total Due $523.50
317-263-0127 317-263-2080
44 PM Rundell Ernstberger Associates, Inc.
107/15 Time by Job Detail
June 2015
Date Name Duration Notes
City of Carmel:Keystone Ave!Main Street Roundabouts
Construction Documents:Bidding/Addenda
06/01/2015 Chalfant,Cheryl L 0.25
06/03/2015 Chalfant,Cheryl L 1.00
06/05/2015 Koger,Kyle D 1.50 Update CD sheets to reflect June 04 Bid Date.Save environmental report for 116th and Gray Street R
06/05/2015 Chalfant,Cheryl L 1.50
Total Construction Documents:Bidding/Addenda 4.25
Total City of Carmel:Keystone Ave/Main Street Rounda... 4.25
TOTAL 4.25
•
Keller Macaluso LLC Date 7/21/2015
Invoice#2380
760 3rd Avenue SW, Suite 210 Invoice
Carmel, Indiana 46032 Phone # 317-660-3400
(317) 660-3400 Fax# 317-660-3401
www.kellermacaluso.com
Bill To Federal ID:27-1716316
City of Carmel
Douglas C.Haney Esq.
Department of Law ORIGINAL
One Civic Square
Carmel,Indiana 46032
07-21 -15P05 :34
01007-098:Engineering-Exchange with Edward Rose
Professional Fees
Service Date Initials Description of Services Time Amount
06/01/2015 TH Correspondence regarding exchange. 0.20 69.00
06/18/2015 TH Work on documents for exchange;telephone conferences and 1.50 517.50
correspondence regarding same.
06/19/2015 TH Correspondence regarding resolution and publishing notice. 0.20 69.00
06/22/2015 TH Work on public notice and resolution;telephone conferences 1.60 552.00
and correspondence regarding same.
06/24/2015 TN Telephone conferences and correspondence regarding 0.50 172.50
resolutions;work on same.
06/25/2015 TH TeIephone conferences and correspondence regarding closing 0.30 103.50
matters.
06/26/2015 TH Work on closing matters. 0.50 172.50
Sub-total Fees: $1,656.00
Expenses Units Price Amount
06/25/2015 Publication Fee-Star Media 1.00 154.34 154.34
06/25/2015 Publication 1.00 64.53 64.53
Sub-total Expenses: $218.87
Payments
07/20/2015 Payment Payment received-thank you 2,120.54
Sub-total Payments: $2,120.54
Total Current Billing: $1,874.87
Previous Balance Due: $2,120.54
Total Payments: $2,120.54
Terms:Upon Receipt Total Now Due: $1,874.87
Pagel ofl
TK-Too Keller EJN-Eric Neidlinger SO-Shari Owens
MM-Matthew R Macaluso JS-Jennifer Schulz KH-Kaye Howard
TH-Tammy Haney EL-Erica Leath
CONSTRUCTION PROJECT INVOICE
DATE: July 13, 2015
COMPANY NAME: Sub-Surface of Indiana, Inc.
AND ADDRESS 7225 West 700 South
Morgantown, Indiana 46160
TELEPHONE NO.: (812)-597-4195 ORIGINAL
FAX NO.: (812)-597-4196
PROJECT NAME: Bridlebourne Drainage Modifications
PROJECT NO.: 13-07
INVOICE NO.: 4
TOTAL EARNINGS TO DATE: $ 357,889.42
MINUS 5% RETAINAGE: (-) 18,215.78
(5% of Total Contract Price $364,315.52)
TOTAL EARNED MINUS RETAINAGE: $ 339,673.64
MINUS PREVIOUS PAYMENTS: (-) 279,995.56
TOTAL AMOUNT DUE: $ 59,678.08
#a, re5ka
Dan Greskamp
Construction Manager
City of Carmel
CUSTOMER-City of Carmel
PROJECT-Bridlebourne Drainage Modifications,Project No. 13-07
CONTRACTOR-Sub-Surface of Indiana, Inc.
PROGRESS PAY ESTIMATE NO.4
For work done during the period of: 3/21/2015 through 6/21/2015
Quantity Quantity
Bid Unit Scheduled Installed in Total Quantity Total Pay to Total Pay this
Description Bid Quantity Installed this
rn Price Amount Previous Pay To Date Date Estimate
Estimates Pay Estiamte
1 Construction Engineering 1 LS $ 9,000.00 $9,000.00 1.00 LS LS 1.00 LS $9,000.00 $ -
2 Mobilization&Demobilization 1 LS $ 25,000.00 $25,000.00 0.75 LS 0.25 LS 1.00 LS $25,000.00 $ 6,250.00
3 Clearing of Right of Way 1 LS $ 17,000.00 $17,000.00 1.00 LS LS 1.00 LS $17,000.00 $ -
4 Common Excavation 17,975 CYS $ 7.00 $125,825.00 17975.00 CYS CYS 17975.00 CYS $125,825.00 $ -
5 Tree,Remove and Replace 7 EA $ 785.00 $5,495.00 3.50 EA 3.50 EA 7.00 EA $5,495.00 $ 2,747.50
6 Fence,Remove and Restore 54 LFT $ 60.00 $3,240.00 13.50 LFT 40.50 LFT 54.00 LFT $3,240.00 $ 2,430.00
7 Stone Paver,Salvage and Replace 55 SYD $ 185.00 $10,175.00 50.00 SYD 5.00 SYD 55.00 SYD $10,175.00 $ 925.00
8 Storm Structure,Remove 6 EA $ 600.00 $3,600.00 6.00 EA EA 6.00 EA $3,600.00 $ -
9 Pipe,12"RCP,Remove 120 LFT $ 20.00 $2,400.00 120.00 LFT LFT 120.00 LFT $2,400.00 $ -
10 Pipe,15"RCP,Remove 232 LFT $ 10.00 $2,320.00 232.00 LET LFT 232.00 LFT $2,320.00 $ _
11 Pipe,18"RCP,Remove 232 LFT $ 10.00 $2,320.00 246.00 LFT LFT 246.00 LFT $2,460.00 $
12 Pipe,24"RCP,Remove 151 LFT $ 15.00 $2,265.00 144.00 LFT 0.87 LFT 144.87 LFT $2,173.04 $ 13.04
13 Curb,Concrete,Remove 44 LFT $ 18.00 $792.00 54.00 LFT LFT 54.00 LFT $972.00 $
14 Curb,Concrete 44 LFT $ 57.00 $2,508.00 54.00 LFT LFT 54.00 LFT $3,078.00 $ -
15 Coarse Aggregate,#2 Stone 210 TON $ 20.00 $4,200.00 210.70 TON TON 210.70 TON $4,214.00 $ -
16 Structural Backfill 34 CYS $ 40.00 $1,360.00 17.00 CYS 17.00 CYS 34.00 CYS $1,360.00 $ 680.00
17 Pipe,Circular,RCP,18 IN 140 LFT $ 43.00 $6,020.00 140.00 LFT LFT 140.00 LFT $6,020.00 $ -
18 Pipe,Circular,RCP,30 IN 151 LFT $ 57.00 $8,607.00 144.00 LFT LFT 144.00 LFT $8,208.00 $ -
19 Pipe,Circular,RCP,36 IN 586 LFT $ 57.00 $33,402.00 552.00 LFT 34.00 LFT 586.00 LFT $33,402.00 $ 1,938.00
20 Manhole,Type J 5 EA $ 4,100.00 $20,500.00 5.00 EA EA 5.00 EA $20,500.00 $ -
21 Concrete End Section,18 IN 2 EA $ 400.00 $800.00 2.00 EA EA 2.00 EA $800.00 $ -
22 Concrete End Section,30 IN 1 EA $ 600.00 $600.00 1.00 EA EA 1.00 EA $600.00 $ -
23 Concrete End Section,36 IN 2 EA $ 850.00 $1,700.00 2.00 EA EA 2.00 EA $1,700.00 $ -
24 Compacted Agreggate,No.8 129 TON $ 18.00 $2,322.00 197.72 TON TON 197.72 TON $3,558.96 $ -
25 Maintenance of Traffic 1 LS $ 1,700.00 $1,700.00 1.00 LS LS 1.00 LS $1,700.00 $ -
26 Mobilization&Demobilization for Seeding 2 EA $ 500.00 $1,000.00 0.00 EA 2.00 EA 2.00 EA $1,000.00 $ 1,000.00
27 Catch-All Inlet Protection 4 EA $ 250.00 $1,000.00 4.00 EA EA 4.00 EA $1,000.00 $ -
28 Silt Fence Inlet Protection 3 EA $ 100.00 $300.00 0.00 EA 3.00 EA 3.00 EA $300.00 $ 300.00
29 Silt Fence 2,860 LFT $ 1.33 $3,803.80 1840.00 LET 260.00 LFT 2100.00 LFT $2,793.00 $ 345.80
30 Erosion Control Blanket 3,957 SYS $ 1.52 $6,014.64 0.00 SYS 3957.00 SYS 3957.00 SYS $6,014.64 $ 6,014.64
31 Rip Rap,Class 2 305 TON $ 45.00 $13,725.00 61.69 TON 122.97 TON 184.66 TON $8,309.70 $ 5,533.65
32 Rock Check Dam 3 EA $ 825.00 $2,475.00 1.00 EA EA 1.00 EA $825.00 $ -
33 Seeding&Restoration 31,417 SYS $ 0.90 $28,275.30 0.00 SYS 31417.00 SYS 31417.00 SYS $28,275.30 $ 28,275.30
34 Dewatering 1 LS $ 4,315.26 $4,315.26 1.00 LS LS 1.00 LS $4,315.26 $ -
35 Change Order No.1-Waterline Work 1 LS $ 6,860.62 $6,860.62 1.00 LS LS 1.00 LS $6,860.62 $ -
36 Change Order No.2-Light Pole&Item No.5 Trees 1 LS $ 3,394.90 $3,394.90 0.00 LS 1.00 LS 1.00 LS $3,394.90 $ 3,394.90
37
38
39
40
$364,315.52 $357,889.42 $59,847.83
TOTAL PAY THIS ESTIMATE $59,847.83
TOTAL PAY TO DATE $357,889.42
DEDUCT 10%RETAINAGE,UNTIL 50%COMPLETE THEN 0%RETAINAGE,5%AT END OF PROJECT $18,215.78
DEDUCT PREVIOUS NET PAY ESTIMATE(S)NO. 1 &NO.2&NO.3 $279,995.56
NET PAY ESTIMATE NO.04 $59,678.08
City of Carmel Signa Dale
7- /3 - /"
City of Cannel Inspector Signal e / Date
A 0, 7 , 6 _ (5_
Sub-Surface of Indiana .ture Date
Please make checks p.. to Sub-Surface of Indiana,Inc. Payment is expected within 30 days unless other mutually agreeable arrangtnents have been made.