Loading...
HomeMy WebLinkAboutOLCO/ENG/CO4/0/Shared Use Path Main StreetTO: CITY OF CARMEL. CONTRACT CI-HANGE ORDER NO.: 4 DATE: 6/5/15 PROJECT NAME: Sharers Use Path Main Street CITY REQ. NO.: CITY PO NO.: CITY PO DATE: L You are directed to make the following changes in this Contract: Adjust intermediate completion date due to delay in Notice to Proceed SCHEDULED ADJUSTMENT ITEM AMOUNT (±) OR (-) DAYS II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: INDOT Change Order 4 The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order • $_890 008.01 Contract Price will be increased/decreased by this Change Order $ 0.00 New Contract Price including this Change Order $ 890.008.01 Contract Time Prior to this Change Order • Days 11/30/15 Intermediate Completion Date Net increased/decreased resulting from this Change Order_140_ Days Current Contract Time including -this Change Order Days 4/19/15 Intermediate Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended ENGINEER 300 S . fibriet ,, / Address _s)2L1fii. T-" ¥Gees City/State/Zip By: . or? Phone: 3/ ‘in :io Date: A/VS The Above Changes Are Accepted: 01 re ,_1 CONTRACTOR VoL Q i Address edei.t.ILjjd L000C. City/State/Zip ?a4 11 �cl Phone: Approved: n - c33.-0705 Date: 41'/Off) IS Diana Cordrav, Jlerk- Treasurer Date: quo JEREMY KASHMAN Contract No:R -36869 Change Order No.: 004 INDIANA Department of Transportation Construction Change Order and Time Extension Summary Contract Information Contract No.: R -36869 District:GREENFIELD DISTRICT AE:Nierman, Chad Change Order Information Change Order No.: 004 Date Generated: 00/00/0000 Date Approved: 00/00/0000 Reason Code: INCENTIVE/DISINCENT, Intermediate Compl Description: Time Adjustment for Lat Notice to Poceed Original Contract Amount $ 821,339.94 Current Change Order Amount $ 0.00 Total Previous Approved Changes Total Change To -Date Modified Contract Amount Time Extension Information Date Initiated 00/00/0000 Original Contract Time Time Element Description: Current Time Extension Previous Time Approved Revised Contract Time $ 0.00 $ 0.00 $ 821,339.94 Date Completed 00/00/0000 Page: 1 Letting Date:08/06/2014 PE/S:Gregg, Michael Status:Pending EWA: N or Force Acct: N Percent: 0.000 Percent: 0.000 % Percent: 0.000 % SS Completion Date 00/00/0000 or SS Calendar/VVork Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) SS Days 0 SP Days 0 SS Days by AE: DCE: SP Days Value $ 0.00 DDCM: SCE: SS Days SP Days Value $ SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SS Date 00/00/0000 or SP Days 0 Contract No:R -36869 Change Order No.: 004 INDIANA Department of Transportation Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority ($ per Change Order) (Days per Contract) Verbal Approval Required? Total Change To-Date>5%? Scope/Design Recommendation Required? Approval Authority Concurs with PM? LPA Signatures Required? FHWA Signatures Required? Page: 2 AE: DCE: SCE: * DDCM: (-LE$250K-)(-LE$750K-)(--LE$2M)(--GT$2M—) (50 SS days ) ( 100 SS days ) ( 200 SS Days ) ( GT 200 SS days) Y / N If Y by Date Issued Y / N If Y , Copy to Program Budget Manager Y / N If Y, Referred to Project Manager(PM) Date to PM Date Returned Y / N If Y, Concurrence by Date If N,Resolution: Approved Disapproved Resolved by Date Y / N If Y, Date to LPA Date Retumed Y / N If Y, Date to FHWA Date Returned * Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments: Contract No:R -36869 INDIANA Date:06/08/2015 Change Order No:004 Department of Transportation Page: 3 Contract: R -36869 Project: State:138316600LC3 Change Order Nbr: 004 Change Order Description: Time Adjustment for Lat Notice to Poceed Reason Code: INCENTIVE/DISINCENT, Intermediate Compl CLN PCN PLN Item Code Unit Unit Price CO Qty Comment Amount Change Total Value for Change Order 004 = $ 0.00 Milestone Time Adjustment MileSione Nbr: 01 Milestone Description: INTERMEDIATE COMPLETION DATE Original Completion dt: 11/30/2014 Adj comp) dt 04/19/2015 Explanation: Adj No. of Days 140 Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change Is recommended. General or Standard Change Order Explanation The issuance of the Notice to Proceed (NTP) was delayed by 19 days. At this time of contract award. the intermediate date was intended to be extended along with the contract completion date, but this task was overlooked. At the pre -construction meeting, this oversight was brought to the attention of the Area Engineer, and it was agreed that this date would be extended by change order. This change order extends the intermediate completion date 140 days to April 19, 2015 and includes the winter non -work days of December through March. The contract completion date was extended the same amount of days. Change Order Explanation for Specific Line Item It is the intent of the parties that this change order is full and complete compensation for the work describe above. Notification and consent to this change order is hereby acknowledged. Contractor. 1 i _ «1 . 11:„ i Date: 611.04) i / dj Signed By: ([_14' / remtr i4 / NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManeger system. Contract No:R -36869 INDIANA Change Order No:004 Department of Transportation APPROVED FOR LOCAL PUBLIC AGENCY (Tr( �ylu�ar (SAT RE) (TITLE) (SIGNATURE) PENS Date:06/08/2015 Page: 4 12:2] i (DATE) (TITLE) (DATE) IA -AY SUBMITTED FOR CONSIDERATION APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION Approval Level Name of Approver Date Status Project Engineer/Supervisor Gentry, Thomas 00/00/0000 Action Pending Area Engineer Nierman, Chad 00/00/0000 Action Pending District Construction Director Fegan, Roland 00/00/0000 Action Pending State Construction Engineer Pankow, Greg 00/00/0000 Action Pending