Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A11-1 Room Finish Plan Dtd 09 22 2015
ADULT GYM K197 EXAM 5 K195 EXAM 4 K194 EXAM 3 K193 EXAM 2 K192 TEP / EXAM 1 K191 Pt. TOILET K190 SPEECH K188 STORAGE K187 FLEX ROOM 1 K186 STORAGE K179 Pt. TOILET K178E LINEN CABINETS K185 PEDS GYM K178 PEDS EXAM 1 K178D BREAK ROOM K181 EXAM 6 K178C ADULT CHARTING K199 STORAGE K198 5' x 6' THERAPY MAT 5' x 6' THERAPY MAT OFFICE K189 CONSULT K183 CORRIDOR K176A WORKROOM K177A RECEPTION K177 STORAGE K178A STORAGE K178B K172B AUDIO VIS K182 PUBLIC TOILET K172A WORK K170 SECURITY K170A OFFICE K170C OFFICEK170B SECURITY K172 CLASS K173 CLASS K1C09 CORRIDOR K1C10 ELEV LOBBY K174 CLASS K175 CLASS K1C06 ELEV LOBBY ELEV-2 ELEVATOR ELEV-3 ELEVATOR K180 PUBLIC TOILET K1C03 CORRIDOR PASSAGE K178F PT-3 PT-4 PT-5 PT-4 PT-5 PT-3 PT-4 PT-5 PT-3 PT-3PT-2 PT-2 PT-5 PT-3 PT-3 PT-4 PT-3 PT-2 PT-2 PT-2 PT-6 PT-6 CG CG CG CG CG CG CG CG CG CG CGCG CG CGCG CG CPT CPT CPT CPT CPT CPT CPT CPT CPT CPT CPT CPT CP T CPT CPT CPT CPT CPT CPT CPT CPT CPT VWC-1 (ATTIC STOCK) - INFILL PT-2 PT-2 PT-2 CPT CPT EXAM 6 K196 WAITING K176 CORRIDOR K1C13 WAITING K200 OFFICE K201 FLOORS CARPET TILE CPT-1 - MANNINGTON; SCENA; BORA BORA 8103. MONOLITHIC INSTALLATION. RUBBER TILE RT-1 - MOHAWK MEDIFLEX TILE; MOUNTAIN PATH TRST-23 RT-2 - MOHAWK MEDIFLEX TILE; GREEN APPLE TRST-38 RT-3 - MOHAWK MEDIFLEX TILE; CHEDDAR TRST-37 RT-4 - MOHAWK MEDIFLEX TILE; GEMSTONE TRST-29 CERAMIC TILE CT-1 - CROSSVILLE; EMPIRE SERIES; 14" x 14"; VS81 PALAIS TAUPE BASE RESILIENT BASE RB-1 - JOHNSONITE; 4" VINYL COVE BASE; 29 MOON ROCK CERAMIC TILE BASE CTB-1 - CROSSVILLE; EMPIRE SERIES; 6" x 14" COVE BASE; VS81 PALAIS TAUPE WALLS PAINT PT-1 - SHERWIN WILLIAMS; PANDA WHITE SW6147 PT-2 - SHERWIN WILLIAMS; VIRTUAL TAUPE SW7039 PT-3 - SHERWIN WILLIAMS; HARVESTER SW6373 PT-4 - SHERWIN WILLIAMS; SHAGREEN SW6422 PT-5 - SHERWIN WILLIAMS; DRIZZLE SW6479 PT-6 - SHERWIN WILLIAMS; BALANCED BEIGE SW7038 VINYL WALLCOVERING (ATTIC STOCK) VWC-1 - LEN-TEX; CORONADO SANDSTONE (ATTIC STOCK). CEILINGS ACOUSTICAL TILE CEILING ACT-1 - EQUAL TO ARMSTRONG DUNE 15/16 GRID; 24" x 24"; 1772 CASEWORK PLASTIC LAMINATE (CASEWORK, COUNTERS) PL-1 - PIONITE; MILLWORK CHERRY; SUEDE FINISH; WC431 PL-2 - FORMICA; ASHEN CERAMIC; MATTE FINISH; 7698-58 (PRODUCT TO BE DISCONTINUED. IF NOT ENOUGH STOCK IS AVAILABLE, SUBSTITUTE PIONITE IL PALIO PAPEL AV981 FOR PL-2) SOLID SURFACE COUNTERTOPS SS-1 - CORIAN; FOSSIL SS-2 - CORIAN; ANTRACITE FABRIC CUBICLE CURTAIN CC-1 - MAHARAM PEER 511463, 006 TROPICAL (SEE FINISH SCHEDULE FOR LOCATION) 1.SEE FINISH FLOOR PLAN FOR DIRECTION OF CARPET. PLANK DIRECTION INDICATED BY ARROWS. 2.SEE FINISH FLOOR PLAN FOR ACCENT WALL LOCATION. 3.SEE ELEVATIONS FOR CASEWORK DETAILS. 4.RUBBER TILE TO BE INSTALLED IN RANDOM PATTERN. 40% RT-1; 20% EACH FOR RT-1, RT-2, RT-3. 5.PAINT TO BE EPOXY AND SEMI-GLOSS. 6.FABRICATE AND INSTALL CUBICLE CURTAIN CC-1 PER HOSPITAL STANDARDS AND WHERE LOCATED ON REFLECTED CEILING PLAN. 7.PAINT BULKHEAD ABOVE RECEPTION DESK PT-6. SEE FIRST FLOOR FLECTED CEILING PLAN - HR ON SHEET A2-2. 8.SEE FLOOR PLAN FOR ACCENT WALL PAINT LOCATIONS AND CARPET DIRECTION. 9.PATCH INFILLED CONTRUCTION TO MATCH ADJACENT EXISTING. 10.PATCH INFILL EAST WALL OF CORRIDOR AT DOOR INFILL AND REMOVALS WITH OWNER ATTIC STOCK VINYL WALL COVER (VWC-1). (APPLICABLE THROUGHOUT ALL AREAS OF CONSTRUCTION) A.FOR ALL FLOORING MATERIALS INSTALLED ON GRADE OR BELOW GRADE: THE FLOORING CONTRACTOR SHALL BE RESPONSIBLE TO INCLUDE IN THEIR BID PRICES ALL REQUIRED MATERIALS AND LABOR FOR A COMPLETE INSTALLATION THAT MEETS THE MANUFACTURER'S TOTAL SYSTEM PERFORMANCE. THIS INCLUDES ALL PREP MATERIALS AND LABOR REQUIRED TO MEET MANUFACTURER'S WRITTEN SPECIFICATIONS FOR MOISTURE, PH, SMOOTHNESS OR LEVELNESS OR CLEANLINESS OF NEW OR EXISTING SUBSTRATES, ETC. THIS INSTALLATION SHALL INCLUDE THE MANUFACTURER'S SPECIFIED ADHESIVES, SEALERS, ETC. B.PAINT ALL HOLLOW METAL DOORS, WINDOW FRAMES, AND DOOR FRAMES PT-6, SEMI-GLOSS. C.GROUT TO BE EPOXY, COLOR BY ARCHITECT. D.ALL OUTSIDE DRYWALL CORNERS IN PUBLIC AREAS TO RECEIVE HIGH IMPACT CORNER GUARDS. MARKED ON FINISH FLOOR PLAN AS 'CG'. HEIGHT, FLANGE AND COLOR TO MATCH EXISTING. E.PATCH AND MATCH ALL FINISHES DUE TO CONSTRUCTION. F.SEE REFLECTED CEILING PLAN AND DETAILS FOR LOCATION AND HEIGHT OF CEILINGS. G.EVERY TRANSITIONS BETWEEN FLOORING MATERIALS TO BE FLUSH. IT IS FLOORING CONTRACTOR'S RESPONSIBILITY TO LEVEL SUBSTRATE AS NECESSARY FOR MATERIALS TO TRANSITION AT LEVEL HEIGHT, INCLUDING GRINDING OR BUILDING UP OF CONCRETE. ALL TRANSITION STRIPS TO BE STAINLESS STEEL EQUAL TO SCHLUTER SYSTEMS AND MUST MEET ADA; ALL PROFILES TO BE APPROVED BY ARCHITECT PRIOR TO INSTALLATION. TRANSITION STRIPS ARE UNNECESSARY BETWEEN LIKE MATERIALS (CARPET TO CARPET, LINOLEUM TO VINYL, ETC). H.PAINT VENTS, DIFFUSERS, ELECTRICAL PANELS, FIRE CABINETS (UNLESS THEY ARE NATURAL ALUMINUM OR STAINLESS STEEL), ETC. TO MATCH WALL COLOR. DAVID ARCHI T E C T R E G I S TERED AR10500075 STATE OF I IND A AN No. SL T A E R N I C H LOAS Architecture | Engineering | Interior Design 1715 Magnavox Way Fort Wayne, IN 46804 260.432.9337 930 North Meridian Indianapolis, IN 46204 317.917.1190 www.msktd.com CERTIFICATION SHEET TITLE SHEET NUMBER SET DESCRIPTION PROJECT NO.DATE 6777 09-23-15 MSKTD& Associates Indiana University North Hospital - Outpatient Rehab 9/22/2015 4:52:54 PM Room Finish Plan A11-1 11700 N. Meridian Street | Carmel, Indiana 46032 Renovation of 1/8" = 1'-0" First Floor Finish Plan Outpatient Rehab Room Finish Schedule Room No.Name Floor Base Walls Walls Walls Walls Ceiling Type (see RCP for heights)RemarksNESW K1C03 CORRIDOR EXT EXT EXT EXT EXT EXT EXT 9 K1C13 CORRIDOR CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 1 K176 WAITING CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 1 K176A CORRIDOR CPT-1 RB-1 PT-1 PT-3 PT-1 PT-1 ACT-1 1,2 K177 RECEPTION CPT-1 RB-1 PT-1,PT-2 PT-1 PT-1 PT-1,PT-2 ACT-1 1,2,3 K177A WORKROOM CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 1,3 K178 PEDS GYM SR-1,SR-2,SR-3,SR-4RB-1 PT-1 PT-1,PT-5 PT-1,PT-3 PT-1,PT-4 ACT-1 2,3,4 K178A STORAGE EXT EXT PT-1 PT-1 PT-1 PT-1 EXT - K178B STORAGE EXT EXT PT-1 PT-1 PT-1 PT-1 EXT - K178C EXAM 6 CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 1,3 K178D PEDS EXAM 1 CPT-1 RB-1 PT-1 PT-1 PT-4 PT-1 EXT 1,2 K178E Pt. TOILET CT-1 CTB-1 PT-6 PT-1 PT-1 PT-1 ACT-1 2,5 K178F PASSAGE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 1 K179 STORAGE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 1 K181 BREAK ROOM CPT-1 RB-1 PT-1 PT-2 PT-1 PT-1 ACT-1 1,2,3 K183 CONSULT CPT-1 RB-1 PT-1 PT-1 PT-1 PT-2 ACT-1 1,2 K185 LINEN CABINETS CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 1 K186 FLEX ROOM 1 CPT-1 RB-1 PT-1 PT-5 PT-1 PT-1 ACT-1 1,2,3 K187 STORAGE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 1 K188 SPEECH CPT-1 RB-1 PT-1 PT-3 PT-1 PT-1 ACT-1 1,2,3 K189 OFFICE CPT-1 RB-1 PT-1 PT-2 PT-1 PT-1 ACT-1 1,2 K190 Pt. TOILET CT-1 CTB-1 PT-1 PT-6 PT-1 PT-1 ACT-1 2,5 K191 TEP / EXAM 1 CPT-1 RB-1 PT-1 PT-1 PT-4 PT-1 ACT-1 1,2,3,6 K192 EXAM 2 CPT-1 RB-1 PT-5 PT-1 PT-1 PT-1 ACT-1 1,2,3,6 K193 EXAM 3 CPT-1 RB-1 PT-1 PT-1 PT-3 PT-1 EXT 1,2,3,6 K194 EXAM 4 CPT-1 RB-1 PT-4 PT-1 PT-1 PT-1 EXT 1,2,3,6 K195 EXAM 5 CPT-1 RB-1 PT-1 PT-1 PT-5 PT-1 EXT 1,2,3,6 K196 EXAM 6 CPT-1 RB-1 PT-1 PT-1 PT-3 PT-1 ACT-1 2,3,6 K197 ADULT GYM CPT-1 RB-1 PT-1 PT-1 PT-1 PT-3 ACT-1 2,3,6 K198 STORAGE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 - K199 ADULT CHARTING CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 3 K200 WAITING CPT-1 RB-1 PT-1 PT-2 PT-1 PT-1 ACT-1 1,7,8 K201 OFFICE CPT-1 RB-1 PT-1 PT-2 PT-1 PT-1 ACT-1 1,8 Color Legend Specific Remarks General Remarks REVISIONS DATE BY