Loading...
HomeMy WebLinkAboutPath/Barricade email correspondence Motz, Lisa From:Conn, Angelina V Sent:Friday, December 04, 2015 12:38 PM To:Motz, Lisa Subject:FW: Path behind Building #2 (River Rd. Shops) Attachments:IMG_0405.jpg; IMG_0404.jpg Lisa – Please add this path/barricade email correspondence to laser fiche, to Docket No. 14050011 ADLS Amend: River Road Shops at Legacy, Buildings 2 & 3. Thank you! Angie Conn, AICP | Planning Administrator From: Conn, Angelina V Sent: Friday, December 04, 2015 11:16 AM To: 'Greg Ilko'; Mishler, Nicholas F Cc: 'Adam Gilliatte'; 'Jeff Lewis'; Lux, Pamela K; Littlejohn, David W; Blanchard, Jim E Subject: RE: Path behind Building #2 (River Rd. Shops) Good morning, Greg – Thank you for the explanation as to what has changed on the site. This all makes sense. The onsite path as installed now meets what the Plan Commission required to be installed by the petitioner. We are okay with your client getting their final permits and inspections through the Building Permits Dept. Have a nice weekend, Angie Conn, AICP | Planning Administrator City of Carmel Planning & Zoning Dept. 1 Civic Square, 3rd Flr., Carmel, IN 46032 O: 317-571-2417 | F: 317-571-2426 | W: www.carmeldocs.com From: Greg Ilko \[mailto:gilko@crossroadengineers.com\] Sent: Thursday, December 03, 2015 5:26 PM To: Conn, Angelina V; Mishler, Nicholas F Cc: 'Adam Gilliatte'; 'Jeff Lewis' Subject: RE: Path behind Building #2 Angie, During the Building 1 approvals, it was proposed to add bollards at the west end of the path due to the grade change from the path to the ground. The path originally ended at the top of the wall, which extended due south about the western property line. During the building 2 & 3 design approvals, it was decided to get the path down to grade as best possible by breaking the retaining wall 90 degrees and modify the grade of the path. We removed the bollard details but added the temporary barricade, as grade issues were still a concern. However, as you can see in the photos, the path simply empties into the common area at grade and doesn’t require a safety barricade. I hope this makes sense, but please call my mobile if you have questions. Thanks! 1 G Gregory J. Ilko, P.E. CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 Office: 317-780-1555 ext. 112 Mobile: 317-408-3609 Fax: 317-780-6525 www.crossroadengineers.com From: Jeff Lewis \[mailto:jlewis@gilliatte.com\] Sent: Thursday, December 03, 2015 4:57 PM To: Greg Ilko Cc: Adam Gilliatte Subject: Fwd: Path behind Building #2 Greg Please see email below from Angie from Carmel. Can you write a justification as to why the barrier is not needed and get it to Angie? Please call me at 910-1435 to discuss. ASAP if possible. Sent from my iPhone 2