HomeMy WebLinkAboutYardberry/Eng/CO 1/23800/Shared Use Path 136th StTO:
CITY OF CARMEL
CONTRACT CHANGE ORDER NO.: 1
DATE: 6/5/15
PROJECT NAME: Shared Use Path 136th Street
CITY REQ. NO.:
CITY PO NO.:
CITY PO DATE:
I. You are directed to make the following changes in this Contract:
Construct a coffer dam, dewatering and removal of unsuitable foundations materials for three -
sided -arch culvert extension.
SCHEDULED ADJUSTMENT
ITEM AMOUNT (+) OR (-) DAYS
II. The following referenced Documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order: R.F.I'.: W.D.C. No.:
Other: Contractors Pricing
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $ 666,736.5
Contract Price will be increased/decreased by this Change Order $ 23,800.00
New Contract Price including this Change Order $ 690,536.50
Contract Time Prior to this Change Order Days 5/19/15 Completion Date
Net increased/decreased resulting from this Change Order 22 Days
Current Contract Time including this Change Order Days 6/10/15 Completion Date
This Change Order is for frill and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are
Recommended
/� /
ENGINEER
.3oo s, /12E,e/Aiw
Address
2n/O4M/fteolrs.Zv 942zs
City/State/Zip
By:
"2-67,7 11(1
Phone: 3i7-60.352 '
Date: 7k2 B/6"
The Above Changes Are
I Accepted:
ONTRACItOR
90 4) S WOW •
ddr •ss
UncteAsoo lti Ll bc/
City/State/Zip
13y:
Phone: ILP-- 37 X
'183
Date: Va.2) I
Approved:
Diana Cordray, Clerk -
Treasurer /
Date: 57/ ill 5 -
JEREMY
JEREMY KASHMAN
Contract No:R -36889 Change Order No.: 001
INDIANA Department of Transportation Page: 1
Construction Change Order and Time Extension Summary
Contract Information Contract No.: R -36889 Letting Date:08/06/2014
District:GREENFIELD DISTRICT AE:Nierman, Chad PE/S:Gregg, Michael Status:Pending
Change Order Information Change Order No.: 001
Date Generated: 00/00/0000 Date Approved: 00/00/0000
Reason Code: CHANGED COND, Geotechnical Related
Description: Coffer Dam and Dewatering
Original Contract Amount $ 666,736.50
Current Change Order Amount $ 23,800.00
Total Previous Approved Changes $ 0.00
Total Change To -Date $ 23,800.00
Modified Contract Amount $ 690,536.50
Time Extension Information
Date Initiated 00/00/0000
Original Contract Time
Time Element Description:
Current Time Extension
Previous Time Approved
Revised Contract Time
Date Completed 00/00/0000
EWA: Y or Force Acct: N
Percent: 3.570 %
Percent: 0.000 %
Percent: 3.570 %
SS Completion Date 00/00/0000 or SS Calendar/Work Days 0
SP Date 00/00/0000 or SP Days
(SS = Standard Specification, SP = Special Provision)
SS Days 0 SP Days 0 SP Days Value $ 0.00
SS Days by AE: DCE: SCE: DDCM:
SS Days SP Days Value $
SS Completion Date 00/00/0000 or SS Calendar/Work Days 0
SS Date 00/00/0000 or SP Days 0
Contract No:R -36889 Change Order No.: 001
INDIANA Department of Transportation
Construction Change Order and Time Extension Summary
Review and Approval Information
Required Approval Authority
($ per Change Order)
(Days per Contract)
Verbal Approval Required?
Total Change To-Date>5%?
Scope/Design Recommendation
Required?
Approval Authority Concurs with PM?
LPA Signatures Required?
FHWA Signatures Required?
Page: 2
AE: DCE: SCE: * DDCM: *
(-LE$250K-)(-LE$750K-)(--LE$2M--)(--GT$2M--)
(50 SS days ) ( 100 SS days ) ( 200 SS Days ) ( GT 200 SS days)
Y / N If Y, by Date Issued
Y / N If Y , Copy to Program Budget Manager
Y / N If Y, Referred to Project Manager(PM)
Date to PM Date Returned
Y / N If Y, Concurrence by Date
if N, Resolution: Approved Disapproved
Resolved by Date
Y / N If Y, Date to LPA Date Returned
Y / N If Y, Date to FHWA Date Returned
* Field Engineer Recommendation (Required for SCE or DDCM Approval)
Field Engineer
Comments:
Date
Contract No:R -36889
Change Order No:001
Contract:
Project:
Change Order Nbr:
Change Order Description:
Reason Code:
CLN "PCN PLN
INDIANA Date:06/08/2015
Department of Transportation Page: 3
R -36889
1383165 - State:138316500LC3
001
Coffer Dam and Dewatering
CHANGED GOND, Geotechnical Related
Item Code Unit Unit Price CO Qty Comment Amount Change
0072 1383165 0072 206-51235 LS 23,800.000
Item Description: COFFERDAM
Supplemental Description/: Coffer Dam and Dewatering
Supplemental Descriptlon2:
Contract Completion Date Time Adjustment
Original Completion dt: 04/30/2015
Explanation:
1.000 C Amount:$ 23,800.00
Total Value for Change Order 001 = $ 23,800.00
Adj compl dt 05/22/2015 Adj No. of Days 22
Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change Is recommended.
General or Standard Change Order Explanation
Material composed of sands and gravels with surcharging water was encountered at the proposed east footing for the three -sided arch structure
No. 9. The material was unsuitable to support the structure. Recommendations from the geotechnical engineer included isolation with a coffer
dam, dewatering and removal of the material. The contractor's proposed pricing was provided with a breakdown of anticipated costs for labor,
equlpement and materials. Upon review by project personnel, the proposed price was determined to be reasonable.
Change Order Explanation for Specific Line Item
It is the intent of the parties that this change order is full and complete compensallon for the work describe above.
Notification anrJ consent to this change order is Hereby acknowledged.
Contractor:
Date:
Le I I 5-- lis—'
Signed By:
NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system.
Contract No:R -36889 INDIANA Date:06/08/2015
Change Order No:001 Department of Transportation Page: 4
AT RE)
(SIGNATURE)
PETS
APPROVED FOR LOCAL PUBLIC AGENCY
Ce-DeEtDEirlf6
(TITLE)
(DATE)
(TITLE) (DATE)
SUBMITTED FOR CONSIDERATION
APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION
Approval Level Name of Approver Date Status
Project Engineer/Supervisor Gentry, Thomas 00/00/0000 Action Pending
Area Engineer Nlerman, Chad 00/00/0000 Action Pending
Yardberry Landscape Excavating Company
Commercial - Industrial - Residential
9940 S. 1000 W., Anderson, IN 46017 Ph. (765)378-5783 Fax: (765) 378.0376
R -36889-A Change Order Quote:
Sheet Piling Rental $ 1,550
Pick Up & Deliver from Fort Wayne $ 1,000
Vibrator Hammer Rental $ 2,420
Pick Up & Delivery Vib. Hammer $ 680
1 Day Crew & 1- 200 Size Excavator $ tV5Rit
$ -S-
2 Laborers $550/day/ea. $ 1,100
1 Service Truck with Tools $ 750
1 Foreman $ 650
2 Flaggers for Traffic Control $ 1,100
''A Day to Remove Sheet Piling $ 2,000
$ 't6;25U-
/3,7So
Install De -watering Well:
(3 days, well casing, pump, generator rental, fuel) $ 2,600
Dig Out & Install Casing with Pea -Gravel Backfill $. 1,250
'$ 3,850
1 Day Dig Out Unsuitable Material, 1- 200 Size Excavator $ 2,500
2 Tri -Axle Dump Trucks $1000/ea. $ 2,000
2 Flaggers for Traffic Control $ 1,100
Dumping Bill for Unsuitable Material $ 600
$ 6,200
Total Quote
Total Days Requesting Time Extension -16 days
$ 26;366'
23,8x°
August 6, 2014
INDIANA DEPARTMENT OF TRANSPORTATION
Mr. David Littlejohn
City of Carmel
One Civic Sq
Cannel, IN 46032
Greenfield District
32 South Broadway
Greenfield, IN 46140
PHONE: (317) 467-3411 Michael R. Pence, Governor
FAX (317) 467-3955
Karl B. Browning, Commissioner
RE: LPA Award Recommendation
Dear Mr. Littlejohn:
Please sign and return this notification to verify the LPA is in agreement and wishes to award
the contract below, which is within INDOT LPA guidelines for approval.
Contract #:
R-36889
Des #:
1383165
Low Bid Consultant:
Yardberry Landscape Company
Low Bid Amount:
$666,736.50
Letting Date:
08/06/2014
Public A nc
Employee g y of Responsible Charge
Please do not hesitate to contact me if you have any questions.
Sincerely,
Cass n lm/}fuc4so-w
LPA Program Director
Greenfield District
www.in.gov/dot/
An Equal Opportunity Employer
Date Signed
Indiana