HomeMy WebLinkAboutYardberry/ENG/co1/-1,680.60/106th St DrainageCITY OF CARMEL
TO: Yardberry Landscape Excavating CONTRACT CHANGE ORDER NO.: CO 1 (EL
9940 S 1000 W DATE: September 1, 2015 dace
Anderson, Indiana 46017 PROJECT NAME: Project No. 15-06
Miscellaneous Drainage: 3740 W. 106th Street
Drainage Improvements Project and Cool Creek
Pond Outlet Rehabilitation
CITY REQ. NO.:
CITY PO NO.:
CITY PO DATE:
1. You are directed to make the following changes in this Contract:
This change order is a final balancing change order of all of the unit items. Please see
attached spreadsheet with adjusted items highlighted in yellow.
SCHEDULED ADJUSTMENT
ITEM AMOUNT (+) OR (-) DAYS
II. The following referenced Documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order: R.F.P.:NA W.D.C. No.: NA
Other:
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $ 73,059.00
Contract Price will be increased/decreased by this Change Order $ -1,680.60
New Contract Price including this Change Order $ 71 378.40
Contract Time Prior to this Change Order NA Days NA Completion Date
Net increased/decreased resulting from this Change Order NA Days
Current Contract Time including this Change Order Days Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Arc The Above Changes Are
Recommended Accepted: �
Approved:,)/!'� -}—
Tiffany Boone Yardberry Landscape Excavating Na ( U .0 O I
CITY OF CARMEL STAFF CONTRACTOR Jam Brain: d, Mayor
ENGINEER
One Civic Square 9940 S 1000 W
Address Address
Carmel, IN, 46032 Anderson, Indiana 46017
City/State/Zip
B
City/State/Zip
By:
Mary
Lori' Wat. , Member
ATT
Phone: (317) 571-2441
Date: gi.Zb�15
Date: G/21Is
Diana Cordr
Date: J 0/7
Clerk -Treasurer
7c>
Jere man
City of Carmel City Engineer
Total Contract Change Order =
($1,680.60)
Itemized Proposal
(15-06) 3740 W. 106th Street Drainage Improvements Project and Cool Creek Pond Outlet Rehabilitation
Item #
Item
Bid
Quantity
Actual
Quantity
Unit
Unit Cost
Bid Cost
Actual Cost
1
Mobilization/Demobilization
I
1
LS
52,000.00
52,000.00
52,000.00
2
Maintenance of Traffic
1
1
LS
52,500.00
52,500.00
52,500.00
3
Clearing Right of Way
1
1
LS
53,000.00
53,000.00
$3,000.00
4
Pipe Removal
50
50
LFT
$30.00
$1,500.00
51,500.00
5
Linear Ditch Grading
290
290
LFT
$20.00
55,800.00
55,800.00
., 6 _„12'tRCP',
-e _,.., , ,,.,
, ...,
.�. .:24
16 ..
'>LFT
.., :'$90.00_..
_$23160.009
v;=•` : 51,440.00-,
7
6” HDPE
50
50
LFT
530.00
51,500.00
51,500.00
.8 ,,
42" RCP ,<.,
_ 50
' _40
-
,".LFT"
",5270.00,'. '
'
"513,500:00,
- 510,800.00
9
12" Concrete Pipe End Section
2
2
EA
51,200.00
52,400.00
52,400.00
10
HDPE End Treatment
1
1
EA
$1,000.00
$1,000.00
51,000.00
11
42" Concrete Pipe End Section
1
1
EA
55,000.00
55,000.00
55,000.00
12
End Section Debris Guard
1
1
EA
52,500.00
52,500.00
52,500.00
13
CIP Structure
1
1
LS
58,000.00
$8,000.00
58,000.00
14
1.IMASurface'TypeA,-9.5',mm;
25
4
FON
5300.00
:8750.00'
51,200:00
15
HMAdntermediate, Type A, 1.9.0 mm
i.5
3'z
' TON
5250`00.5,
..
< ``.$875.00.
_ . ' 5730.00
a6_=Concrete-Patch;,ClassA,7
1721N
4:'SYS'
:$100.00.„:„"
.:540.0.002'
-`.., <$00.00
17
Compacted-Agg:-No. 53, Base'(Undistributed)
'20,
11:21
:TON
''540.00 ",
$800.00'
5448:40'
18 .
Mulched Seeding (Undistribute(1)- '
2,000 ,,
380.
SYS
$2.00 `"
;54,000.00
=8760.00
19
Erosion Contiol'Blanket
204,
1;190
:: SYS,
56:00
51,224.00,
57;140.00,
20
Erosion Control Measures
1
1
LS
$1,500.00
51,500.00
$1,500.00
21
Fence Reset (undistributed)
1
1
LS
51,850.00
51,850.00
51,850.00
22
Topsoil (Undistributed)
;",
:200 -
_'x185`
'
.'CYS
x_'$54.00' _<
. `,
510,800.00`
" 59,990.00 -
Total
573,059.00
571,378.40
Total Contract Change Order =
($1,680.60)