HomeMy WebLinkAbout24738 Taylored Systems (2)Lity of Carmel
ONE CIVIC SQUARE
CARMEL, INDIANA 46032-2584
ORM APPROVED BY STATE BOARD OF ACCOUNTS FOR CITY OF CARMEL • 1997
INDIANA HtTAIL IAA tAtMVI
CERTIFICATE NO. 003120155 002 0
FEDERAL EXCISE TAX EXEMPT
35-60000972
PURCHASE ORDER NUMBER
247313
THIS NUMBER MUST APPEAR ON INVOICES, N
VOUCHER. DELIVERY MEMO, PACKING SUP.
SHIPPING LABELS AND ANY CORRESPONDENCI
RCHASE ORDER DATEI DATE REQUIRED
REQUISITION NO
VENDOR NO. DESCRIPTION
924/2015 1
ENDOR
Taylored Systems
14701 Cumberland Road, Suite 100
Noblesville, IN 46060
SHIP
TO
Carmel Fire Department
2 Cannel Civic Square
Carmel, IN 46032
(317) 571-2622
NFIRMPTION
BLANKET
CONTRACT
PAYMENT TERMS
FREIGHT
QUANTITY
UNIT OF MEASU REh
DESCRIPTION
UNIT PRICE
EXTENSION
NN,_)
Account 43-60t00
1 Each Installation of Equipment - Station 43
Send Invoice To:
Carmel Fire Department
2 Cannel Civic Square
Cannel, IN 46032 -
PLEASE INVOICE IN DUPLICATE
$17,881.49
Sub Total:
$17,881.49
$17,881-40
DEPARTMENT
ACCOUNT
PROJECT
PROJECT ACCOUNT
AMOUNT
Cannel Fire Department
SHIPPING INSTRUCTIONS
• SHIP REPAID.
• C.O D. SHIPMENTS CANNOT BE ACCEPTED
• PURCHASE ORDER NUMBER MUST APPEAR ON ALL
SHIPPING LABELS
• THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99, ACTS 1945
AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO
nn,-,,sAG\IT nn&,Tnnu win
24738
ORDERED BY
TITLE
CLERK -TREASURER
nFFIrF rncv
PAYMENT ¢17 681 49
• A/P VOUCHER CANNOT BE APPROVED FOR PAYMENT UNLESS HE PO
NUMBER IS MADE A PART OF THE VOUCHER AND EVERY INVOICE AND
VOUCHER HAS THE PROPER SWORN AFFIDAVIT ATTACHED.
• 1 HEREBY CERTIFY? AT THERE 15 AN UNOBLIGATED BALANCE IN
THIS APPROPRIAT •N SUFFICIENT TO PAY FOR THE.ABOVE ORDER.
TAYL{1 RED SYSTEMS, INC.
City of Carmel
FS 43 and FS 44 Cabling
TAYLORIID SYSTEMS
STRUCTURED CABLING
PROPOSAL & SCOPE OF WORK
PREPARED 13Y: ALLEN WILSON
(317) 776-4000
awi Isonrci lavlored.com
Prepared for:
Tod Luckoski
t I u c ko s ki e c a rm a 1. i n. gov
DATE: August 13, 2015
INTRODUCTION:
Taylored Systems, Inc. is pleased to present a proposal for a Structured Cabling Solution. Since the
cabling solution that you select to connect your voice and data communications systems becomes the
lifeline of that system, choosing a qualified provider is a critical decision. Taylored Systems installs all of
its projects to TIA/EIA-5688, IEEE & BICSI Standards with Certified Installers to implement it.
Taylored Systems uses only high-end quality products in its solutions, which are backed by the
manufacturer as well as Taylored Systems warranties. Our goal is to provide our customers with a
physical layer infrastructure capable of supporting all applications designed in conjunction with today's
standards. By taking time to listen, study your business and understand your goals, Taylored Systems can
install a complete structured cabling solution with service and support during and after the installation.
Restriction On Disclosure And Use Of Information and Data
This proposal or quotation includes information and data that shall not be disclosed outside the realm of its intended use and shall
not be duplicated, used or disclosed —in whole or in part- for any purpose other than to evaluate this proposal / quotation / bid.
This specifically includes any and all competitors or similar companies of this nature. The information subject to this restriction
is contained in the sheets hearing a reference to the restrletlon nonce on tris title page
Addendum A — Quote
City of Carmel Fire Station 43
SCOPE OF WORK
Cat 6 cabling and IT Room
Install (48) Category 6 Voice/Data/AP/Camera runs
Terminate runs to Leviton Category 6 RJ -45 jacks and test
Install (I) Leviton category 6 48 -port patch panel and terminate
Install (1) 2 -post rack with vertical wire managers on each side
Install (2) horizontal wire managers
Install (1) cable runway above racks to support cables and stabilize the rack
Install (1) rack elevation kit
Install (2) waterfalls
Provide and install (1) UPS
Provide a lift
COAX Cabling for TV locations
Install (8) RG6 runs to TV locations.
Terminate each end with RG -6 fittings
Install (8) F -connector faceplates
Leave coiled in IT room
Overhead Paging
Install (12) Bogen Drop in ceiling speakers
Install (I) existing Klipsch speaker and volume control
Install (I) Bogen 100 watt amp
Install (I) Bogen Telephone input module
Install (1) Bogen Tone Generator
Install Cabling
Project Pricing
Labor: $ 7,549.68
Materials: $10 131 81
Total: 517,681.49 (Sales tax is not included if applicable)
Customer Acceptance
Date Taylored Systems Acceptance
Should you decide to accept this quote, please provide a PO along with our signed contract and
signed scope -of -work.
To our valued customers. Taylored Systems takes pride in striving to meet our customer's needs and timelines. Please
help us in realizing it takes time for us to order the materials and schedule the necessary manpower to install your
Structured Cabling Project. Taylored Systems needs (10) Business days to begin your project atter contract is signed and
down payment is received. This allows us to order materials and schedule manpower. Should you desire a date sooner than
this, an expedite tee may be required.
.411 materials are subject to manufacturers applicable to re -stocking fees. All custom or special order items are non-
refundable and cannot be returned
Due to escalating raw material costs our suppliers have informed us that copper cable is subject to "price in effect" at the
time of order. Should you decide to work with Taylored Systems on this project please give us a call to verify any change
in cable pricing. We apologize for any inconvenience this may cause.