Loading...
HomeMy WebLinkAboutA0-1 General Information Dtd 09 22 20151.CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR WITH AND VERIFY THE EXISTING CONDITIONS. THESE DEMOLITION DRAWINGS SHALL SERVE TO AID THE CONTRACTOR IN HIS EVALUATION OF THE EXTENT OF DEMOLITION; BUT SHALL NOT BE HELD TO BE ALL INCLUSIVE. 2.CONTRACTORS SHALL BE RESPONSIBLE FOR ALL DEMOLITION REQUIRED FOR THE INSTALLATION OF NEW CONSTRUCTION AND AS NECESSARY TO FULFILL THE PURPOSE AND INTENT OF THE FINISHED WORK, WHETHER OR NOT IT IS SPECIFICALLY SHOWN OR NOTED IN THESE DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ITEMS CALLED TO BE REMOVED THROUGH OUT THE ENTIRE SET OF DOCUMENTS. 3.CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TO INSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTING BUILDING. IF THE INSPECTION INDICATES THAT THE STRUCTURAL INTEGRITY MAY BE IMPAIRED, NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY. 4.REMOVE ALL DAMAGED OR EXISTING FINISH MATERIALS FROM REMAINING WALLS, PARTITIONS AND COLUMNS (GYPSUM BOARD,WALL FABRIC, PANELING, TILE, MASONRY, CONCRETE, ETC...). PATCH WALLS AND COLUMNS AS REQUIRED TO RECEIVE NEW FINISH MATERIALS. 5.CONTRACTORS SHALL BE RESPONSIBLE FOR PROVIDING, INSTALLING AND MAINTAINING DUST TIGHT TEMPORARY CONSTRUCTION BARRIERS TO ALL AREAS WITHIN THE CONSTRUCTION LIMIT LINES, DURING THE CONSTRUCTION PROCESS. LOCATIONS SHALL BE COORDINATED WITH THE OWNER AND ARCHITECT. 6.ALL CONSTRUCTION AREAS, REMOVAL TRAFFIC PATTERN AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN OF DEBRIS BY THE CONTRACTORS DAILY. 7.PROTECT FROM DEMOLITION AND RECONSTRUCTION DEBRIS, ALL "EXISTING TO REMAIN" FIXTURES AND EQUIPMENT REQUIRED TO REMAIN IN PLACE DURING CONSTRUCTION. 8.REFER TO REMAINING DRAWINGS FOR RECONSTRUCTION. ALL CONTRACTORS SHALL COORDINATE THE DEMOLITION AND RECONSTRUCTION WORK, TO BE ASSURED THAT THEIR WORK IS COMPLIMENTARY TO THE WORK OF ALL OTHER CONTRACTORS AND COMPLETE IN ALL RESPECTS. 9.UNLESS NOTED OTHERWISE ALL DEMOLITION MATERIAL BECOMES THE PROPERTY OF THE CONTRACTORS AND IS TO BE REMOVED FROM THE PROPERTY, IN A LEGAL MANNER. THE OWNER RESERVES THE RIGHT AND SHALL BE GIVEN THE OPPORTUNITY TO CLAIM ITEMS WHETHER OR NOT THOSE ITEMS WERE SPECIFICALLY NOTED FOR REMOVAL, RELOCATION, OR AS RETURNED TO OWNER AND SAME SHALL BE RETURNED TO OWNER. 10.THE CONTRACTOR RESPONSIBLE FOR GENERAL DEMOLITION WORK SHALL COORDINATE ANY AND ALL ASBESTOS REMOVAL WITH THE OWNER. ALL ASBESTOS REMOVAL WILL BE PREFORMED BY A LICENSED ASBESTOS REMOVAL CONTRACTOR. THIS TYPICALLY INCLUDES FLOOR TILE, TILE MASTIC AND PIPE INSULATION. 11.ITEMS SHOWN IN LIGHTER PEN WEIGHTS ARE EXISTING TO REMAIN. 12.GENERAL CONTRACTOR RESPONSIBLE FOR PATCHING ALL REMOVED ELECTRICAL OUTLETS. ELECTRICAL CONTRACTOR TO PROVIDE GENERAL CONTRACTOR WITH QUANTITIES. 13.REMOVE EXISTING FINISHES AS REQUIRED TO INSTALL NEW FINISHES. PREPARE SURFACES TO RECEIVE NEW FINISH AS PER FINISH MANUFACTURER'S PRINTED INSTRUCTIONS, SEE FINISH SCHEDULE FOR NEW FINISHES. 14.REMOVE EXISTING CEILINGS AND CEILING SUPPORT SYSTEM WHERE NEW CEILINGS ARE INDICATED, UNLESS OTHERWISE NOTED. THESE NOTES SHALL APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND/OR SUBCONTRACTORS THAT WORK ON THIS PROJECT. INDICATES EXISTING WALL TO BE REMOVED IN ITS ENTIRETY. INDICATES EXISTING DOOR, FRAME AND ASSOCIATED HARDWARE TO BE REMOVED IN ITS ENTIRETY. SEE DOOR SCHEDULE FOR ITEMS TO BE SALVAGED AND REUSED IN OTHER AREAS. THESE NOTES APPLY TO ALL FLOOR PLANS, AND TO ALL CONTRACTORS AND/OR SUBCONTRACTORS THAT WORK ON THIS PROJECT. 1.OWNER WILL REMOVE ALL FURNISHINGS, LOOSE EQUIPMENT, SUPPLIES, ETC.... PRIOR TO CONSTRUCTION COMMENCING. 2.ALL EQUIPMENT AND MATERIALS LABELED AS "SALVAGE" OR "RELOCATE AS DIRECTED BY OWNER" SHALL BE REMOVED, PROPERLY PROTECTED AND TRANSPORTED TO A LOCATION ON THE PREMISES AS DIRECTED BY THE OWNER. 3.ALL GENERAL CONTRACTORS AND THEIR SUBCONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE CONSTRUCTION SITE TO BECOME FAMILIAR WITH ALL EXISTING CONDITIONS WHICH AFFECT THAT SPECIFIC PORTION OF THEIR WORK. ANY CONFLICTS OR APPARENT DEFICIENCIES MUST BE SUBMITTED TO THE ARCHITECT IN WRITING PRIOR TO BIDDING. 4.THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR INFORMING IN WRITING THE OWNER ON A WEEKLY BASIS OF THE CONSTRUCTION SCHEDULE FOR THE APPROACHING TWO WEEKS CONSTRUCTION ACTIVITY. ANY STORAGE OF MATERIALS, ACCESS OR EGRESS PROBLEMS, TRAFFIC FLOW OR NORMAL OWNER OPERATIONS WHICH ARE TO BE AFFECTED MUST BE PROTECTED AND/OR AGREED UPON BY THE OWNER. ALL COSTS SHALL BE INCURRED BY THE GENERAL CONTRACTOR. 5.THE GENERAL CONTRACTOR SHALL PROVIDE ALL NECESSARY WOOD BLOCKING FOR ALL TRADES. THIS BLOCKING SHALL BE FIRE RETARDANT. 6.ANY PLASTER WORK REQUIRING NEW FINISH SHALL BE SMOOTH, SOUND AND IN A FLUSH PLANE BEFORE FINISH APPLICATION. CONTRACTOR SHALL REPAIR THE SURFACE FOR THE NEW FINISH AS SCHEDULED. 7.ALL FIRE RATED WALLS AND FLOOR PENETRATIONS MUST COMPLY WITH ASTME-814. 8.ITEMS SHOWN IN LIGHTER PEN WEIGHT ARE EXISTING TO REMAIN. 9.REMOVE ALL DAMAGED GYPSUM BOARD, MASONRY, CONCRETE, PLASTER, ETC... FROM EXISTING SURFACES AND REPAIR TO MATCH ADJACENT CONSTRUCTION PRIOR TO REFINISHING. ALL SURFACES SHALL BE SMOOTH AND IN A FLUSH PLANE. 10.ALL CONSTRUCTION AREAS, REMOVAL TRAFFIC PATTERN AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN OF DEBRIS BY THE CONTRACTORS DAILY. 11.PROTECT FROM DEMOLITION AND RECONSTRUCTION DEBRIS, ALL "EXISTING TO REMAIN" FIXTURES AND EQUIPMENT REQUIRED TO REMAIN IN PLACE DURING CONSTRUCTION. 12.REFER TO REMAINING DRAWINGS FOR RECONSTRUCTION. ALL CONTRACTORS SHALL COORDINATE THE DEMOLITION AND RECONSTRUCTION WORK, TO BE ASSURED THAT WORK IN EITHER OF THESE AREAS IS COMPLEMENTARY TO THE OTHER AND COMPLETE IN ALL RESPECTS. ANY CONFLICTS OR APPARENT DEFICIENCIES MUST BE SUBMITTED TO THE ARCHITECT IN WRITING PRIOR TO BIDDING. 13.ALL WALL HUNG CASEWORK REQUIRES CONTINUOUS HORIZONTAL WOOD BLOCKING BETWEEN STUDS AT TOP AND BOTTOM OF CASEWORK. BRACE WALL TO DECK AS REQUIRED. 14.ALL DIMENSIONS ARE FROM FACE OF BASE MATERIAL (STUD/CMU) TO FACE OF BASE MATERIAL (STUD/CMU) UNLESS NOTED OTHERWISE. 15.PORTIONS OF THE BUILDING SHALL BE OCCUPIED DURING CONSTRUCTION. THE GENERAL CONTRACTOR SHALL FOLLOW THE FOLLOWING LIFE SAFETY ISSUES. FAILURE TO LIST ALL LIFE SAFETY ISSUES DOES NOT RELIEVE THE CONTRACTORS FROM COMPLYING WITH FEDERAL, STATE AND LOCAL CODES, THE CONTRACTUAL AGREEMENT BETWEEN THE CONTRACTOR AND OWNER, AND OTHER GOVERNING BODIES WHICH HAVE JURISDICTION ON THIS PROJECT. THE FOLLOWING ARE INTERIM LIFE SAFETY CODE ISSUES WHICH ARE SPECIFIC TO THIS PROJECT AND MUST BE ADDRESSED: a.INSURE ALL EXITS PROVIDE FREE AND UNOBSTRUCTED EGRESS. STAFF AND PERSONNEL SHALL RECEIVE TRAINING AND WRITTEN NOTIFICATION IF ALTERNATIVE EXITS MUST BE DESIGNATED. b.INSURE FREE AND UNOBSTRUCTED ACCESS TO EMERGENCY DEPARTMENTS OR SERVICES FOR EMERGENCY FORCES. COORDINATE WITH OWNER AND ARCHITECT. c.INSURE FIRE ALARM, DETECTION AND SUPPRESSION SYSTEMS ARE NOT IMPAIRED. A TEMPORARY, BUT EQUIVALENT, SYSTEM SHALL BE PROVIDED, INSTALLED AND TESTED PRIOR TO ANY EXISTING FIRE SYSTEM BEING IMPAIRED. d.INSURE TEMPORARY CONSTRUCTION PARTITIONS ARE SMOKE TIGHT AND BUILT OF NON COMBUSTIBLE MATERIALS. THESE PARTITIONS SHALL BE COORDINATED WITH THE OWNER AND ARCHITECT. e.SMOKING SHALL BE PROHIBITED EXCEPT IN DESIGNATED AREAS OF THE BUILDING. f.DEVELOP AND ENFORCE STORAGE, HOUSEKEEPING AND DEBRIS REMOVAL PROCEDURES THAT REDUCE THE FLAMMABLE AND COMBUSTIBLE FIRE LOAD TO THE LOWEST LEVEL NECESSARY FOR DAILY OPERATIONS. g.IOSHA REQUIRES MATERIAL SAFETY DATA SHEETS (MSDS) FOR ALL MATERIALS BEING USED OR STORED ON THIS PROJECT BE MADE AVAILABLE TO ALL WORKERS ON THIS JOBSITE. COPIES MUST BE PROVIDED TO THE OWNER'S DIRECTOR OF SECURITY, IMMEDIATELY, AS WORK BEGINS. h.SECURE ALL TOOLS AND CONSTRUCTION MATERIALS DURING BREAKS AND NON-CONSTRUCTION HOURS. 1.ALIGN ALL CEILING AND BULKHEAD REVEALS, CONTROL OR SEISMIC JOINTS WITH THE ADJACENT REVEAL, CONTROL OR SEISMIC JOINTS IN WALLS INDICATED ON ELEVATIONS. 2.ALL CEILING AND BULKHEAD HEIGHTS INDICATED ARE TO FINISHED FACE OF GYPSUM BOARD OR TO THE BOTTOM FACE OF ACOUSTICAL CEILING TILE PAD, UNLESS NOTED OTHERWISE. 3.CEILING CONTRACTOR TO PROVIDE ALL CEILING GRID TO SUPPORT HVAC SUPPLY DIFFUSERS AND RETURN GRILLS. 4.DEVICES OTHER THAN LIGHTING AND DIFFUSERS ARE SHOW IN APPROXIMATE LOCATIONS, FINAL LOCATION TO BE COORDINATED WITH ALL TRADES AND ARCHITECT. 5.AT LOCATIONS WHERE GYPSUM BOARD CEILINGS ARE INDICATED, THE CONTRACTOR HAS THE OPTION TO USE LIGHT GAGE METAL FRAMING OR SUSPENDED GYPSUM BOARD GRID UNLESS OTHERWISE DETAILED. THE CONTRACTOR WILL COORDINATE ANY MODIFICATIONS WITH THE OTHER TRADES ON THE PROJECT. THE CEILING CONTRACTOR'S FINAL MEANS AND METHODS WILL NOT CONFLICT WITH THE WORK OF OTHERS OR THE INTENT OF THESE DOCUMENTS. 6.WHERE EXISTING SUSPENDED ACOUSTICAL CEILINGS ARE SCHEDULED TO REMAIN, CUT AND PREP THE CEILING GRID IN PREPARATION FOR REPAIRING. SALVAGE ENOUGH CEILING PADS FOR RECONSTRUCTION. STORE AND PROTECT ALL MATERIALS. USE NEW MATCHING MATERIALS FOR RECONSTRUCTION AS REQUIRED. 7.SEE THE ROOM FINISH SCHEDULE FOR ADDITIONAL COMMENTS REGARDING MATERIALS AND FINISHES. 8.THE DESIGNATION 'CJ' INDICATES GYPSUM BOARD CONTROL JOINTS. WHERE INDICATED PROVIDE USG #093 ZINC CONTROL TYPICAL. INSTALL JOINT THROUGH THE FULL EXTENTS OF ANY GYPSUM CEILING OR BULKHEAD. WHERE THE GYPSUM CEILING COMPONENT MEETS A GYPSUM WALL, EXTEND THE CONTROL JOINT DOWN TO THE FLOOR TYPICAL. 9.THE GENERAL CONTRACTOR WILL PROVIDE AND INSTALL ALL SUPPLEMENTAL AND/ OR MISCELLANEOUS STEEL FRAMING AS REQUIRED BY THEMSELVES OR BY THEIR SUBCONTRACTORS FOR THE INSTALLATION OF THE EQUIPMENT SCHEDULED AND SPECIFIED. NOT ALL OF THE REQUIRED SUPPORT STEEL MAY BE DETAILED OR CALLED OUT FOR IN THESE DOCUMENTS. COORDINATE ALL REQUIREMENTS WITH THE SPECIFICATIONS, EQUIPMENT SUPPLIERS AND SUBCONTRACTORS. THERE WILL BE NO CHANGE ORDERS TO THE PROJECT FOR SUPPLEMENTAL STEEL WHERE OMISSIONS MAY OCCUR IN THE BIDDING DOCUMENTS. THESE NOTES APPLY TO ALL CONSTRUCTION DRAWINGS AND TO ALL CONTRACTORS AND/OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING. Architectural: Nick Slater Kyle Hardie MSKTD & Associates 317.917.1190 Interiors: Sarah Savage MSKTD & Associates 317.917.1190 ROOM NAME 101 1t 1 A 101A A101 1 SIM DETAIL NUMBER SHEET NUMBER DETAIL NUMBER SHEET NUMBER X X SHEET NUMBER DETAIL NUMBER NEW DOOR AND FRAME SPECIFIC CONSTRUCTION NOTES ROOM NAME AND NUMBER ELEVATION SYMBOL PLAN DETAIL NEW COLUMN LINE EXISTING COLUMN LINE SECTION PARTITION TYPE WINDOW ELEVATION SYMBOL TOILET ACCESSORY 1 SPECIFIC DEMOLITION NOTES 1i3.5Ax / Xx-x 1 A101 EXTEND TO 6" A.F.C. 1.5A 1.5B 3 5/8" METAL STUD @ 16" O.C. 5/8" GYPSUM BOARD EACH SIDE SOUND ATTENUATION BLANKET INSULATION 3 5/8" METAL STUD @ 16" O.C. 5/8" GYPSUM BOARD EXTEND TO 6" A.F.C. 1'-5" MIN. 1'-7" TO SEAT HDCP. MAX. 1'-5" MIN. SPACE MUST REMAIN FREE AND CLEAR OF OBSTRUCTION 2'-10" HDCP MAX. 2'-3" HDCP MIN. 8" 6" 9"2'-5" MIN. WALL MOUNT WATER CLOSET 17" - 19" MIN. CLEAR 2'-3" HDCP MIN. 9" MIN. 8" MAX 6" MAX 3' - 0" HDCP DRINKING FOUNTAIN 59" MIN. (AT FLOOR-MOUNTED TOILET) 4' - 10" 1' - 0" 56" MIN. (AT WALL-HUNG TOILET) TOILET PARTITION (WHERE OCCURS) 6" 12" MIN. 24" MIN. 16" - 18"33" - 3 6" 17" - 19" 17" MAX. ACC ESSIBL E HEIG HT 24" STD. 3' - 6" 1' - 0" 2' - 0" 15" MIN. WATER CLOSET SIDE WALL 1 1/2" DIA. GRAB BAR WITH 1 1/2" GAP FROM WALL WATER CLOSET BACK WALL URINAL ACCESSIBLE SEAT HT.TOILET PAPER MOUNTING AREA URINAL SCREEN (WHERE OCCURS) LAVATORY OR VANITY SINK 60" MIN. MIN. 9" 6" TOE SPACE 6" TOE SPACE SEE PLANS FOR PROJECT-SPECIFIC DIMENSIONS SEE PLAN NOTES: 1.REFERENCE THE CURRENT APPLICABLE STATE AND FEDERAL ACCESSIBILITY STANDARDS FOR ACCESSIBLE DESIGN. 2.SEE FLOOR PLANS AND OTHER DETAILS FOR APPLICABLE PROJECT SPECIFIC REQUIREMENTS AND DIMENSIONS. 3.AMBULATORY ACCESSIBLE COMPARTMENTS AND FIXTURES, WATER CLOSETS, AND TOILET COMPARTMENTS FOR CHILDREN'S USE ARE NOT SHOWN. SEE APPLICABLE CODES FOR REQUIREMENTS. 39" - 41" 54" MIN. 42" MIN. 12" MAX. MIN. 1 1/2" 15" MIN. 7" - 9"MIN. 9" TOILET PARTITION (WHERE OCCURS) VERTICAL GRAB BAR 36" MIN. STANDARD ROLL-IN-TYPE SHOWER WITH SEAT 60" MIN. WIDTH 30" MIN. DEPTH STANDARD ROLL-IN-TYPE SHOWER WITH SEAT MAX. 6" MAX. 6" 33" - 36"MIN. 1 1/2" 38" MIN. 48 " MAX. 27" MAX. 17" - 19 " SEAT HEIGHT CONTROL LOCATION FOLDING-TYPE ACCESSIBLE SHOWER SEAT 33" - 36" BACK WALL ALL METAL STUD WALLS OVER 10'-0" TALL SHALL BE LATERALLY BRACED ABOVE 10'-0" WITH 1 1/2" COLD ROLLED CHANNELS AT 48" O.C. VERTICALLY. ATTACHMENT SHALL BE AS DESCRIBED AND ILLUSTRATED IN THE "UNIMAST INCORPORATED", STEEL FRAMING SYSTEMS, TECHNICAL INFORMATION MANUAL. 0=EXISTING 1=METAL STUDS 2=MASONRY 3=WOOD 4=CONCRETE 5=MISC 0=EXISTING O= EXISTING CONSTRUCTION MATERIALS AND SIZE OF WALL ARE TO BE VERIFIED BY THE GENERAL CONTRACTOR 1=METAL STUDS 1=7/8" 2=1 5/8" 3=2" 4=2 1/2" 5=3 5/8" 6=4" 7=6" 8=EXTERIOR COMPOSITE WALLS 9= INTERIOR COMPOSITE WALLS 2=MASONRY 1=1 5/8" 2=2 5/8" 3=3 5/8" 4=5 5/8" 5=7 5/8" 6=9 5/8" 7=11 5/8" 8=EXTERIOR COMPOSITE WALLS 9=INTERIOR COMPOSITE WALLS 3=WOOD 1=1 1/2" (2") 2=2 1/2" (3") 3=3 1/2" (4") 4=4 1/2" (5") 5=5 1/2" (6") 6=7 1/4" (8") 7=9 1/4" (10") 8=EXTERIOR COMPOSITE WALLS 9=INTERIOR COMPOSITE WALLS 4=CONCRETE 1=4" 2=6" 3=8" 4=10" 5=12" 6=18" 7=24" 8=EXTERIOR COMPOSITE WALLS 9=INTERIOR COMPOSITE WALLS 5=MISC 1=PRE-ENGINEERED BUILDING DESCRIBES THE BASE WALL MATERIAL INDICATES THE DEPTH OF THE BASE WALL MATERIAL 1 . 5 A DESCRIBES THE MATERIALS BEING USED TO COVER THE BASE WALL MATERIALS. SEE SHEET A0.1 48" MAX. 2' - 10" HDCP. 15" MIN. SANITARY NAPKIN DISPOSAL TO OPERABLE MECH ANISM 4' - 0" MAX. SOAP DISPENSER 48" M AX H DCP. 54" M AX. TOILET SEAT COVER DISPENSER SANITARY NAPKIN / TAMPON DISPENSER TO OPERABLE MECHANISM 48" HDCP. FORWARD REACH TO OPE RABLE MECHANISM 54" MAX. SIDE R EACH ROBE HOOK SHOWER CURTAIN ROD HAND DRYER 48" MAX. HDCP. 6' - 0" 6' - 8" MAX. HDCP. 4' - 0" CENTERLINE OF UPPER MOST CONTROL CL 6" MIN. STAINLESS STEEL HINGED ACCESS PANEL 1'-4" X1'-4" STAINLESS STEEL HINGED ACCESS PANEL 1'-4" X1'-4" 3' - 6" MAX. ACCESS PANEL BELOW LAVATORY ACCESS PANEL ABOVE TOILET 48" MAX. TO OPERABLE MECHANISM 48" MAX. MIRROR PAPER TOWEL DISPENSER ABOVE LAVATORIE S, SINKS, OR COUNTE RS 40" MAX.* SEE PLAN ROOM SIGNAGE 5' - 0" 4" SURFACE MOUNTED FULL-LENGTH MIRROR SEE PLAN SEE PLAN 1' - 4"OTHER CONDITIONS ROBE HOOK 48" MAX. SHELVES 40" MIN. - 48" MAX. *DIMENSION IS TO BOTTOM OF REFLECTIVE SURFACE TOILET PAPER DISPENSER 15" MIN. 7" - 9" PROPOSED USE Healthcare Clinic CLASSIFICATION B-Business IBC sec. 308.3 CONSTRUCTION TYPE Type I-A IBC Table 601 AUTOMATIC SPRINKLERS Fully Sprinkled, Class I FLOOR AREA Medical Office Suite 5,530 sq. ft. HEIGHT (7) Seven Stories 106' - 8" FIRE RESISTANT REQUIREMENTS Structural Frame 3-Hours IBC Table 601 Exterior Bearing Walls 3-Hours Floor 2-Hour Roof 1-1/2 Hour Shafts 1-Hour (Less than 3-Stories)IBC 707.4 2-Hours (4 Story) Stairs 1-Hour (Less than 3-Stories)IBC 1005.3.2 2-Hours (4 Story) APPLICABLE CODES NFPA 101 Life Safety Code: 2000 Edition. Chapter 18 New Healthcare Occupancies Guidelines for Design and Construction of Hospital and Healthcare Facilities: 2001 Edition. Indiana Fire Prevention and Building Safety Code IAC 675 General Administrative Rules (GAR) Building Code:2014 Indiana Building Code Plumbing Code:2012 Indiana Plumbing Code (IPC) Electrical Code:2009 Indiana Electrical Code (IEC) Mechanical Code:2014 Indiana Mechanical Code (IEC) with Indiana Amendments The Indiana Energy Conservation Code (IECC), 2010 Edition (consisting of ASHRAE 90.1, 2007 Edition with Indiana Amendments) Fire Code:2014 Indiana Fire Code (IFC) Handicapped Accessiblility Code: 2014 Indiana Building Code Chapter 11 (consisting of 675 IAC 13-2.5-12 Chapter 11) 1 HOUR FIRE (Hazardous Rooms) 2 HOUR FIRE (Occupancy Separation, Smoke Proof Enclosures, Exit Passageways, and Vertical Openings SMOKE BARRIER WALL (1 Hour Rated Walls, 20 Min. Rated Doors) TRAVEL DISTANCE SMOKE TIGHT EXIT ACCESS CORRIDOR (Non-Rated Corridors; Hazardous Areas) FEC -Fire Extinguisher Cabinet DAVID ARCHI T E C T R E G I S TERED AR10500075 STATE OF I IND A AN No. SL T A E R N I C H LOAS Architecture | Engineering | Interior Design 1715 Magnavox Way Fort Wayne, IN 46804 260.432.9337 930 North Meridian Indianapolis, IN 46204 317.917.1190 www.msktd.com CERTIFICATION SHEET TITLE SHEET NUMBER SET DESCRIPTION PROJECT NO.DATE 6777 09-23-15 MSKTD& Associates Indiana University North Hospital - Outpatient Rehab 9/22/2015 4:52:34 PM General Information A0-1 11700 N. Meridian Street | Carmel, Indiana 46032 Renovation of General Demolition Notes General Reconstruction Notes General Ceiling Plan Notes Contacts Graphic Symbols Partition Types Plumbing Fixture Mounting Heights Partition Standards Toilet Accessory Mounting Heights Code Summary 1/16" = 1'-0" First Floor Life Safety Plan Rated Wall Legend REVISIONS DATE BY