CONTRACT CI-HANGE ORDER NO.: 4
DATE: 6/5/15
PROJECT NAME: Sharers Use Path Main Street
CITY REQ. NO.:
CITY PO NO.:
CITY PO DATE:
L You are directed to make the following changes in this Contract:
Adjust intermediate completion date due to delay in Notice to Proceed
SCHEDULED ADJUSTMENT
ITEM AMOUNT (±) OR (-) DAYS
II. The following referenced Documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.:
Other: INDOT Change Order 4
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order • $_890 008.01
Contract Price will be increased/decreased by this Change Order $ 0.00
New Contract Price including this Change Order $ 890.008.01
Contract Time Prior to this Change Order • Days 11/30/15 Intermediate Completion Date
Net increased/decreased resulting from this Change Order_140_ Days
Current Contract Time including -this Change Order Days 4/19/15 Intermediate
Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are
Recommended
ENGINEER
300 S . fibriet ,, /
Address
_s)2L1fii. T-" ¥Gees
City/State/Zip
By:
. or?
Phone: 3/ ‘in :io
Date: A/VS
The Above Changes Are
Accepted:
01 re ,_1
CONTRACTOR
VoL Q i
Address
edei.t.ILjjd L000C.
City/State/Zip
?a4 11 �cl
Phone:
Approved:
n - c33.-0705
Date: 41'/Off) IS
Diana Cordrav, Jlerk-
Treasurer
Date:
quo
JEREMY KASHMAN
Contract No:R -36869 Change Order No.: 004
INDIANA Department of Transportation
Construction Change Order and Time Extension Summary
Contract Information Contract No.: R -36869
District:GREENFIELD DISTRICT AE:Nierman, Chad
Change Order Information Change Order No.: 004
Date Generated: 00/00/0000 Date Approved: 00/00/0000
Reason Code: INCENTIVE/DISINCENT, Intermediate Compl
Description: Time Adjustment for Lat Notice to Poceed
Original Contract Amount $ 821,339.94
Current Change Order Amount $ 0.00
Total Previous Approved Changes
Total Change To -Date
Modified Contract Amount
Time Extension Information
Date Initiated 00/00/0000
Original Contract Time
Time Element Description:
Current Time Extension
Previous Time Approved
Revised Contract Time
$ 0.00
$ 0.00
$ 821,339.94
Date Completed 00/00/0000
Page: 1
Letting Date:08/06/2014
PE/S:Gregg, Michael Status:Pending
EWA: N or Force Acct: N
Percent: 0.000
Percent: 0.000 %
Percent: 0.000 %
SS Completion Date 00/00/0000 or SS Calendar/VVork Days 0
SP Date 00/00/0000 or SP Days
(SS = Standard Specification, SP = Special Provision)
SS Days 0 SP Days 0
SS Days by AE:
DCE:
SP Days Value $ 0.00
DDCM:
SCE:
SS Days SP Days Value $
SS Completion Date 00/00/0000 or SS Calendar/Work Days 0
SS Date 00/00/0000 or SP Days 0
Contract No:R -36869 Change Order No.: 004
INDIANA Department of Transportation
Construction Change Order and Time Extension Summary
Review and Approval Information
Required Approval Authority
($ per Change Order)
(Days per Contract)
Verbal Approval Required?
Total Change To-Date>5%?
Scope/Design Recommendation
Required?
Approval Authority Concurs with PM?
LPA Signatures Required?
FHWA Signatures Required?
Page: 2
AE: DCE: SCE: * DDCM:
(-LE$250K-)(-LE$750K-)(--LE$2M)(--GT$2M—)
(50 SS days ) ( 100 SS days ) ( 200 SS Days ) ( GT 200 SS days)
Y / N If Y by Date Issued
Y / N If Y , Copy to Program Budget Manager
Y / N If Y, Referred to Project Manager(PM)
Date to PM Date Returned
Y / N If Y, Concurrence by Date
If N,Resolution: Approved Disapproved
Resolved by Date
Y / N If Y, Date to LPA Date Retumed
Y / N If Y, Date to FHWA Date Returned
* Field Engineer Recommendation (Required for SCE or DDCM Approval)
Field Engineer Date
Comments:
Contract No:R -36869 INDIANA Date:06/08/2015
Change Order No:004 Department of Transportation Page: 3
Contract: R -36869
Project: State:138316600LC3
Change Order Nbr: 004
Change Order Description: Time Adjustment for Lat Notice to Poceed
Reason Code: INCENTIVE/DISINCENT, Intermediate Compl
CLN PCN PLN Item Code Unit Unit Price CO Qty Comment Amount Change
Total Value for Change Order 004 = $ 0.00
Milestone Time Adjustment
MileSione Nbr: 01
Milestone Description: INTERMEDIATE COMPLETION DATE
Original Completion dt: 11/30/2014 Adj comp) dt 04/19/2015
Explanation:
Adj No. of Days 140
Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change Is recommended.
General or Standard Change Order Explanation
The issuance of the Notice to Proceed (NTP) was delayed by 19 days. At this time of contract award. the intermediate date was intended to be
extended along with the contract completion date, but this task was overlooked. At the pre -construction meeting, this oversight was brought to the
attention of the Area Engineer, and it was agreed that this date would be extended by change order. This change order extends the intermediate
completion date 140 days to April 19, 2015 and includes the winter non -work days of December through March. The contract completion date
was extended the same amount of days.
Change Order Explanation for Specific Line Item
It is the intent of the parties that this change order is full and complete compensation for the work describe above.
Notification and consent to this change order is hereby acknowledged.
Contractor. 1 i _ «1 . 11:„
i
Date: 611.04) i
/
dj
Signed By: ([_14' / remtr i4
/
NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManeger system.
Contract No:R -36869 INDIANA
Change Order No:004
Department of Transportation
APPROVED FOR LOCAL PUBLIC AGENCY
(Tr( �ylu�ar
(SAT RE) (TITLE)
(SIGNATURE)
PENS
Date:06/08/2015
Page: 4
12:2] i
(DATE)
(TITLE) (DATE)
IA -AY
SUBMITTED FOR CONSIDERATION
APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION
Approval Level Name of Approver Date Status
Project Engineer/Supervisor Gentry, Thomas 00/00/0000 Action Pending
Area Engineer Nierman, Chad 00/00/0000 Action Pending
District Construction Director Fegan, Roland 00/00/0000 Action Pending
State Construction Engineer Pankow, Greg 00/00/0000 Action Pending