Loading...
HomeMy WebLinkAboutC200 - Site Plan-C200 - Site Plan.pdfDA T E MA R K RE V I S I O N S BY CE R T I F I E D : S & A JOB NO. SHEET NO. DRAWN BY:CHECKED BY: 6 7  2  (  3  3  (  /  :  (  5  7  + $ /  :  $  <  6   2  1     ( D V W     W K  6 W U H H W    ) L V K H U V   , 1             SK R Q H                  I D [               SI T E P L A N C200 A B C D E F G H J K L M 6" COMBINED CURB AND WALK ACCESSIBLE RAMP LAWN AREA (SEE LANDSCAPE PLAN) 4" WIDE WHITE STRIPING 6" STRAIGHT CURB CONCRETE BOLLARD 4" WIDE BLUE STRIPING DUMPSTER ENCLOSURE HANDICAP SIGN DECORATIVE ENTRY (SEE ARCH. PLANS) HANDICAP PARKING 1' CONCRETE MEDIAN (SEE ARCH. PLANS) KEYNOTES BUILDING LINE DRAINAGE EASEMENT RADIUS PROPOSED CONCRETE B.L. D.E. R= EXISTING SANITARY SEWER EXISTING STORM SEWER PROPOSED SANITARY LATERAL PROPOSED STORM SEWER PROPOSED WATER LATERAL S LEGEND 020 2010 NOTES ALL CONCRETE CURB RADII ARE 5' TO FACE OF CURB UNLESS NOTED OTHERWISE. ALL RADII AND PAVEMENT DIMENSIONS ARE MEASURED TO THE EDGE OF PAVEMENT OR FACE OF CURB (WHERE APPLICABLE) SEE ARCHITECTURAL PLANS FOR BUILDING DIMENSIONS ALL DIMENSIONS TO THE BUILDING ARE TO THE BUILDING FACE AT GRADE. CONTRACTOR SHALL COORDINATE WITH THE BUILDING CONTRACTOR ON PLACING THE FINAL ASPHALT WEARING SURFACE ON ALL PAVED AREAS. TIMING SHALL BE COORDINATED TO MINIMIZE CONSTRUCTION-TYPE TRAFFIC ON THE FINAL WEARING SURFACE. ALL SOFT SPOTS IN PAVEMENT AND SUBGRADE TO BE REPAIRED PRIOR TO PLACEMENT OF FINAL ASPHALT SURFACE. 1. 2. 3. 4. 5. HYATT PLACE ITEM PROVIDED PER THE SUBMITTED SITE DEVELOPMENT PLAN PARKING SPACES REQUIRED/MOBILITY IMPAIRED ACCESSIBLE SPACES 87 SPACES TOTAL (4 H.C. SPACES) CONCRETE PARKING BUMPER CONCRETE SIDEWALK SEE SHEET C803 FOR PAVEMENT SPECS MONUMENT SIGN RETAINING WALL FIRE DEPT. CONNECTION N O P Q R S 72978 HY A T T P L A C E JSM BAH CL A Y T O W N S H I P HA M I L T O N C O U N T Y , I N D I A N A 11 / 2 0 / 1 5 Fi l e N a m e : S: \ 7 2 9 7 8 \ D W G \ C 2 0 0 - S i t e P l a n . d w g - C2 0 0 - S i t e P l a n Mo d i f i e d / B y : No v e m b e r 2 0 , 2 0 1 5 8 : 4 5 : 4 8 A M / km i t c h e l l Pl o t t e d / B y : No v e m b e r 2 0 , 2 0 1 5 1 0 : 5 9 : 4 7 A M / Ke n n y M i t c h e l l AP P R O V A L P E N D I N G / N O T F O R C O N S T R U C T I O N CONSTRUCTION LIMITS