HomeMy WebLinkAboutYardberry/ENG/CO 2/1376/Shared Use Path 136thTO: CITY OF CARMEL CONTRACT CHANGE ORDER NO.: DATE: 6/5/15 7 PROJECT NAME: Shared Use Path 136th Street CPCY REQ. NO.: CITY PO NO.: CITY PO DATE: 1. You are directed to make the following changes in this Contract: Delete Item: Seed Mixture U Add Item Mulched Seeding U SCHEDULED ADJUSTMENT ITEM AMOUNT (+) OR (-) DAYS II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: Contractors Heine. The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 690.530.50 _Contract Price will be increased/decreased by this Change Order $ 1376.00 New Contract Price including this Change Order S 69 1.912.50 Contract Time Prior to this Change Order Days 6/10/15 Completion Date Net increased/decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order Days 6/10/15 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended Cia ENGINEER 3cv 5 filE.liDi.4N Address City/State/Zip By: o 4-e ;, 7 phone: 3"7-5o3--52So y(,zz Date: SSA— Phone: ./e5- SA The Above Changes Are c Accepted: Gl'r�besz'z L ivisofx CONTRACTOR ' 940 loco W. Address r tUn visa /N Ytaag City/State/Zip By: Phone:`7%j 37R- D• &S Date: ^✓a ails— Approved: Mary R - Member Lori' Wa , Member Tana Cordray, Treasurer Date: C// /,5 JEREMY KASHMAN Contract No:R -36889 Change Order No.: 002 INDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information District:GREENFIELD DISTRICT Change Order Information Contract No.: R -36889 AE:Nierman, Chad Change Order No.: 002 Letting Date:08/06/2014 PE/S:Gregg, Michael Status:Pending EWA: Y or Force Acct: N Date Generated: 00/00/0000 Date Approved: 00/00/0000 Reason Code: ERRORS & OMISSIONS, Item Related Description: Add Item Mulched Seeding, U; Remove Item Seed Mixture, U Original Contract Amount Current Change Order Amount Total Previous Approved Changes Total Change To -Date Modified Contract Amount Time Extension Information Date Initiated 00/00/0000 Original Contract Time Time Element Description: Current Time Extension Previous Time Approved Revised Contract Time $ 666,736.50 $ 1,376.00 $ 0.00 $ 1,376.00 $ 668,112.50 Date Completed 00/00/0000 Percent: 0.206 % Percent: 0.000 % Percent: 0.206 % SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) SS Days 0 SP Days 0 SP Days Value $ 0.00 SS Days by AE: DCE: SCE: DDCM: SS Days SP Days Value $ SS Completion Date 00/00/0000 or SS Calendar/ Work Days 0 SS Date 00/00/0000 or SP Days 0 Contract No:R -36889 Change Order No.: 002 INDIANA Department of Transportation Page: 2 Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority ($ per Change Order) (Days per Contract) Verbal Approval Required? Total Change To-Date>5%? Scope/Design Recommendation Required? Approval Authority Concurs with PM? LPA Signatures Required? FHWA Signatures Required? AE: DCE: SCE: "DDCM: (-LE$250K-)(-LE$750K-)(—LE$2M—)(--GT$2M--) (50 SS days ) ( 100 SS days ) ( 200 SS Days ) ( GT 200 SS days) Y / N If Y, by Date Issued Y / N If Y , Copy to Program Budget Manager Y / N If Y, Referred to Project Manager(PM) Date to PM Date Returned Y / N If Y, Concurrence by Date If N,Resolution: Approved Disapproved Resolved by Date Y / N If Y, Date to LPA Date Returned Y / N If Y, Date to FHWA Date Retumed " Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Comments: Date Contract No:R -36889 INDIANA Date:06/08/2015 Change Order No:002 Department of Transportation Page: 3 Contract: R -36889 Project: 1383165 - State:138316500LC3 Change Order Nbr: 002 Change Order Description: Add Item Mulched Seeding, U; Remove Item Seed Mixture, U Reason Code: ERRORS & OMISSIONS, Item Related CLN PCN PLN Item Code Unit Unit Price CO Qty Comment Amount Change 0039 1383165 0039 621-06554 LBS 15.000 -30.000 C Amount:$ -450.00 Item Description: SEED MIXTURE, U Supplemental Descriptlont: Supplemental Descrlptlon2: 0073 1383165 0073 621-06560 SYS Item Description: MULCHED SEEDING U Supplemental Descriptionl: Supplemental Descripuon2: 2.200 830.000 C Amount:$ 1,826.00 Total Value for Change Order 002 = $ 1,376.00 Whereas, the Standard Specificationsfor thls contract provides for such work to be performed, the following change Is recommended. General or Standard Change Order Explanation This change order will accomodate payment for fertilizer and mulching material required under SecIfication 621 tor seeding. The contract did not include Items for fertilizer and mulch. A new Item Mulched Seeding, U Is being added to the contract to replace Item 0041 Seed Mixture, U. The contractor's proposed unit pricing for the new pay Item was compared against recent bid history for this work and was deemed acceptable. Change Order Explanation for Specific Line Item It Is the Intent of the parties that this change order Is full and complete compensation for the work describe above. Notification and-orrsent to this change order is hereby acknowledged. Contractor: - Date ttrc( r Signed By: NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. Contract No:R -36889 Change Order No:002 (SIGNATURE) PENS Approval Level Project Engineer/Supervisor INDIANA Date:06/08/2015 Department of Transportation Page: 4 APPROVED FOR LOCAL PUBLIC AGENCY CZr✓/Zn16Z"%,(CdZ 7I2%I IS ITI TLE) (DATE) (TITLE) (DATE) SUBMITTED FOR CONSIDERATION APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION Name of Approver Gentry, Thomas Date 00/00/0000 Status Action Pending