Loading...
HomeMy WebLinkAboutC6.1 DRAINAGE MAPT/L T/L T/L T/L T/L T/L T/L R W R W R W BM ELEV = 852.27' 6''W6''W 6''SS6''SS GAS GASGAS FDC UGE&T UGE&T UGE&T UGE&T UGE&T UGE&T UGE&T UGE&T UGE UGT WIV 4''W INITIAL DATE DPOR PM DES DRW Engineering Associates, Inc. CEI PROJECT NO. NO. DATE REVISIONS 10/10/14 10/17/14 DESCRIPTION BZA SUBMITTAL ADLS/ DP SUBMITTAL 2/26/15 SUBMITTAL REVISED PER COMMENTS 4/30/15 SUBMITTAL REVISED PER COMMENTS 6/4/15 BID/PERMIT SET JOB # PROJ#28436.0 DRAWING: 28436 Storm.dwg LAST SAVED BY: RNEDKOV LOCATION: C:\CEI-CAD\Vault\28436.0 CLA - 116th St & College Av e - Carmel, IN\Drawings\Design\28436 Storm.dwg 0 20' 30' 40' SCALE IN FEET PROPOSED PROPERTY LINE/RIGHT OF WAY LINE CONTOUR ELEVATIONS STORM DRAIN XXX EMERGENCY FLOW ROUTE EXISTING FIRE HYDRANT LOCATED AT THE NE CORNER OF THE SITE ELEVATION = 852.27' SITE BENCHMARK NO PRESENT FLOODWAYS ON SITE THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN SPECIFIED AND AS APPROVED BY THE CITY OF CARMEL ON THE FINAL APPROVED CONSTRUCTION PLANS. DEVIATIONS FROM THE APPROVED DESIGN SHALL ONLY BE PERMITTED DUE TO SPECIAL CIRCUMSTANCES OR DIFFICULTY DURING CONSTRUCTION AND WILL REQUIRE PRIOR FIELD APPROVAL FROM A DESIGNATED REPRESENTATIVE OF THE CITY OF CARMEL IN ADDITION TO SUPPLEMENTAL APPROVAL BY THE DESIGN ENGINEER. AN EXPLANATION OF ANY SUCH DEVIATION SHALL BE INCLUDED AS A REQUIREMENT ON AS-BUILT/RECORD DRAWINGS SUBMITTED FOR RELEASE OF PERFORMANCE GUARANTEES. APPROVED DESIGN SLOPES IDENTIFIED AS GENERATING VELOCITIES OF 2.5 FPS OR LESS OR 10 FPS OR GREATER (AT FULL FLOW CAPACITY) SHALL REQUIRE AS-BUILT CERTIFICATION AT THE TIME OF CONSTRUCTION, PRIOR TO BACKFILLING THE PIPE. THE CONTRACTOR IS INSTRUCTED TO AS-BUILT EACH SECTION OF STORM PIPE AS IT IS BEING INSTALLED TO ENSURE COMPLIANCE WITH THE DESIGN PLANS AND AS APPROVED BY THE CITY OF CARMEL. OE OVERFLOW ELEVATION G GRATE ELEVATION PONDING AREA 6/2/15