Loading...
HomeMy WebLinkAboutD1.1 - DEMOLITION PLANProject Number: Sheet Title: Issue Date: Sheet Number: Project: CA R M E L , I N D I A N A 4 6 0 3 2 By: Architect: Architecture / Project Management: Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone) JD A / E N D E A V O R Drawn By Checked ByPrint Date Revisions: 20 0 S O U T H R A N G E L I N E R O A D SU I T E 2 0 9 IN D I A N A D E S I G N C E N T E R SUITE 209 D1.1 DEMOLITION PLAN Parcel 12 PEDCOR DESIGN GROUP, LLC PLAN NORTH 8/26/15 CONSTRUCTION DOCUMENTS THIS DOCUMENT IS AN INSTRUMENT OF SERVICE AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP, LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP, LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP, LLC. © COPYRIGHT 2006, 2007, 2008, JAMES R. STUTZMAN, AIA, CARMEL. 8/26/15 STATE RELEASE SET N KEY PLAN SCALE: N.T.S. SECOND FLOOR +46"+46" +46" +46"+46"D D +46"+46"+46" ELEC PANEL DP1 DP3 DP4 DP3 DP4 DP10 DP7 DP2 DP3 DP4DP9 DP1 DP3 DP4 DP1 DP3 DP4 DP1 DP3 DP4 DP1 DP3 DP4 DP1 DP3 DP4 DP1 DP3 DP4 DP5 DP6 DP2 DP6 DP6 DP6 DP8 DP11 DP11 DP11 DP6 DP12 DP13 DP13 F GE 8 8.1 10 11 9.1 8.15 9.9 10.9 10.85 9 1. DEMOLITION LEGEND:GENERAL DEMOLITION NOTES: REMOVE ALL WALLS, MILLWORK, DOORS AND DOOR FRAMES AS SHOWN DASHED. RESERVE DOORS AND DOOR FRAMES FOR RE-USE IN NEW PROJECT SCOPE. 2. 3. SAVE ALL ITEMS REMOVED FROM THE SPACE PER OWNER'S DIRECTION UNLESS NOTED OTHERWISE. EXISTING CONSTRUCTION TO BE REMOVED. EXISTING PARTITION TO REMAIN. DEMOLITION PLAN NOTES REMOVE DOOR/FRAME AND SAVE FOR REUSE. REMOVE EXISTING WALLS SHOWN AS DASHED AND PREP FOR NEW CONSTRUCTION.DP1 DP2 DP3 DP4 DP5 DP6 DP7 DP8 REMOVE EXISTING FLOORING AND BASE. PREP FOR NEW FLOORING. DUPLEX WALL OUTLET TO BE REMOVED. PHONE/DATA WALL OUTLET TO BE REMOVED. T DP9 THERMOSTAT TO BE REMOVED. REMOVE ALL EXISTING BLINDS AT PERIMETER WINDOW LIGHT LOCATIONS. BLINDS TO BE STORED IN SAFE LOCATION. BLINDS ARE TO BE CLEANED AND REINSTALLED AT PROJECT COMPLETION. 5. 4.DEMOLISH DENOTED EXISTING CEILING SYSTEM CLEARLY AND CLEANLY BACK TO A POINT WHERE INSTALLATION OF NEW CEILING SYSTEM IS POSSIBLE. SEE REFLECTED CEILING PLAN FOR EXTENT OF WORK. DEMOLISH EXISTING WALL AND/OR FLOOR SURFACES BACK TO A POINT WHERE INSTALLATION OF NEW FLOORING FINISHES IS POSSIBLE. 6. 7. REMOVE EXISTING FINISHES WHERE NEW FINISHES ARE TO BE INSTALLED. REFERENCE FINISH PLAN TO COORDINATE LOCATION OF NEW FINISHES. REMOVE ELECTRICAL AND DEVICE LINES IN WALLS THAT ARE TO BE REMOVED, INCLUDING ALL ATTACHED WIRING. DEMOLISH ELECTRICAL DEVICES AND WIRING BACK TO A POINT WHEREAS PROPER PREPARATION FOR NEW FINISHES IS POSSIBLE. SEE ELECTRICAL AND FINISH PLANS FOR FURTHER INFORMATION. 8.ALL DEMOLISHED RECEPTACLES FROM EXISTING WALLS TO REMAIN SHALL HAVE DRYWALL PATCHED AND REPAIRED PRIOR TO INSTALLATION OF WALL FINISHES.DP10 REMOVE ELECTRICAL/DATA/TV OUTLETS/BLANK JUNCTION BOXES INCLUDING ALL ATTACHED WIRING BACK TO THE MAIN PANEL. PATCH WALL AT REMOVED DEVICE LOCATION. EXIT SIGN TO BE REMOVED. LIGHT SWITCH TO BE REMOVED. EMERGENCY LIGHTING TO BE REMOVED. HORN/STROBE AND PULL STATION TO BE REMOVED. REMOVE SWITCHES AND ASSOCIATED WIRING. DENOTES AREA NOT IN CONTRACT. REMOVE EXISTING FIRE EXTINGUISHER CABINET. SAVE FOR REUSE. PATCH WALL AND PREP FOR NEW FINISH. 2X2 LIGHT FIXTURE TO BE REMOVED. REMOVE COAT ROD & SHELF. REMOVE ADJUSTABLE SHELVING. REMOVE EXISTING CASEWORK. INCLUDE SINK AND PLUMBING BACK TO DEMISING WALL. SAVE SINK FOR REUSE. REMOVE RECEPTION DESK WALLS AND COUNTERS. DP11 REMOVE TRACK LIGHT FIXTURES. SAVE FOR REUSE. DP12 REMOVE SUSPENDED CEILING SYSTEM AND LIGHT FIXTURES IN CLOSET THAT IS BEING DEMO'D. INCLUDE LIGHT, SWITCH, AND WIRING. DP13 REMOVE EXISTING FLUORESCENT DOWNLIGHTS. SAVE FOR OWNERS REUSE. PREP FOR NEW LED DOWNLIGHTS. N SCALE: 1/8" = 1'-0" 1 SECOND FLOOR DEMOLITION PLAN D1.1 MC BR