Loading...
HomeMy WebLinkAboutFW 146th & River Road - River Rd Shops Building #3.msgBruce Please see the attached site plan showing the location of the temporary sidewalk that will act as a hard surface egress from the backside of Building # 3 until, at some point in the future, the permanent asphalt path will be installed. Please review and let me know if you have any concerns with this plan prior to us getting started on the installation. Thanks for all your help on this matter, Jeff Lewis Project Manager/Estimator Gilliatte General Contractors, Inc. 2515 Bloyd Avenue Indianapolis, Indiana 46218 (317) 638-3355 office (317) 634-5997 fax www.gilliatte.com <http://www.gilliatte.com/> NOTICE: This e-mail message and all attachments transmitted with it contain confidential and proprietary business information owned by Gilliatte General Contractors, Inc. and intended solely for the use of the addressee. If the recipient of this message is not the intended person or entity, you are hereby notified that any reading, dissemination, distribution, copying, or other use of this message, its contents, hyperlinks, and attached files of any kind is strictly prohibited. If you have received this message in error, please notify the sender immediately by a reply to this electronic mail message and delete this message and all copies and backups thereof. All rights to the information contained in this e-mail are reserved by Gilliatte General Contractors, Inc. From: Conn, Angelina V [mailto:Aconn@carmel.in.gov] Sent: Friday, December 11, 2015 4:18 PM To: 'Greg Ilko' Cc: Charles Key; Adam Gilliatte; Jeff Lewis; Dustin Myers; Mishler, Nicholas F; Blanchard, Jim E; Littlejohn, David W Subject: RE: 146th & River Road - River Rd. Shops Building #3 Hi, Greg – That temporary sidewalk solution works for me. Thanks for letting me know. Angie Conn, AICP | Planning Administrator City of Carmel Planning & Zoning Dept. 1 Civic Square, 3rd Flr., Carmel, IN 46032 O: 317-571-2417 | F: 317-571-2426 | W: www.carmeldocs.com <http://www.carmeldocs.com/> From: Greg Ilko [mailto:gilko@crossroadengineers.com] Sent: Friday, December 11, 2015 4:14 PM To: Conn, Angelina V Cc: Charles Key; Adam Gilliatte; Jeff Lewis; Dustin Myers Subject: 146th & River Road - Building #3 Importance: High Angie, Due to the fact that the section of River Road adjacent to Charlie’s Building #3 is not yet reconstructed, the path has yet to be built. For occupancy, the FD is requiring hard surface access from all egress points, so we’ve modified the site plan per the attached to show a temporary sidewalk extending to the north and south as need be to accommodate the eastern doors of Building #3 and satisfy the FD comments. This walk can/will be removed once the River Road design is done and final grading is determined for the permanent path. Please let me know if there is any further action necessary at this time. They are looking to get that walk installed next week. Thanks! Gregory J. Ilko, P.E. CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 Office: 317-780-1555 ext. 112 Mobile: 317-408-3609 Fax: 317-780-6525 www.crossroadengineers.com