HomeMy WebLinkAbout250887 10/21/15 J, .e,�y CITY OF CARMEL, INDIANA VENDOR: 00351256
j; 1 ONE CIVIC SQUARE UNITED CONSULTING CHECK AMOUNT: $*****5,238.42*
:.. +': CARMEL, INDIANA 46032 1625 N POST ROAD CHECK NUMBER: 250887
9''��Tsa'�°� INDIANAPOLIS IN 46219 CHECK DATE: 10/21/15
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
900 R4462864 25302 13319-14 5,238.42 LPA CONTRACT-111TH &
�I
1625 North Post Road
- Indianapolis, IN 46219
UNITED Bus. (317)895-2585
COI1SUltlIla= Fax (317)895-2596
Carmel, City of Invoice number 13319-14
Jeremy Kashman, P.E. fes, d. 253®2 Date 09/08/2015
One Civic Square
Carmel, IN 46032 9 00 — a `�b2 Y Project 13-319 City of Carmel - 111th and
Pennsylvania Intersecton Improvements
For Professional Services rendered after July 31,2015 through August 31,2015
LPA
Project Name: 111th and Pennsylvania Intersection Improvements-Carmel
Contract No.:R-35550
Des No.: 1297165
Original Agreement Not to Exceed, Dated 07/31/2013=$182,000.00
Invoice Summary
Contract Total Current
Description Amount Billed Billed
Inspection 182,000.00 105,640.83 5,238.42
Total 182,000.00 105,640.83 5,238.42
Inspection
Professional Fees
Billed
Hours Rate Amount
Department Manager
Brian N. Miller
Project Time 13.00 193.42 2,514.46
Construction Manager 1
Daniel L. Hall
Project Time 15.50 113.52 1,759.56
Construction Manager 2
Patrick W. Shattuck
Project Time 4.00 87.54 350.16
Reimbursables
Billed
20 � Units Rate Amount
Miles "� �,�� 285.00 0.40 114.00
Consultant is
�v
RECEIVED , Billed
SEP 2015 Amount
CTL Engineering of Indiana, Inc. , CARMEL 500.24
®�
G CITYENGINEER
�
Invoice total 5,238.42
Carmel,City of Invoice number 13319-14
Page 1 of 2
L;armei,Uiryor invoice numoer Issia-14
Project_ 13-319 City of Carmel - 111th and Pennsylvania Intersecton Improvements Date 09/08/2015
Aging Summary
Invoice Number Invoice Date Outstanding Current Over 30 Over 60 Over 90 Over 120
13319-13 08/10/2015 15,809.73 15,809.73
13319-14 09/08/2015 5,238.42 5,238.42
Total 21,048.15 5,238.42 15,809.73 0.00 0.00 0.00
Approved by:
Brian N. Miller
Manager Const. Engineering Dept
Carmel,City of Invoice number 13319-14
Page 2 of 2
Timesheet
United Consulting
1
t
UNI E
Consulting=
ues ay, eptem er
Page 1 of 2
Brian N.Miller Employee ID:164
Timesheet date:8/7/2015
Target percent billable 0.00% Timesheet percent billable 31.71% Employee Status:Active
{ 161st and Oakridge Roundabout Inspection Department
15-306 + Inspection(Utility relocation related) 'Project Time 1 Manager 1.00 1.00
+City of Carmel - 111th and
`Pennsylvania Intersecton I
+Improvements f Department
13-319 Inspection Project Time Manager 2.00; 2.W 0.50 4.50
11161st and Oakridge Roundabout i Inspection Department
15-306Inspection Project Time Manager 1.00: 1.50' 2.50
_.......
_ . ..._. .._. _ ..
Bellefontaine Street Road Repairs Construction Inspection !Department
15-401 Construction Inspection Project Time Manager 2.00 2.00
146th Street from Ditch Road to �
Springmill Road Department
14-310 Inspection !Project Time Manager 2.00, 2.00
Keystone Avenue over 86th Street Department
15-305 Inspection-DES 1382613 Project Time Manager 1.00 1.00
Direct Total' 0.00' 0.00: 0.00' 6.00, 2.00: 2.00' 3.00' 13.00
Overhead _._
*s Administration ...........
7.00 3.00, 2.00; 3.00' 15.00,
;Pre-Contract 1.00 200; 4.00 3.00 3.00 13.00
Overhead Total 0.00 1.00 7.00 2.00'
7.00 5.00 6.00- 28.00
Regular Total 0.001 1.00 7.00; 8.00' 9.00 7.00 9.00 41.00'
Timesheet Total.' 0.00 1.00, 7.00 8.00:, 9.00' 7.00 9.00; 41.00'
Employee Signature Date Name Date
Employee submitted Brian N Miller 8/7/2015
Supervisor approved :,Brian N.Miller 8/7/2015
Supervisor Signature Date Accounting approved 1Michael D.Farrell 8/11/2015
Timesheet
United Consulting
f 1 ,
U,NITED
� D
Consulting=
- -Tuesday,September 08,2015
Page 2 of 2
"Notes
i Brian N.Miller Timesheet date:8/7/2015
a Overhead
Pre-Contract
8/2/2015 1.00iRegular Employee Note ;River Ridge
8/4/2015 2.00!Regular Employee Note:,River Ridge Fee proposal
8/5/2015; 4.00 Regular ; Employee Note:;River Ridge Fee proposal
8/6/2015; 3.00'Regular Employee Note River Ridge information and fee proposal
8/7/2015 t 3.00 Regular Employee Note River Ridge Fee Proposal and agreement
Administration
8/3/2015` 7.00 Regular Employee Note:'W/E 7/31 time sheet approval,Chris Miller mid year review,misc.
8/5/2015s 3.00 Regular Employee Note :Reachmore coaching meeting,misc.
_
8/6/2015; 2.00,Regular Employee Note: Johnson 607 drainage review for Steve Jones,misc.
8/7/2015 3.00 Regular Employee Note. Barry Pratt Mid Year review,CE Department expense approval
Timesheet
United Consulting
NITEDi s
Consulting=
-Tuesday,September 08,2015
Page 1 of 2
Brian N.Miller Employee ID:164
Timesheet date:8/14/2015
Target percent billable 0.00% Timesheet percent billable 32.69% Employee Status:Active
u - ... . • e __ .c �<'. 0: i`MW
a -a TO � e
...- . 3.
161st and Oakridge Roundabout Inspection `Department
;15-306 Inspection Project Time Manager 1.00, 1.00 5.00 3.50 10.50
'City of Carmel - 111th and t
Pennsylvania Intersecton
Improvements f Department
13-319 Inspection Project Time Manager 1.50 1.50
f i Post Road from 1-70 to 46th Street Department
i 15-304 Inspection Project Time Manager 1.00 1.00
Keystone Avenue over 86th Street Department
15-305 %Inspection-DES 1382613 Project Time ;Manager 1.00 1.00
146th Street from Ditch Road to
Springmill Road Department
14-310 Inspection Project Time Manager 1.00 1.00 2.00
? Midland-Monon and Monon South
Trail Improvements over Anna Kendall PART-TIME CONSTRUCTION
9 Drain INSPECTION Department
'14-203 MIDLAND MONON Project Time Manager 1.00 1.00
Direct Total: 0.00 0.00' 1.00 4.501 0.00 7.00 4.50 17.00
Overhead
_. _.__-_
"Administration = 1.00:! 6.00. 1.00 2.00' 1.00, 2.00 13.00'
?"$Pre-Contract 1.00i 3.00 5.00; 8.00; 3.00 2.00` 22.00 I
Overhead Total; 0.00 2.00: 9.00 6.00. 10.00' 4.00- 4.00, 35.00:
Regular Total' 0.00, 2.00' 10.00, 10.50' 10.00 11.00 8.50` 52.00
Timesheet Total 0.00 2.00; 10.00 10.50 10.00' 11.00 8.50 52.00.
Employee Signature Date Name Date
_. .. .._. .__
Employee submitted Brian N.Miller 8/15/2015
Supervisor approved. ;,Brian N.Miller 8/15/2015
Supervisor Signature Date Accounting approved Michael D.Farrell 8/25/2015
Timesheet
United Consulting
I
'` Consulting=
- - — - Tuesday,September 08,2015
Page 2 of 2
*Notes
i Brian N.Miller Timesheet date:8/14/2015
Overhead
s
Administration
8/9/2015! 1.00;Regular Employee Note: Time and expense approval
8/12/20151 2.001 Regular I Employee Note Department Manager meeting
8/13/2015; 1.00 Regular 1 Employee Note Bret Smiley mid year review
_._.8/13..n._.__ .. ._.._
Pre-Contract
8/9/2015 1 001 Regular Employee Note River Ridge Agreement and manhours
8/10/2015f 3.00;Regular j Employee Note: River Ridge Agreement and manhours
i 8/11/2015 5.00 Regular Employee Note River Ridge BOD packet
8/1212015' 8.001 Regular Employee Note River Ridge fee proposal
8/13/2015; 3.00!Regular Employee Note: River Ridge Fee Proposal
8/14/20151 2.00'Regular Employee Note: River Ridge CE Agreement
Timesheet
United Consulting
Uz N 1,T E D
Consulting=
Tuesday,September 08,2015
Page 1 of 2
Brian N.Miller Employee ID:164
i
Timesheet date:8/28/2015
Target percent billable 0.00% .Timesheet percent billable 42.50% Employee Status:Active
.. .e. .et.' .. .rte. a..>:... ,.e.
1 Post Road from 1-70 to 46th Street ; Department
15-304 Inspection Project Time Manager 1.00` 0.50' 1.50
__._-,__.......___-_._.v__.. .__ ____.___.... _.._._._. _
Keystone Avenue over 86th Street Department
115-305 Inspection-DES 1382613 Project Time Manager 1.50' 1.50
;161st and Oakridge Roundabout Inspection Department
15-306 Inspection Project Time .Manager 1.00 2.00' 2.00 5.00
13-914-01 ARC/Franklin Street
j Engineering Services
I
13-914-01 Muncie-Franklin Street
Area Drainage Project
City of Muncie Sanitary District 2013 ? Construction Inspection Services
Projects Construction Inspection Services Department
i 13-914 13-914-01 Project Time ,Manager 0.50' 0.50
Midland-Monon and Monon South i
Trail Improvements over Anna Kendall PART-TIME CONSTRUCTION
Drain +INSPECTION Department
14-203 MIDLAND-MONON Project Time Manager 0.50: 1.00 1.50,
City of Carmel - 111th and
Pennsylvania Intersecton !
Improvements Department
13-319 ;Inspection Project Time Manager 2.00 5.00 7.00
Direct Total, 0.000.00 1.00' 3.00 4.50 8.00' 0.50, 17.00
Overhead
I'IAdministration 6.00 3.00 1.00 10.00
! ILeave - _..
3.50 3.50
*;Pre Contract 1.00 4.00 4.50 9.50
Overhead Total' 0.00' 0.00, 7.00: 7.00 4.50; 0.00: 4.50 23.00
Regular Total 0.00: 0.00, 8.00 10.00_ 9.00 8.00' 5.00'. 40.00
...
_. _ _. .. _.
Timesheet Total' 0.00, 0.001 8.00 10.00' 9.00' 8.00, 5.00, 40.00
Timesheet
United Consulting
IDT EConsulting=
- Tuesday,September 08,2015
Page 2 of 2
Employee Signature Date Name Date
Employee submitted 'Brian N.Miller_ 8/28/2015
Supervisor approved 'Brian N.Miller 8/28/2015
Supervisor Signature Date Accounting approved .Michael D Farrell 9/4/2015
*Notes
Brian N.Miller Timesheet date:8/28/2015
Overhead
Administration
8/24/2015 6.00 Regular Employee Note:;time and expense approval
8/25/2015 3.00,Regular Employee Note:.Reachmore training and misc
3 Pre-Contract
-_...._.___. .
8/24/2015 1.009 Regular Employee Note. Fishers 106th and Cumberland LOI
8/25/2015, 4.00;Regular Employee Note: Fishers 106th and Cumberland LOI
8/26/2015� 4.50;Regular Employee Note 'Fishers 106th and Cumblerland LOI,Evansville Maryland St Water Insp fee
New Albany LOI review
t
1
Timesheet
United Consulting
UNIT9:ED
Consulting=
Tuesday,September 08,2015
Page 1
Daniel L.Hall Employee ID:127
Timesheet date:8/7/2015
Target percent billable 0.00% Timesheet percent billable 100%- Employee Status:Active
AMR 0
WON Z1103OU IM
. .
City of Carmel - 111th and
Pennsylvania Intersection
Improvements Construction
13-319 Inspection Project Time Manager 2 6.00 6.00
Bellefontaine Street Road Repairs =Construction Inspection Construction
i
115-401 Construction Inspection Project Time Manager 2 8.00 8.00 12.00' 2.00' 30.00
Direct Total 0.00' 0.00' 8.00 8.00 12.00 2.00 6.00, 36.00
Regular Total' 0.00, 0.00 8.00 8.00. 12.00 2.00 6.00 36.00
Timesheet Total 0.00, 0.00 8.00 8.00 12.00 2.00 6.00 36.00
Employee Signature Date Name Date
Employee submitted :Daniel L.Hall 8/7/2015
Supervisor approved Brian N.Miller 8/9/2015
Supervisor Signature Date Accounting approved 'Michael D.Farrell 8/11/2015
Timesheet
United Consulting
s .
Consulting=
Tuesday,September 08,2015
Page 1
Daniel L.Hall Employee ID:127
j Timesheet date:8/14/2015
Target percent billable 0.00% Timesheet percent billable 100% Employee Status:Active
Bellefontaine Street Road Repairs !Construction Inspection Construction
15-401 Construction Inspection ;Project Tme Manager 2 2.00' 1.00 8.00 7.00 18.00
i
_
e 161st and Oakridge Roundabout Inspection Construction
15-306 Inspection Project Time 'Manager 2 3.50 3.50
City of Carmel - 111th and ;
Pennsylvania Intersecton
Improvements Construction
113-319 ±Inspection Project Time Manager 2.50, 7.00. 9.50
Direct Total 0.00 0.00 8.00 8.00 0.00 8.00 7.00 31.00
Regular Total i 0.00; 0.00 8.00 8.00 0.00 8.00 7.00 31.00
Timesheet Total 0.00 0.00, 8.00' 8.00 0.00 8.00, 7.00 31.00
Employee Signature Date Name Date
Employee submitted Daniel L.Hall 8/21/2015
Supervisor approved Brian N.Miller 8/24/2015
Supervisor Signature Date Accounting approved Michael D.Farrell 8/25/2015
Timesheet
United Consulting
1
UNITED,
Consulting=
Tuesday,September 08,2015
Page 1
Patrick W.Shattuck Employee ID:427
Timesheet date:8/28/2015
Target percent billable 0.00% Timesheet percent billable 100% Employee Status:Active
. ,
I-ME MIR
f City of Carmel - 111th and
Pennsylvania Intersection
Improvements Construction
13-319 Inspection Project Time Manager 2 4.00, 4.00
;161st and Oakridge Roundabout Inspection Construction
? 15-306 t Inspection Project Time Manager 2 4.00. 4.00
INDOT-US 31 IR-30201, IR 35563, INDOT-US 31 IR-30201, IR 35563,
j IR-35600,and IR-35602 'IR-35600,&IR-35602 Construction
.15-317 Inspection DES 1296427 Project Time Manager 2 8.00. 8.00 8.00 8.00 32.00
INDOT-US 31 IR-30201, IR 35563, INDOT-US 31 IR-30201, IR 35563,
IR-35600,and IR-35602 IR-35600,&IR-35602 Overtime Billed as Construction
15-317 Inspection DES 1296427 'Project Time Manager 2 1.00' 7.00 8.00
INDOT-US 31 IR-30201,IR 35563, INDOT-US 31 IR-30201, IR 35563,
IR-35600,and IR-35602 IR-35600,&IR-35602 Construction
15-317 Inspection DES 1296427 Overtime Manager 2 1.00 1.00
------------
_ Direct To.._ . ta
I 8.00 0.00 8.00 8.00 8.00 9.00' 8 00 49.00
Regular Total 8.00 0.00 8.00; 8.00 8.00 8.00; 0.00 40.00
Overtime Total' 0.00. 0.00 0.00. 0.00 0.00 1.00 8.00 9.00
Timesheet Total, 8.00 0.00 8.00 8.00 8.00, 9.00' 8.00 49.00
Employee Signature Date Name Date
Employee submitted Patrick W.Shattuck 8/31/2015
Supervisor approved Brian N.Miller 9/2/2015
Supervisor Signature Date Accounting approved Michael D.Farrell 9/4/2015
v United Consulting Mileage Log
Pay Period
Employee Name: Brian N. Miller Ending: 8/7/15 Signature:
b
Numer
Employee ID#: 164 Job Approval:
Total Total
Date Job# Project Description and Phase Departure Location Arrival Location Vehicle(Year/Make) Begin Miles End Miles utiles Reimbursement
n$.55 per mile
7/28/15 13-319 Penn Office Jobsite 2013 Toyota 57,049 - 9.90
7/28/15.13-319 Carmel 111th and Penn Jo st fice _ o rota 57,067 57,085 18 9.90
7/29/15 13-319 Carmel l l lth and Penn ice Jobsite 2013 To o a 098 57,116 18 9.90
-� Carmel l l Ith and Penn Jobsite Office 2013 Toyota 57,116 57,134 R-
8/4/15 13-319 1 Carmel l l Ith and Penn Office Jobsite 2013 Toyota 57,626 57,644 18 9.90
8/4/15 13-319 Carmel 111th and Penn Jobsite Office 2013 Toyota 57,644 57,662 18 9.90
8/5/15 13-319 Carmel 111th and Penn Office Jobsite 2013 Toyota 57,831 57,849 18 9.90
8/5/15 13-319 Carmel 1 l Ith and Penn Jobsite Office 2013 Toyota 57,849 57,867 18 9.90
8/6/15113-319 Carmel l 11th and Penn Office Jobsite 2013 Toyota 57,891 1 57,909 18 1 9.90
8/6/15 13-319 Carmel 11 Ith and Penn Jobsite Office 2013 Toyota 57,909 57,927 18 9.90
TOTALS 99.00
108
United Consulting Mileage Log
Pay Period (�
Employee Name: Brian N. Miller Ending: 8/21/15 Signature:
-- - Job Number 1 J-J 19- - � - --
Employee ID#: 164 Approval:
Total Total
Date Job# Project Description and Phase Departure Location Arrival Location Vehicle(Year/Make) Begin Miles End Miles Miles Reimbursement
(a)8.55 per mile
8/11/15 13-319 Carmel l l Ith and Penn Office Jobsite 2013 Toyota 58,248 58,266 18 9.90
8/11/15 13-319 Carmel 111th and Penn Jobsite Office 2013 Toyota 58,266 58,284 18 9.90
TOTALS 36 19.80
United Consulting Mileage Log
Pay Period
Employee Name: Brian N. Miller Ending: 9/4/15 Signature:
Employee ID#: 164 Job Number 1 -319 Approval:
2�
Total Total
Date Job# Project Description and Phase Departure Location Arrival Location Vehicle(Year/Make) Begin Miles End Miles Miles Reimbursement
a,$.55 per mile
8/26/15 113-3197 Carmel 111th and Penn Office Jobsite 2013 Toyota 59,660 59.678 18 9.90
8/26/15 13-319 Carmel 111th and Penn Jobsite Office 2013 Toyota 59,678 1 59,696 18 9.90
8/27/15 13-319 Carmel 111 th and Penn Office Jobsite 2013 Toyota 59,742 59,760 18 9.90
8/27/15 13-319 1 Carmel l 1 ith and Penn Jobsite Office 2013 Toyota 59,760 59,778 18 9.90
TOTALS 72 39.60
United Consulting Mileage Log
Pay Period
Employee Name: Daniel L. Hall Ending: 8/7/15 Signature:
Employee ID#: 127 Job Number 1 j-319 pp
A royal:
Total Total
Date Job# Project Description and Phase Departure Location Arrival Location Vehicle(Year/Make) Begin Miles End Miles Miles Reimbursement
x,3.55 per mile
8/7/15 13-319 111th&Pennsylvania St. Office Job-site 2007 Dodge Ram 150,823 150,845 22 12.10
8/7/15 13-319 111th&Pennsylvania St. Job-site Office 2007 Dodge Ram 150,845 150,867 22 12.10
TOTALS 44 24.20
`✓ United Consulting Mileage Log
Pay Period
Employee Name: Patrick W Shattuck Ending: 9/4/15 Signature:
Employee ID#: 427 Job Number 13-319
Approval:
Total Total
Date Job# Project Description and Phase Departure Location Arrival Location Vehicle(Year/Make) Begin Miles End Miles Miles Reimbursement
(0,$.55 per mile
8/22/15 13-319 111th&Penn R.A.B office jobsite 09Dod e 114,622 114,638 16 8.80
8/22/15,13-319 111th&Penn R.A.B 15-306 jobsite 09Dodge 114,645 114,652 7 3.85
8/22/15 13-319 111th&Penn R.A.13 jobsite jobsite 09Dod e 114,652 114,654 2 1.10
TOTALS 25 13.75
CTL Engineering of Indiana,Inc.
4343 Saguaro Trail,Indianapolis,Indiana 46268
Phone:317/295-8650-Fax:317/295-8395
e-mail:cUin@cUeng.com -RECF1 I t.ovEEOWNEDCOMPANY
Consulting Engineers • Testing - Inspection Services - Analytical Laboratories
FEDERAL I.D.NUMBER 35-2045625 AUG 12 2015
REMIT TO:
' P.O.Box 44548
Invoice UNITED CONSULTING ENGINEERS,INC. Columbus,OH 43204
Invoice Number IN-054150
Brian Miller Invoice Date July 31, 2615
To:
United Consulting Engineers & Arch.
1625 North Post Road Please Pay This Amount: 500.24
Indianapolis, IN 46219-1995
Project: 15020008IND Materials Testing Services
INDOT Contract No. See Below
,• SN .Marina .Cosnty
Project Manager: Daniel B. Westphal
Professional Services for the Period: 06/21/2015 to 07/18/2015
INDOT Contract Number R-35550- 111th and Pennsylvania - Invoice per attached breakdown. ..
*** Total Project Invoice Amount: 500.24
$
!Copp.Z4i APPROV P01� PAYMENT
Dept. Head
Owner
Job No 13— 314 PWP Y=
Phase rye
Date InV®ICed
Dete PAid "
Billing Summary
Current Prior Total
$500.24 $1,313.00 •$1,813.24 '
Aged Receivables Total Current 31-60 61-90 91 +
1,313.00 0.00 0.00 810.12 502..88 0.00
Pr ject Manager
All invoices are due upon receipt. A late charge of 1.6% will be added to any unpaid balance after 30 days.
THIS IS YOUR INVOICE We Accept:
(PLEASE RETURN ONE COPY WITH YOUR PAYMENT) VI
PAYMENT IS DUE UPON RECEIPT Please Call Accounts Receivable
e
CTL Engineering, Inc.
4343 Saguaro Trail
Indianapolis, Indiana 46268 .
Phone:317-295-8650 Fax:317-295-8395
E-mail:ctlin@ctleng.com ENGINEEH(NG '
Consulting Engineers—Testing—Inspection Services—Analytical Laboratories
United Consulting
1625 North Post Road
Indianapolis,Indiana 46219
Reference: Qualified Technician Materials Testing Services
R-35550— 111th Street and Pennsylvania
15DZC(O$j)�IlD
Billing Period: 5/24/15 to 7/18/15
Description Quantity Unit Unit Cost Total Cost
[PEngineering Technician 8 Hour $50.00 $400.00
Overtime Hour $75.00
ear Gauge/DCP 2 Day $40.00 $80.00
age 46 Mile $0.44 $20.24
ct Engineer(P.E.) Hour $130.00
ed/Project Manager Hour $95.00
Total Cost $500.24
Staff Name Description Date Regular Time Overtime
Randy Fladeland Compaction No.53 5/29/15 4.00
Dan Wes hal Com action No. 53 6/3/15 4..00
Total 8.00 0.00
I
Weekly Timesheet Report
Weekly T heat �vjnl!Dnrinrl S` nr1�y f♦1�M5
f1.
Last Name:Fladeland First Name:Randy Emp Id:FLA-R Branch-Dept:IND-02 TS# 117510
Project Number/ Billing Phase I Staff Sun Mon Tue Wed Thu Fri Sat Description Vehicle Bill Re&NB Re-imb Expense Code Non Re- Qty Bill Code
Client Name Group ST 1 OT ST I OT ST I OT ST I OT ST/OT ST 1 OT ST 1 OT Used Mile Mile Exps Imb
g ExsS
AIIIIIIIIIIIIII
;Engineers
08IND/United IND- 206 1013 .00 compaction Runzhei F-22.0 F-22.00
ting 02 mer 0
&Arch.
start 8:00 6:30 7:30 8:00 6:30
Stop 16:00 15:30 17:00 16:00 17:30
Lunch
Total Time 0.00 0.00 8.00 0.00 9.00 0.00 9.50 0.00 8.00 0.00 11.0 0.00 0.00 0.00
Weekly Time Total(Office Use Only):
Hourly:Y Total:45.50 ST:37.50 OT:0.00 Jury:0.00 Brvment:0.00
Salary: Vacation:0.00 Holiday:8.00 Sick:0.00 FMLA:0.00 Military:0.00 Total Reimb Miles Total Billable Miles
Odometer Readings for Vehicle(Company,Runzhemier&Personal)used for OfOcal and Personal purpose De artrMMI lead's A royal:22.00
Timesheet Date Vehicle ODOM Start ODOM Stop ODOM Miles Personal Miles Branch-Dept Approval Status Approved By
IND-02 Approved WES-D
Total Miles
Lunch Time Notes: Lunch Notes are not entered
Printed On:08/032015 Page 1 of 1
Weekly Timesheet Report Zfflff
�:sar�rsr
T1
Weekly Timesheet: Payroll Period:Sunday,05/31!20`15 to Saturday,0610612015
Last Name:Westphal First Name:Daniel Emp Id:WES-D Branch-Dept:IND. 2 TS#:117705
Project Number I Billing Phase Staff Sun Mon Tue Wed Thu Fri Sat Description Vehicle Bill Re&NB Re-Imb Expense Code Non Re- Qty Bill Code
Client Name Group ST I OT ST I OT ST I OT ST I OT ST I OT ST I OT ST I OT Used Mile Mile Exps lmb
$ ExsS
150200081ND/United IND- 224 1007 4.00 Compaction 111th Runzhel W-24. W-24.00
Consulting 02 and Penn 53 stone mer 00
Engineers&Arch. T- I
ch t —
E17 —1 1
Start 13:00 6:45 6:30 10:00 6:30 815
Stop 15:00 19:15 18:30 18:30 18:30 16:45
Lunch .5
Total Time 2.00 0.00 2.5 0.00 12.0 0.00 8.50 0.00 12.0 0.00 8.00 0.00 0.000.00
Weekly Time Total(Office Use Only)
Hourly: Total:55.00 ST:55.00 OT:0.00 Jury:0.00 Brvment:0.00 Total Relmb Miles Total Billable Miles
Salary:Y Vacation:0.00 Holiday:0.00 Slck:0.00 FMLA:0.00 Military:0.00 900.00 900.00
Odometer Readings for Vehicle(Company,Runzhemier&Personal)used for Offical and Personal purpose Department Head's Approval:
P7!
t Date Vehicle ODOM Start ODOM Stop ODOM Miles Personal Miles Branch-Dept Approval Status Approved By
IND-02 Approved KAR-A
Total Miles
Lunch Time Notes: Lunch Notes are not entered
Printed On:08/03/2015 Page 2 of 2
1 .
Prescribed by Stale Board of Accounts City Form No.201(Rev.1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service,where performed, dates service rendered, by whom,
rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
United Consulting Purchase Order No.
1625 North Post Road Terms
Indianapolis, IN 46219 Date Due
Invoice Invoice Description
Date Number (or note attached invoice(s)or bill(s) Amount
9/8/2015 13319-14 111th and Pennsylvania $ 5,238.42
Total $ 5,238.42
1 hereby certify that the attached invoice(s), or bill(s), is(are)true and correct and I have audited same in accordance
with IC 5-11-10-1.6.
,20
Clerk-Treasurer
VOUCHER NO WARRANT NO.
United Consulting ALLOWED 20
1625 North Post Road IN SUM OF$_
Indianapolis, IN 46219
$ 5,238.42
ON ACCOUNT OF APPROPRIATION FOR
Board Members
Po#or INVOICE NO. ACCT#/TITLE AMOUNT
DEPT# I hereby certify that the attached invoice(s), or
25302 13319-14 900-R4462864 $ 5,238.42 bill(s) is(are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
10/19/2015
Signature
City Engineer
Cost Distribution ledger classification if Title
claim paid motor vehicle highway fund