Loading...
HomeMy WebLinkAboutYardberry/Eng/CO 4/4620/Shred Use Path 136thTO: CITY OF CARMEL CONTRACT CHANGE ORDER NO.: 4 DATE: 8/5/15 PROJECT NAME: Shared Use Path 136th Street CITY REQ. NO.: CITY PO NO.: CITY PO DATE: 1. You are directed to make the following changes in this Contract: Install Class 1 rip rap for erosion control at the outlet of structure 9. SCHEDULED ADJUSTMENT ITEM AMOUNT (+) OR (-) DAYS 0074 Class 1 Rip Rap $4,620.00 II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: Force Accout Stunmary The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $_691 912.50 Contract Price will be increased/decreased by this Change Order $ 4,620.00 New Contract Price including this Change Order $ 696,532.5 Contract Time Prior to this Change -Order Days 6/10/15 Completion Date Net increased/decreased resulting from this Change Order 19 Days Current Contract Time including this Change Order Days _6/10/15 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended CHA ENGINEER Union Station Address Indianapolis City/State/Zip By: Tom Gentry Phone _317-503-5250 Date: 8-5-15 The Above Changes Are Ac C / G C(TOR EA- Address5/60 )2 City/State/Zip By: 6 • Phone: Date: Approved: urk embe Lori at ATT , Member ✓144-12-1,--> 15iana Cordray, Treasurer Date: / -air FORCE ACCOUNT DAILY FIELD RECORD Contract Id R36889 136th Street Pathway Work Performed By: Yarberry County: Hamilton Day: Date: Prime Contractor Project No: Sub -Contractor Route: CLASS OF WORK CLASS OF WORK REG. HRS Hourly Rate Totals DESCRIPTION OF DUTIES Laborer Laborer 7.00 $65.00 $455.00 Labor Laborer Laborer 7.00 $65.00 $455.00 Labor EQUIPMENT TIME USED Hourly Rate Totals REMARKS Excavator 7 $200.0 $1,400.00 Installed Rip Rap Dump Truck 7 $110.0 $770.00 Transported Rip Rap MATERIALS USED QUANTITY PRICE Totals REMARKS Class 1 Rip Rap 40 $38.50 $1,540.00 Total Force Account Work = Total Cost Per Ton = $4,620.00 b $4,620.00/40 Tons = $115.5 Per Ton