Loading...
HomeMy WebLinkAbout0599.87 Application�� ied) within artment of BU�LDTNG PEY2Iy=T 2NFORMAT20N Carm�1-CZa�y Towraship Dapartmerit of Corivnciri3ty Developmar�t CARMEL 20NING ORDINANCE 2-].b0, SfiCTION 29.4.2(3): THE BUILDING COP'II�fIS- SIONER (DIRECTOR, DEPT. OF COMMUNITY DEVELOPMENT OR STAFF) SHALG APPROVE OR DENY THE IMPROVEMENT LOCATION PERMIT (BUILDING PERMIT) WITHIN FIVE (5) WORKING DAYS OF THE RECEIPT OF TfiE WRITTEN APPLICATION FORM AND ACCOMPANYING MATERIALS. THfi IMPROVEMENT LOCATION PERh1IT (HUILDING PERMIT) SHALL BE ISSU£D WHEN THE PROPOSED STRUGTURE, IMPROVEMENT OR USE ' AND ITS LOCATION CONFORM IN ALL RESPECTS TO THIS ORDINANCE. 1. A completed Improvement Location Permit (Duilding Permit) apglication. � 2. Two (2) complete sets of construction plans. In comFliance with the State �nerqy Code, must list R-values on �aalls, ceilings, ete. If a commercial cons�ruction, plans must be stamr�d approved by the Indiana State Denartment of Fire Prevention & 8uildina SaEetv Indicate total height of build- ing on plans. 3. A copy of sewer permit (from City of Carmel Engineering Dept. or Hamilton Western Utilities, whichever applies), or septic permit (fiamilton County Health Department). d. One (1) copy of plat plan from subdivisian development plan 5. Thiee (3) copfes of a sike plan or plot plan showing the following RE4UIRED information (can be obtained from the landowner or developer): --idot drawn to scale -- all dimensions --Scale end n�rth arrot+ --All roads, alleys, rights-of-way, etc. --All other utillties and drainage rights-�f-way and easements --Any applicable flood plain area --Buildinq pad Qlevation and lot corner elevations --All xcc.ssory buil�ings -- existing or proposed --All sidewalks and driveways --Sewer and water lfnes, septfc system and well location --Drainaqe flow arrows --All drafnage swales and subsurface facilities (retention/ detention areas, etc.) --Dimensional cross sections of all drainage swales "S�P P�+'�P isump pump pits) showing discharge locati�ns -�Geothermal heat pump discharge locations Drainaae Swales: All required drainage swales must be shown on the plat plan and constructed in all subdivisions prior to the Depart�ent of Coc�aunity Development performing a final inspec- tion of any structure per plans on file or per the following: Constructed swales shall be a minimum of 1'6" deep with side slopes of not less than 4 to 1. If this information is not submitted, it will extend the time it t�kes to get an approved building germit. I CERTIFY THAT ALL OF T'HE ABflVE LISTED INFORMATION IS SHOWN COMPLETELY AND ACCIiRATELY ON THE ACHED PLOT OR SITe PLAN AS SUBMITTED WITH A BUILDIDIG PERMIT �P�LI TLdti TO THE CARMEL-CLAY DEPARTMENT OF COMMUNITY DEVELOPMENT. / /� SIGNATURE: ADDRESS: I ��� �+ NAME OF PLUMBING CONSTRACTOR (If applicable): VALID STATE FLUf+�iNG LICETISE NUMBER: / �C C� E ��11)