HomeMy WebLinkAboutMechanical Binder.pdf Mechanical General Notes
1.Installations shall conform to all federal, state, and local laws, ordinances, codes and
governing jurisdictions.
2.Drawings are schematic in nature and show general areas for piping and ductwork routing.
Coordinate piping and ductwork with all other trades prior to fabrication. Ductwork
elevations shall be indicated on sheet metal shop drawings after coordination between trades
and prior to fabrication.
3.These drawings are intended to document the general requirements of / for the mechanical
systems. They may not be complete in every respect. The M.C. is required to provide all
necessary labor, equipment, materials, and accessories, etc. for a complete and operational
installation, whether or not indicated on these documents.
4.Submittals for all equipment, materials, or products must be provided by M.C. and approved
prior to installation.
5.Flexible duct shall be limited to lengths shown on plans.
6.Flexible ducts shall be routed and supported in a fashion to avoid pinching or crushing of the
pipe.
7.All non-insulated flexible duct connections to hard duct and diffusers shall be strapped (zip
tied) at the flexible inner liner of the duct.
8.Insulated flexible duct connections to hard duct and diffusers shall be strapped (zip tied) by
the flexible inner liner of the duct. Once secure, the insulation and outer vapor barrier shall be
pulled over the inner liner connection and then strapped to the hard duct. Care shall be taken
to verify that no hard duct is exposed at the connection.
9.%HGURRPGRRUVVKDOOEHXQGHUFXW´WRSURYLGHUHOLHIIRUUHWXUQDLUEDFNWRXQLW
10.Coordinate all openings in roof, floors, or walls with general contractor and structural
contractor prior to commencing work.
11.Coordinate all penetrations of building exterior (dryer vents, bath vents to exterior wall, bath
vents to eves) with G. C.
12.Any conflict or discrepancy between drawings and specifications shall result in the most
stringent applications and should be bid as such. Contract documents consist of both project
manual and drawings and both are meant to be complimentary. Anything appearing on either
must be executed the same as if shown on both in the interest of providing a fully functioning
and operable system(s).
13.Equipment and manufacturers scheduled and / or specified are intended to show a minimum
VWDQGDUGRITXDOLW\DQGDUHEDVHGRQWKHRZQHU¶VSUHIHUHQFH2WKHUQRQVSHFLILHG
non-scheduled manufacturers will not be considered. If the contractor submits equipment
other than by the manufacturer shown on the drawings and in the specifications, it may be
rejected, or subject to review by the architect, engineer, or owner.
14.Any changes or modifications made to this project that deviate from the plans as shown, other
than changes made in coordination with other trades or as a result of unforeseen structural
obstructions, must be approved in writing by the engineer of record.
15.Clearances indicated are based upon best available architectural / structural information.
Contractor shall verify piping, ductwork, sprinkler lines, and electrical routing prior to
submitting a bid / proposal and include any associated costs as required to install work as
shown and intended to provide a complete and functional system.
16.Coordinate the installation of all piping, duct and associated items with items requiring
structural support above the ceiling (i.e. projectors, movable partitions, can lights etc.)
17.Route condensate piping to nearest discharge point, by gravity. The use of pumps to
eliminate condensate should be avoided wherever possible.
18.Route / locate condensate drain piping so it will not be a trip hazard.
19.Insulate all condensate drain piping, inside the building that is located in a place where
conditions may exist to cause condensation.
20.Not all valves and accessories necessary to make this a complete and functioning project may
be shown on the plans. It is incumbent on all subcontractors to provide all elements and
components necessary to make this a complete and fully functional project.
21.Install all HVAC units level.
22.Ground mounted outdoor equipment shall be placed on a concrete or polypropylene pad.
23.)ROORZDOOPDQXIDFWXUHUV¶UHFRPPHQGDWLRQVZLWKUHJDUGVWRRXWGRRUHTXLSPHQWVSDFLQJDQG
clearance for proper air flow and serviceability.
24.Coordinate installation of outdoor units with site engineer, electrician, landscape contractor,
and sidewalk contractor.
25.2XWVLGHDLULQWDNHVVKDOOEHORFDWHGDPLQLPXPRI¶DZD\IURPDQ\H[KDXVWGXFWEORZHU
discharge, plumbing vent, or source of noxious or hazardous fumes.
26.Provide tagging system that identifies equipment and area served as required.
27.Fire stop pipe penetrations of rated walls or structure as required by local code.
28.Paint interior surfaces visible through return air grills. Use flat black paint,
29.7KHUPRVWDWVRUVHQVRUFRQWUROVDUHWREH´$))DQGORFDWHGWRFRPSO\ZLWK$'$
accessibility requirements.
All disconnect switches serving mechanical equipment shall be installed by E. C., following
30.All disconnect switches serving mechanical equipment shall be installed by E. C., following
NEC standards. Proper service clearances shall be maintained.
31.Equipment and installation techniques and methods to be Indiana Energy Code compliant to
include the following ASHRAE 90.1, 62.1 requirements.
a.HVAC equipment must be compliant with Tables 6.8.1A, and 6.8.1B.
b.Refrigerant lines must be insulated with minimum ò´ thick cellular foam insulation in
accordance with Table 6.8.3.
c.Insulation exposed to weather must be suitable for outdoor service (e.g. protected by
aluminum, sheet metal, painted canvas, or plastic cover) and must be water retardant
and provide shielding from solar radiation, U.V. protected.
d.All HVAC systems with field installed ductwork must be air balanced in accordance
with industry accepted procedures.
e.HVAC controls must be set to prevent simultaneous heating and cooling of the same
space.
f.Any exhaust fan that does not have continuous service must be equipped with
motorized or gravity damper that will automatically close when fan is not running.
g.Transverse joints on all ductwork must be sealed with a UL181 approved mastic or
sealing system.
h.Ductwork and plenums must be insulated in accordance with Tables 6.8.2A & 6.8.2B.
32.Provide fire dampers, radiation dampers, or smoke dampers as required by code and as noted.
33.Fire dampers to be constructed of heavy gauge galvanized steel frames, 301 stainless steel
FORVXUHVSULQJVIRUKRUL]RQWDOPRXQWRQO\)IXVLEOHOLQNDQGJDOYDQL]HGVWHHOVOHHYH
that is two gauges thicker than service ductwork.
34.Fire dampers to be UL listed and labeled and must be manufactured in conformance with
NFPA Standard 90A.
35.The smallest, economically feasible, A/C equipment provides a nominal cooling capacity of
18,000 Btuh. In some cases, this may exceed the load requirement of the space,
compromising the dehumidification performance of the system. Alternative means may have
to be provided by owner / renter to control humidity under certain conditions.
MECHANICAL SHEET INDEX
M001 SHEET INDEX & GENERAL NOTES
M002 EQUIPMENT SCHEDULE
M100 HVAC LAYOUT - BUILDING TYPE 1 - FIRST FLOOR PLAN
M101 HVAC LAYOUT - BUILDING TYPE 1 - SECOND FLOOR PLAN
M102 HVAC LAYOUT - BUILDING TYPE 1A - FIRST FLOOR PLAN
M103 HVAC LAYOUT - BUILDING TYPE 1A - SECOND FLOOR PLAN
M104 HVAC LAYOUT - BUILDING TYPE 1A - THIRD FLOOR PLAN
M105 HVAC LAYOUT - BUILDING TYPE 3 - FIRST FLOOR PLAN
M106 HVAC LAYOUT - BUILDING TYPE 3 - SECOND FLOOR PLAN
M107 HVAC LAYOUT - BUILDING TYPE 3 - THIRD FLOOR PLAN
M108 HVAC LAYOUT - BUILDING TYPE 4 - FIRST FLOOR PLAN
M109 HVAC LAYOUT - BUILDING TYPE 4 - SECOND FLOOR PLAN
M110 HVAC LAYOUT - BUILDING TYPE 4 - THIRD FLOOR PLAN
M111 HVAC LAYOUT - BUILDING TYPE 5 - FIRST FLOOR PLAN
M112 HVAC LAYOUT - BUILDING TYPE 5 - SECOND FLOOR PLAN
M113 HVAC LAYOUT - BUILDING TYPE 5 - THIRD FLOOR PLAN
M114 HVAC LAYOUT - BUILDING TYPE 6 - FIRST FLOOR PLAN (LEFT HAND SIDE)
M115 HVAC LAYOUT - BUILDING TYPE 6 - FIRST FLOOR PLAN (RIGHT HAND SIDE)
M116 HVAC LAYOUT - BUILDING TYPE 6 - SECOND FLOOR PLAN (LEFT HAND SIDE)
M117 HVAC LAYOUT - BUILDING TYPE 6 - SECOND FLOOR PLAN (RIGHT HAND SIDE)
M118 HVAC LAYOUT - BUILDING TYPE 6 - THIRD FLOOR PLAN (LEFT HAND SIDE)
M119 HVAC LAYOUT - BUILDING TYPE 6 - THIRD FLOOR PLAN (RIGHT HAND SIDE)
M120 HVAC LAYOUT - BUILDING TYPE 7 - FIRST & SECOND FLOOR PLAN
M121 HVAC LAYOUT - COACH BUILDING - FIRST FLOOR PLAN PLAN
M122 HVAC LAYOUT - COACH BUILDING - SECOND FLOOR PLAN
M122 HVAC LAYOUT - COACH BUILDING - THIRD FLOOR PLAN
M123 HVAC LAYOUT - CLUBHOUSE - FIRST FLOOR PLAN
M124 HVAC LAYOUT - CLUBHOUSE - SECOND FLOOR PLAN
M200 HVAC DETAILS
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
164
164
164
1
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
164
164
164
164
12
1 1
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
164
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
164
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
5
12 2
5
12
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
12
2
8
164
164
16
4
164
2
16
4
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
8
164
164
164 16 4
164
8
164
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
8
5
12 2
5
12
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
164
164
164
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
164
164
164
164
2 2
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
12
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
5
12 2
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
8
5
122
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
164
164
164
2
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
16 4
16 4
16 4
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
2
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
8
8
2
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
2
4 16
2
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
Mechanical Plan Notes:
1 See Sheet M200 for details.
2 See Sheet M200
1 for mechanical room detail.
3 Provided and installed by electrician.
4 Dryer vent to be sized in accordance with dryer
PDQXIDFWXUHU¶VUHFRPPHQGDWLRQ7KHODVWWKUHH
feet of the dryer vent piping, connected to the dryer
termination at the outside wall, shall be sloped at a
PLQLPXPó´SHUIRRWWRZDUGVWKHRXWVLGHRIWKH
building.
5 Verify dropped ceiling with architect and G.C. and
verify that all materials in dropped (plenum) ceiling
are plenum rated. No dropped ceiling in mechanical
room.
6 Not Used
7 Line sets for upper floors will run exposed in the
back of each mechanical room in a straight and neat
manner. Installation must coordinate with other
trades.
8 Fire dampers required where HVAC ductwork and /
or registers penetrate fire rated barrier.
9 Windows sized and configured to meet fresh air
requirement dictated by ASHRAE 90.1 / 62.1.
10 Trash exhaust fan to be constantly ON. Power
disconnect at fan by electrician.
11 Verify that de-rated equipment performance is
considered due to line set length dictated by A/C
location.
12 Verify penetration from dropped ceiling R/A
plenum to mechanical room.
13 Diffuser to be placed in face of 2nd floor structure
with throw aimed at far wall. Diffuser to be high
flow, directional type diffuser.
14 1st floor return air to be pulled to 2nd floor
mechanical room through wall stack installed in a
manner that accommodates future installation of a
return air booster fan. Ensure all framing is left
open to accommodate air flow.
15 1st floor dryers vented in ceiling above unit. 2nd &
3rd floor dryers vented in floor below unit.
16 See building plans for specific dryer vent (DV)
locations.
17 Condensing units placed on polypropylene pads.
18 Chase sized to accommodate 70% of the required
return air volume for the entire system.
19 Verify that structural framing in this area
accommodates duct and piping requirements as
shown.
20 LQVXODWHGIOH[GXFWWRUHGXFHUDWERRW
17
17
4
20 20
20
20
20
20 20 20
17
17
17
ar
c
h
i
t
e
c
t
s
a
n
d
l
a
n
d
p
l
a
n
n
e
r
s
62
0
1
c
a
r
r
o
l
l
t
o
n
a
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
i
n
4
6
2
2
0
ph
o
n
e
3
1
7
2
0
2
0
6
6
1
fa
x
3
1
7
2
0
2
0
6
6
2
em
a
i
l
o
f
f
i
c
e
@
w
e
a
v
e
r
s
h
e
r
m
a
n
.
c
o
m
we
a
v
e
r
s
h
e
r
m
a
n
d
e
s
i
g
n
SET 12/16/13
MO
O
R
E
E
N
G
I
N
E
E
R
I
N
G
SE
R
V
I
C
E
S
,
I
N
C
.
63
4
0
L
a
P
a
s
T
r
a
i
l
In
d
i
a
n
a
p
o
l
i
s
,
I
N
4
6
2
6
8
Ph
o
n
e
(
3
1
7
)
2
9
1
-
1
0
5
2
FA
X
(
3
1
7
)
2
9
8
-
2
7
2
9
MO
O
R
E
EN
G
I
N
E
E
R
I
N
G
MOORE ENGINEERING
SERVICES, INC.
6340 LaPas Trail
Indianapolis, IN 46268
Phone (317) 291-1052
FAX (317) 298-2729MOORE
ENGINEERING
architects and land planners
6201 carrollton avenue
Indianapolis, in 46220
phone 317 202 0661
fax 317 202 0662
email office@weaversherman.com
weaver sherman design
S
E
T
1
2
/
1
6
/
1
3