Loading...
HomeMy WebLinkAboutFW Woodland terrace project .msgCaptain Ellison, Attached are the revisions to the plans you requested. I will drop off three sets of plans to Nick this afternoon. Thank you. John Muscatiello Estimator -------------------------- The Justus Companies 1398 N. Shadeland Ave Indianapolis, IN Tel: (317) 353-8311 Fax: (317) 352-1570 Email: JMuscatiello@justus.net Website: -----Original Message----- From: Dave Wietbrock [mailto:dwietbrock@interdesign.com] Sent: Wednesday, September 10, 2014 4:37 PM To: John Muscatiello Cc: Dan Ware Subject: RE: Woodland terrace project. See attached for updated life safety plans for Captain Ellison. Please let me know if he needs any additional information. David A. Wietbrock, AIA LEED AP BD+C DIRECTOR OF ARCHITECTURE / PROJECT ARCHITECT InterDesign office: 317.263.9655 mobile: 317.410.9138. www.InterDesign.com Please consider the environment before printing this email -----Original Message----- From: John Muscatiello [mailto:JMuscatiello@justus.net] Sent: Tuesday, September 09, 2014 9:49 AM To: 'Ellison, Christopher M' Cc: Dave Wietbrock Subject: RE: Woodland terrace project. Captain Ellison, I just finished up with a meeting with Dave from Interdesign. He is working on the Life Safety and Occupant Load and should have it completed by Thursday. John Muscatiello Estimator -------------------------- The Justus Companies 1398 N. Shadeland Ave Indianapolis, IN Tel: (317) 353-8311 Fax: (317) 352-1570 Email: JMuscatiello@justus.net Website: -----Original Message----- From: Ellison, Christopher M [mailto:CEllison@carmel.in.gov] Sent: Tuesday, September 9, 2014 8:33 AM To: John Muscatiello Subject: RE: Woodland terrace project. John, I wanted to let you know I have received the updated site plans and have reviewed them. I don't have any additional site questions at this time. Do you have a status on the Life safety and occupant load information that we discussed last week? Once I received that information I can complete my review. Thanks, Capt. Chris Ellison CFD -----Original Message----- From: John Muscatiello [mailto:JMuscatiello@justus.net] Sent: Thursday, September 04, 2014 11:40 AM To: Ellison, Christopher M Cc: Bob Treadway Subject: RE: Woodland terrace project. Attached is the letter in regards to the asphalt binder Thanks John Muscatiello Estimator -------------------------- The Justus Companies 1398 N. Shadeland Ave Indianapolis, IN Tel: (317) 353-8311 Fax: (317) 352-1570 Email: JMuscatiello@justus.net Website: -----Original Message----- From: Ellison, Christopher M [mailto:CEllison@carmel.in.gov] Sent: Wednesday, September 3, 2014 10:37 AM To: John Muscatiello Cc: Knott, Bruce; Mishler, Nicholas F Subject: Woodland terrace project. John, I have begun reviewing the plans for the proposed woodland terrace project. Be advised the plans that have been submitted to the city of Carmel and submitted for my review do not reflect the items we addressed during our May 5, 2014 meeting. On May 5th we discussed fire department connections and fire hydrants locations and post indicator valves, along with fire department vehicle access during construction. Further more during my quick review I noticed that architectural drawing A0.0 is not provided in the submitted set. Does this page provide code design information and life safety drawings for this project?? This information is required in order for me to complete a review. Please advise the status of this needed information so I can proceed with my review. Respectfully, Capt. Chris Ellison Carmel Fire Dept. Sent from my iPhone