Loading...
HomeMy WebLinkAboutFwd Carmel Elevator (2).msg Bernida Egging Chapman Vice President of Construction Spectrum Retirement Communities 200 Spruce Street, Suite 200 <x-apple-data-detectors://1/0> Denver, CO 80230 <x-apple-data-detectors://1/0> (303) 360-8812 <tel:(303)%20360-8812> Sent from my iPhone Begin forwarded message: From: "Jana Bee Triplett" <jbeetriplett@gastingerwalker.com> To: "Bernida Chapman" <bchapman@spectrumretirement.com>, "Mike Longfellow" <mlongfellow@spectrumretirement.com> Cc: "Laura Scott" <lscott@gastingerwalker.com> Subject: FW: Carmel Elevator Bernida/Mike, Attached are the three options. We are still waiting on MEP info from Kone so we don’t have that piece, but do have the structural items. Option 3 elevations can be more detailed, but we are leaning in this direction due to the issues with both internal elevators. Please review and let us know if you want us to forward to Catamount. Option 1- Custom Elevator Cab Bolt C10x15.3x13’-8”long ledger to corridor face of CMU wall with ¾”diameter Hilti HAS Rods with sleeves and Hilti HIT HY 20 adhesive (4 ¾” embedment minimum) @16”oc. To occur at each story (3 thus). Remove existing elevator divider beams and front wall posts at each story. Remove front wall block as required to create elevator opening for cab. Install new W6x15 guide rail support beams at north and south sides of elevator at elevations to be coordinated with elevator supplier (may reuse existing W6x15s). Install elevator and infill front wall with CMU as required to create opening. Option 2- Move Corridor Side Elevator Wall 1’-2” East Shore existing corridor and roof framing approximately 3’-0” from face of existing corridor side CMU wall. Remove existing elevator divider beams and front wall posts at each story, and remove corridor side CMU wall. Remove existing east wall of elevator pit. Construct new foundation wall and footing as shown in Option 2 schematic sketch A. Construct CMU wall and corridor wall support ledgers as shown in Option 2 schematic sketch B. Revise truss framing as required by truss supplier. Install elevator divider beams and guide rail support steel at elevations to be coordinated with elevator supplier (may reuse existing steel- some modification would be require to fit new elevator pit size). Option 3- New Elevator at End of A1 Corridor Underpin existing foundation, add guiderail support, and modify roof framing per Option 3 schematic sketch A and B. Jana Bee Triplett AIA, NCARB GastingerWalker& | Managing Partner 817 Wyandotte Kansas City, MO 64105 816.569.0832 | gastingerwalker.com <http://gastingerwalker.com/>