City of Carmel Dcoket #15020017 TAC Carmel Fire Station 43
4 messages
Jordan, Alex <ajordan@carmel.in.gov>Wed, Jun 3, 2015 at 1:58 PM
To: Nilesh Shringarpure <nshringarpure@vsengineering.com>
Cc: "Kashman, Jeremy M" <jkashman@carmel.in.gov>, "Thomas, John G" <jthomas@carmel.in.gov>, "Barnes, David R"
<dbarnes@carmel.in.gov>
Good afternoon,
We have reviewed the latest submittal for this project and have the following comments:
Engineering:
Comment 8. An SSD needs to be placed under the proposed swale. The contour lines of the swale need to tie into the
existing contour lines at the stream bank. Also, a rock chute needs to be placed at the end of the swale and SSD extending
from the top of the stream bank to the toe of the slope. Please show this on plan view and provide a detail.
Comment 9. The construction limits seem to be different on pages C102 and C501.They should be consistent throughout the
whole set and should include all areas of disturbance. Also, we would like to see them on the C203 and C204.
SWPPP:
Comment 15. The disturbance on the east side appears to show temporary seeding or concrete immediately adjacent to the
building addition. Which will this be? Also, the silt worm needs to encompass the entire area of disturbance on the east side.
Additional Comment 1. Please show the anchoring method for the silt worm on the detail.
Additional Comment 2. Silt worm is not needed on the western perimeter of the new swale.
Please let me know if you have any questions.
Sincerely,
Alex Jordan
Plan Review Coordinator
City of Carmel Engineering Department
(317) 5712305
ajordan@carmel.in.gov
Nilesh Shringarpure <nshringarpure@vsengineering.com>Wed, Jun 3, 2015 at 2:00 PM
To: "Jordan, Alex" <ajordan@carmel.in.gov>
Thank you for your comments Alex. I will review and address them asap.
Nilesh