Loading...
HomeMy WebLinkAbout13110024.170 0 � ;: ----�--- , EXISTING HB-1 TO REMAIN WH-1-�' OVE � EXISTING GAS METER ROUTE GAS� THRU WALL 12" AFF N WATER PLUMBING PLAN SCALE: 1 /4" = 1'-0" DCISTING COLD WATER SUPOPLY 4 B UP . ---------------------� - --------- -- N SANITARY PLUMBING PLAN SCALE: 1 /4" = 1'-0" EXISTING -S SANITARY SEWER O GENERAL NOTES 1. ALL IN-FLOOR PLUMBING FIXTURES TO BE MOUNTED SO TOP IS FLUSH WITH FINISHED FLOOR. 2. CONTRACTOR TO COORDINATE / VERIFY EXACT LOCATIONS FOR ALL FLOOR DRAINS/FLOOR SINKS PRIOR TO INSTALLATION. 3. COORDINATE WATER LINES WITH ELECTRICAL CONTRACTOR PIPING SHALL NOT BE ROUTED OVER ELECTRICAL PANEL OR EQUIPMENT. 4. ALL BACKFLOW PREVENTERS SHOULD BE INSTALLED ABOVE THE KITCHEN OR RESTROOM DROP CEILING WHENEVER POSSIBLE OR COMPLETELY OUT OF CUSTOMER VIEW IN THE BACK OF THE KITCHEN. BFP SHOULD NOT INTERFERE IN ANY WAY WITH THE OPERATION OF THE KITCHEN. IF AN EXISTING BACKFLOW PREVENTER IS IN A LOCATION OTHER THAN WHAT IS SHOWN ON THESE DRAWINGS, CONTACT THE JIMMY JOHN'S CONSTRUCTION DEPARTMENT IMMEDIATELY FOR DIRECTION ON HOW TO PROCEED. 5. ALL PLUMBING/GAS LINES MUST BE RECESSED WITHIN WALL CAVITIES UNLESS SPECIFICALLY NOTED OTHERWISE IN THE BLUEPRINTS. O K�YED NOTES 1. FREEZER/REFRIGERATOR EQUIPMENT IS FURNISHED WITH DEFROST VAPORIZER. NO CONDENSATE LINES FROM EVAPORATORS ARE REQUIRE 2. TOP OF FLOOR DRAINS, FLOOR SINKS AND CLEANOUTS TO BE FLUSH WIT TOP OF FLOOR TILE. 3. CONNECT TO EXISTING SANITARY. CONTRACTOR TO FIELD VERIFY EXACT LOCATION, SIZE, FLOW DIRECTION AND INVERT ELEVATION OF EXISTING SANITARY AND DETERMINE SUITABLE TIE-IN POINT PRIOR TO EXCAVATING FOR NEW WASTE PIPING. 4. EXISTING COLD WATER SUPPLY. CONTRACTOR TO FIELD VERIFY EXACT LOCATION AND SIZE OF EXISTING SERVICE. 5. (3 EACH)1�" I.W. (PLUMBING CONTRACTOR TO MANIFOLD) ON 3CS - PLUMBING CONTRACTOR TO RUN TO FS-1. 6. 2" VENT UP TO 3" VENT THRU ROOF. VERIFY MIN. 10'-0" CLEARANCE FROM ANY OUTDOOR AIR INTAKE. COORDINATE NEW ROOF PENETRATIONS WITH LANDLORD'S CONTRACTOR. 7. CONTRACTOR TO INSTALL TRAP PRIMER (TP-1) ON ALL NEW FLOOR DRAINS. 8. FURNISH AND INSTALL 6" SCHEDULE 40 PVC PIPE BELOW SLAB WITH LONG SWEEPING ELBOWS FOR SODA SYRUP LINES. TERMINATE 3" AFF AND INSTALL PULL STRING. 9. CONNECT 1" CW TO WG1. STUB-OUT HEIGHT AT 26-1/2" AFF. SEE FIXTURE CONNECTION SCHEDULE. 10. CONNECT 1" H8�CW TO WH-1. REFER TO DETAIL ON SHEET P-2. 11. ROUTE WH-1 T8�P RELIEF LINE DOWN IN WALL, WITH NO TRAP TO MS. TERMINATE WITH MINIMUM 2 DIAMETER AIR GAP ABOVE MOP SINK FLOOD RIM. 12. 1/2" DOWN AND THRU WALL TO WATER FILTERS AT 8'-0" AFF WITH SHUT-OFF VALVES ON BOTH SIDES OF FILTERS. FILTER SYSTEM PROVIDE BY KITCHEN EQUIPMENT SUPPLIER. RUN CW SUPPLY WITHIN WALL AND STUB OUT DIRECTLY BEHIND ICE MACHINE TO SHUT-OFF VALVE AT 67" AFF AND RUN �" FILTERED METAL BRAIDED HOSE FROM SHUT-OFF VALVE TO ICE MACHINE SUPPLY INLET. 13. FURNISH AND INSTALL BACKFLOW PREVENTER SIMILAR TO WATTS NO. 9B ABOVE CEILING. 14. �" CW DOWN AND THRU WALL TO ICE MAKER COMPRESSOR AT 67" AFF. RUN CW SUPPLY WITHIN WALL AND STUB OUT DIRECTLY BEHIND ICE MACHINE TO SHUT-0FF VALVE AND RUN �" METAL BRAIDED HOSE FROM SHUT-OFF VALVE TO ICE MACHINE COMPRESSOR . 15. PIPING AND CONNECTIONS TO EQUIPMENT AND SYRUP LINES SHALL BE FURNISHED AND INSTALLED BY OTHERS. 16. EXTEND RELIEF DRAIN FROM BFP TO FLOOR DRAIN OR MOP SINK. 17. CONNECT �" H�CW TO TEMPERING VALVE (N� BELOW SINK, AND CONNEC �" TW 8� �" CW TO LAV-1. 18. �" H&CW DOWN TO MOP SINK. 19. �" HB�CW DOWN. CONNECT �" HBCW TO TEMPERING VALVE (� BELOW SINK AND CONNECT �" TW AND �" CW TO HAND SINK. 20. PLUMBING CONTRACTOR 70 VERIFY SIZE AND LOCATION OF EXISTING CW SUPPLY. PROVIDE SHUT-OFF VALVE IN TENANT SPACE IF NOT ALREADY EXISTING. COORDINATE WITH LANDLORD TO DETERMINE WATER METERING REQUIREMENTS AND WATER SIZING UPGRADE IF NECESSARY. PROVIDE APPROVED BACKFLOW PREVENTER ABOVE CEILING IN ACCESSIBLE LOCATION PER LOCAL REQUfREMENTS. 21. �" H&CW DOWN TO 3-COMPARTMENT SINK . 22. FLOOR DRAIN REQUtRES BOLTED CONE . 23. EXTEND 1/2" CW DOWN IN WALL TO BEVERAGE COUNTER. 24. INSTALL THE GREASE INTERCEPTOR IN GROUND WITH TOP COVER FLUSH WITH FINISHED FLOOR. ROUTE KITCHEN FS-1 SERVING 3CS, FD-1, 1CS AN MS THROUGH GREASE INTERCEPTOR. PLUMBING CONTRACTOR TO INSTALL ONE (1) EXTENSION KIT AND FIELD VERIFY IF ADDITIONAL EXTENSIONS KIT ARE NECESSARY FOR INSTALLATION. 25. 1�" VENT FROM GREASE INTERCEPTOR DISCHARGE LINE. SEE RISER DIAGRAM SHEET P-3 26. STUB �" CW INSIDE CABINET. PROVIDE CW SUPPLY TO SOFT DRINK DISPENSER WITH SHUT-0FF VALVE AND BACKFLOW PREVENTER SIMILAR TO WATTS NO. 96D INSIDE CABINET. 27. ROUTE ICE MAKER AND ICE BIN DRAIN LINES DOWN IN WALL, WITH NO TRAP TO FS. TERMINATE WITH MINIMUM 2 DIAMETER AIR GAP ABOVE FLOOR SINK FLOOD RIM. 28. 1/2" H8�CW DOWN TO 1-COMPARTMENT SINK. 29. PLUMBING CONTRACTOR TO VERIFY GAS SERVICE LINE AND LOCATION. GAS PIPE SIZE IS BASED ON 2006 INTERNATIONAL FUEL GAS CODE TABLE 402.4(2) SCHEDULE 40 METALLIC PIPE, LESS THAN 2 PSI SYSTEM PRESSURE, 0.5" W.C. PRESSURE DROP, 90 FEET TOTAL DEVELOPED PIPE LENGTH, 230 MBH TOTAL CONNECTED LOAD. 30. PROVIDE GAS COCK, DIRT LEG ASSEMBLY, UNION AND GAS PRESSURE REGULATOR (IF REQUIRED). 31. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE NEW GAS PIPING AND NEW GAS METER WITN LOCAL UTILITY. PROVIDE GAS LINE TO RTU-1(NEW), RTU-2(NEW) . CONTRACTOR SHALL INCLUDE ALL FEES ASSOCIATED WITH NEW GAS PIPING. 32. 1�" I.W. ON 1CS - PLUMBING CONTRACTOR TO RUN TO FS-1. 33. STUB �" CW INSIDE CABINE7. PROVIDE SEPARATE CW SUPPLY BRANCHES TO SOFT DRINK DISPENSER AND TEA BREWER WITH SEPARATE SHUT-OFF 1 VALVES AND BACKFLOW PREVENTERS SIMILAR TO WATTS NO. 9BD INSIDE CABINET. 34. EXTEND �" CW DOWN IN WALL TO BELOW SLAB. CW SUPPLY TO RUN BELOW SLAB TO DRINK DI3pENSER AND TEA BREWER AS SHOWN. PIPING UNDER SLAB TO BE TYPE K SEAMLESS COPPER . NOTE: CONTRACTOR TO CONFIRM TYPE OF WALK-IN COMPRESSOR CONFIGURATION WITH EQUIPMENT SUPPLIER AND FRANCHISEE. OPTIONS ARE REMOTE AND DIRECT MOUNTED. REFERENCE SHEET MEP-3 FOR ALTERNATE COMPRESSOR INSTALLATION. L- I13-892-491 , 1��MY 1°�'�'s Sr�e J4y3 � °�MEI'�SARDM Cg�' 1 .� :�;�; ,_.�;•'.` ' � �( ��;,, r•. � . '%.. .,��'� :y t••� f j tk �} .�/i' '`�:;���.`-�-A,t`:••'��`� .: µ �; :' ���,'�. . �w„'/�, ';���� : r � `^..�, �,'� E ;�;y', .: ��F �' � •-,. ,...,,.-�s, h�:. %, � f;'..�.,.�,�s�t.� �� 1 � �e N � N O C a � Y m � + m� __ �. •> �o �, � b �' J j( ' a a �N. oA m� �� o �� < > N � � O � �. Q '� o N N � � N � � � � � � 0 1 V1 p� W � p� W � z � T^ } ` � Gti z v, �' 1 �� pa�, A � � � o A � `� � � � W�� �o ��,� �� M �� �z� � �ao � ^��p�E" ��� w � oU� �� � H �z o a ti � � F � � � � � � E V � DATE: $�r$ DATE REVISED 1 SHEET TITLE FLOOR PLAN, scHmu�s AND DEfAILS - PLUM8ING 1 SHEET NUMBER P-1 �