HomeMy WebLinkAboutRE Drury Plaza.msgUnderstood. We are trying to get someone from the engineering department to attend as well. I believe when we spoke you had indicated that engineering and CTRWD were your outstanding
items. Could you let me know if those are the only hold ups or if there are others remaining. I know previously that Carmel Utilities and the surveyors office had comments, but we
have addressed those I believe, but I never saw a final confirmation.
Thanks,
Brad
-----Original Message-----
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, July 16, 2014 10:52 AM
To: Schrage, Brad
Subject: RE: Drury Plaza
Yes, I will be happy to meet. However, there is not much I will be able to tell you other than give you a rundown of each department I need to hear from. The approvals for engineering,
utilities, etc have to come from those departments and I wouldn't have details on what they still need addressed.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
-----Original Message-----
From: Schrage, Brad [mailto:BSchrage@structurepoint.com]
Sent: Wednesday, July 16, 2014 10:48 AM
To: Mishler, Nicholas F
Subject: RE: Drury Plaza
As of now, its myself and Sean Twomey from Drury.
Sent from my Windows Phone
________________________________
From: Mishler, Nicholas F
Sent: 7/16/2014 10:45 AM
To: Schrage, Brad
Subject: RE: Drury Plaza
That will work. Who else do you have coming in to meet with us?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Schrage, Brad [mailto:BSchrage@structurepoint.com]
Sent: Wednesday, July 16, 2014 10:44 AM
To: Mishler, Nicholas F
Subject: Drury Plaza
Nick,
Would you still be available this afternoon around 2 pm to discuss any outstanding items?
Thanks,
Brad
_________________________________________
Brad Schrage, P.E., LEED AP
Project Engineer, Civil Group
7260 Shadeland Station, Indianapolis, IN 46256
T 317.547.5580 E bschrage@structurepoint.com<mailto:bschrage@structurepoint.com>
F 317.543.0270 W www.structurepoint.com<http://www.structurepoint.com/>
C 317.372.6081
Follow us on [cid:image001jpg@01CFA0E3.09DC3300] <http://www.facebook.com/home.php#!/pages/American-Structurepoint-Inc/308123878516> [cid:image002.jpg@01CFA0E3.09DC3300] <http://twitter.com/#!/Ame
ricanStrpnt>
_________________________________________
Brad Schrage, P.E., LEED AP
Project Engineer, Civil Group
7260 Shadeland Station, Indianapolis, IN 46256
T 317.547.5580 E bschrage@structurepoint.com<mailto:bschrage@structurepoint.com>
F 317.543.0270 W www.structurepoint.com<http://www.structurepoint.com/>
C 317.372.6081
Follow us on [cid:image001.jpg@01CFA0E3.09DC3300] <http://www.facebook.com/home.php#!/pages/American-Structurepoint-Inc/308123878516> [cid:image002.jpg@01CFA0E3.09DC3300] <http://twitter.com/#!/Am
ericanStrpnt>
________________________________
DISCLAIMER:
This message contains confidential information and is intended only for the individual named. If you are not the named addressee, you should not disseminate, distribute, utilize, or
copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake, and delete this e-mail from your system. No design changes or decisions
made by e-mail shall be considered part of the contract documents unless otherwise specified, and all design changes and/or decisions made by e-mail must be submitted as an RFI or a
submittal unless otherwise specified. All designs, plans, specifications and other contract documents (including all electronic files) prepared by American Structurepoint shall remain
the property of American Structurepoint, and American Structurepoint retains all rights thereto, including but not limited to copyright, statutory and common-law rights thereto, unless
otherwise specified by contract. E-mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete,
or contain viruses. The sender therefore does not accept liability for any errors or omissions in the contents of this message which arise as a result of e-mail transmission. If verification
is required, please request a hard-copy version. American Structurepoint, Inc., 7260 Shadeland Station, Indianapolis, IN 46256, USA, http://www.structurepoint.com/
http://www.emaildisclaimers.com/
not necessary.
Crossroads Comments
6. Comments 1(b), 3(k), 3(o), 5, 6(ii), 6(xiv), 7, 8 need to be addressed.
SWPPP Comments
7. It appears the U.S. Army Corps jurisdictional determination is valid for 5 years to the date that the letter was issued. The letter was issued on March 10, 2009 meaning it has
expired on March 10 of this year. We are checking with John Thomas on this.
8. Based on the information provided it is apparent that the volume of the existing ponds is 3-times the City requirements for the ponds to be considered adequate for water quality
purposes and qualify as a second BMP.
9. The water quality unit must be sized per the Indianapolis Approved BMP list. According to the Indianapolis list, the proposed AS-7 will not be able to treat the 6.58-cfs generated
by the site. An AS-10 will be required to meet this treatment rate.
10. Please list the wet pond as a BMP in #2 of the post-construction SWPPP.
11. For the O&M manual:
a. Provide a telephone number and email address for the BMP owner.
b. Replace the current owner acknowledgement agreement with the Carmel format and list the BMPs on this page.
c. Show the location of the points of discharge for storm water treated by the BMPs.
d. Provided cross sections of the BMPs.
Additional Comments
12. Is the off-site sanitary sewer work wholly within the INDOT right-of-way? If any of the work is within the City right-of-way, additional approvals may be required from the BPW.
13. What is the proposed slope from the property line to the top back curb along the perimeter of the parking lot? City standard maximum is 3:1 slope.
14. Has the wooded area north and west of the site been altered by the INDOT project? Does the drainage still come into the site as the contours show? If so, a flood route easement
needs to be provided and this flood route considered in the establishment of the MLAG and MFPG elevations.
15. There appears to be a low spot just off-site along the north/west property line where the top back curb is higher and water will be trapped.
Administrative Items Customarily required prior to construction plan release
16. Performance Bond for the Construction Phase Erosion and Sediment Control Measure and the Post Construction BMP
17. Payment of the thoroughfare plan commitment
18. Right-of-way permit for construction access
19. Storm water management permit (please submit the application ASAP)
20. BMP Easements approved by the BPW and recorded
21. Final O&M manual approved and recorded
22. Dedication of Right-of-Way through the BPW
23. Outlet permit from the Hamilton County Surveyors Office
Thanks so much,
Gary
Gary R. Duncan, Jr., PE
Assistant City Engineer
City of Carmel
Department of Engineering
One Civic Square
Carmel, IN 46032
(317) 571-2441
(317) 571-2439 (fax)
gduncan@carmel.in.gov
P Please consider the environment before printing this e-mail