HomeMy WebLinkAboutRE Drury Status - ROW Bond (2).msgGary,
Please see the attached outlet permit from the City.
Thanks,
Brad
From: Duncan, Gary R [mailto:gduncan@carmel.in.gov]
Sent: Wednesday, August 13, 2014 10:02 AM
To: Twomey, Sean
Cc: Barnes, David R; Nesbit, Casey; Fetahagic, Alen; Schrage, Brad; Bertelsmann, Mike; Mishler, Nicholas F; gilko@crossroadengineers.com; Thomas, John G; Kashman, Jeremy M
Subject: RE: Drury Status - ROW Bond
Thanks so much Sean.
I checked the status of this project and see that I do not have a record of drainage design approval from Crossroads. Please verify with them prior to submitting your final plans.
Once we receive the construction plans we will sign them , issue the Storm Water Management Permit and then you may schedule the preconstruction meeting. Please confirm the following:
1. Please confirm that you have applied for a right-of-way permit.
2. Please advise as to the status of the permit from the County.
After we release this for construction, the following items are still needed:
1. BMP Easements approved by the BPW and recorded
2. Final O&M manual approved and recorded
3. Dedication of Right-of-Way through the BPW
4. PDF of the final drainage report
From: Twomey, Sean [mailto:sean.twomey@ddcmail.com]
Sent: Tuesday, August 12, 2014 2:54 PM
To: Duncan, Gary R
Cc: Barnes, David R; Nesbit, Casey; Afetahagic@structurepoint.com <mailto:Afetahagic@structurepoint.com> ; BSchrage@structurepoint.com; Bertelsmann, Mike; Mishler, Nicholas F
Subject: FW: Drury Status - ROW Bond
Gary –
We have resolved our ROW bond amount (see email from Dave Barnes below) and are in the process of issuing the bond. My understanding is that engineering now just needs the signed construction
drawing sets (9 copies) in order to release the building permit and schedule our preconstruction meeting. Please confirm and we will get the sets to you as soon as possible. I am holding
off printing until we are sure there are no more comments or outstanding items.
I would like to get these to you today if possible. Thanks for your help.
Sean T. Twomey, AIA, DBIA
Managing Director - Architecture + Engineering
Drury Development Corporation
721 Emerson Road, Suite 200
St. Louis, MO 63141
d: (314) 587.2508
m: (314) 456.6638
e: sean.twomey@ddcmail.com <mailto:sean.twomey@ddcmail.com>
From: Nesbit, Casey
Sent: Tuesday, August 12, 2014 1:47 PM
To: Twomey, Sean; Schrage, Brad (BSchrage@structurepoint.com) (BSchrage@structurepoint.com); Afetahagic@structurepoint.com
Subject: FW: Drury Status - ROW Bond
FYI – We are issuing bond for amount in following email
From: Barnes, David R [mailto:dbarnes@carmel.in.gov]
Sent: Tuesday, August 12, 2014 1:17 PM
To: Nesbit, Casey
Subject: RE: Drury Status
Casey,
I have received the engineer’s estimate for the Drury ROW bond amount and it is approved. ($5,352.00) Please send a performance bond for that amount at your earliest convenience.
The original “Right of Way Permit Bond” 106116234 in amount of $34,131.00 will be sent back to your attention at 721 Emerson Road, Suite 200, St. Louis, MO. 63141. Please confirm that.
Thank you.
Dave Barnes
________________________________
DISCLAIMER:
This message contains confidential information and is intended only for the individual named. If you are not the named addressee, you should not disseminate, distribute, utilize, or
copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake, and delete this e-mail from your system. No design changes or decisions
made by e-mail shall be considered part of the contract documents unless otherwise specified, and all design changes and/or decisions made by e-mail must be submitted as an RFI or a
submittal unless otherwise specified. All designs, plans, specifications and other contract documents (including all electronic files) prepared by American Structurepoint shall remain
the property of American Structurepoint, and American Structurepoint retains all rights thereto, including but not limited to copyright, statutory and common-law rights thereto, unless
otherwise specified by contract. E-mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete,
or contain viruses. The sender therefore does not accept liability for any errors or omissions in the contents of this message which arise as a result of e-mail transmission. If verification
is required, please request a hard-copy version. American Structurepoint, Inc., 7260 Shadeland Station, Indianapolis, IN 46256, USA, http://www.structurepoint.com/
http://www.emaildisclaimers.com/
1.0