Loading...
HomeMy WebLinkAboutC201 - Grading Plan-C201 - Grading Plan.pdfDA T E MA R K RE V I S I O N S BY CE R T I F I E D : S & A JOB NO. SHEET NO. DRAWN BY:CHECKED BY: 6 7  2  (  3  3  (  /  :  (  5  7  + $ /  :  $  <  6   2  1     ( D V W     W K  6 W U H H W    ) L V K H U V   , 1             SK R Q H                  I D [               GR A D I N G P L A N C201 020 2010 72978 HY A T T P L A C E JSM BAH CL A Y T O W N S H I P HA M I L T O N C O U N T Y , I N D I A N A 11 / 2 0 / 1 5 Fi l e N a m e : S: \ 7 2 9 7 8 \ D W G \ C 2 0 1 - G r a d i n g P l a n . d w g - C2 0 1 - G r a d i n g P l a n Mo d i f i e d / B y : No v e m b e r 2 0 , 2 0 1 5 9 : 0 6 : 2 8 A M / km i t c h e l l Pl o t t e d / B y : No v e m b e r 2 0 , 2 0 1 5 1 1 : 0 1 : 0 6 A M / Ke n n y M i t c h e l l AP P R O V A L P E N D I N G / N O T F O R C O N S T R U C T I O N 870 848.0 EXISTING CONTOUR EXISTING SANITARY SEWER EXISTING STORM SEWER PROPOSED GRADE PROPOSED CONTOUR PROPOSED SANITARY SEWER PROPOSED STORM SEWER 870 S LEGEND BUILDING LINE STORM SEWER EASEMENT RADIUS PROPOSED CONCRETE B.L. S.S.E. R= CONTACT: CARMEL UTILITIES (317) 571-2648 FOR WATER LOCATES FOR SANITARY SEWER LOCATES CONTACT: CLAY TOWNSHIP REGIONAL WASTE DISTRICT (317) 844-9200 STORM SEWER FOR THIS PROJECT WILL BE PRIVATE ALL STORM SEWERS WITHIN PUBLIC RIGHT-OF-WAY SHALL BE RCP CLASS III. WITH EXCEPTION OF REAR YARD SSD'S. NOTE: FOR STORM AND PIPE CHARTS SEE THIS SHEET NOTES TO CONTRACTOR: ALL PADS SHOULD BE TESTED TO ASSURE A COMPACTION OF AT LEAST 95 PERCENT OF THE MAXIMUM DRY DENSITY USING THE STANDARD PROCTOR TEST METHOD. ANY PRIVATE TILES LOCATED ON THIS SITE WILL NEED TO BE LOCATED; BREATHERS SET AT THE DOWNSTREAM PROPERTY LINE AND CRUSHED OR REMOVED ACROSS THIS SITE. IF ANY OF THESE TILES EXTEND BEYOND THE LIMITS OF THIS PROJECT, THEY WILL NEED TO BE PROVIDED A POSITIVE OUTLET AND ALLOWED TO CONTINUE TO FUNCTION, AS IT IS ILLEGAL TO BLOCK OFF A PRIVATE "MUTUAL" TILE. CONTRACTOR SHALL VERIFY DEPTHS OF ALL EXISTING ONSITE UTILITIES PRIOR TO CONSTRUCTION TO CONFIRM THERE IS NOT ANY CONFLICTS WITH OTHER UTILITIES, STORM SEWERS OR STREETS. CONFLICTS AFTER CONSTRUCTION BEGINS ARE SOLELY THE CONTRACTOR'S RESPONSIBILITY. CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF WORK TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED CITY R/W. EXISTING PAVEMENT TO BE SAW CUT TO A CLEAN EDGE ADJACENT TO ANY WIDENING, AUXILIARY LANES, ETC. NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. CONSTRUCTION LIMITS FLUSH CURB