Loading...
HomeMy WebLinkAboutRE River Road Shops buildings 2 and 3 (PC docket no 14050011) (2).msgThank you, Shawn. The Building Elevations look pretty good, and I hope to have them stamped, approved very soon. The Site Plan, however, is not up to date, as it relates to the proposed pedestrian path that will run along the south property line. There are emails from Oct. 6 that went back and forth between the City and Crossroad Engineers on how to remedy that asphalt path location ‘challenge’. I can forward those to you, or I can just follow up with Crossroads to get that buttoned up. Please let me know what you prefer. Angie Conn, Planning Administrator, AICP City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov <mailto:aconn@carmel.in.gov> | Web: www.carmeldocs.com <http://www.carmeldocs.com/> Please consider the environment before printing this e-mail From: Curran, Shawn [mailto:scurran@curran-architecture.com] Sent: Tuesday, November 18, 2014 10:44 AM To: Conn, Angelina V Cc: charles key; 'Greg Ilko'; Mishler, Nicholas F Subject: RE: River Road Shops buildings 2 and 3 Thanks. Attached is a PDF copy of the elevations and site plan that are included in the CD set. Please let me know if you have questions about the building, and let Greg Ilko know if you have site related questions. Sorry about the confusion! From: Conn, Angelina V [mailto:Aconn@carmel.in.gov] Sent: Tuesday, November 18, 2014 10:36 AM To: Curran, Shawn Cc: charles key; 'Greg Ilko'; Mishler, Nicholas F Subject: RE: River Road Shops buildings 2 and 3 Good morning, Shawn – I emailed Nick Mishler and the ‘builder’ with what I needed to review, on Oct. 13. Then, I circled back with Nick on Oct. 21 to let him know via email that I still had not received anything from the builder. (Basically, I still need the proposed site plan and proposed architectural elevations via email and in a pdf format or similar….) Here is what I wrote on Oct. 13 to Nick and had cc’d to klcrealty@sbcglobal.net <mailto:klcrealty@sbcglobal.net> : Good morning, Nick – My Dept. needs pdf’s of the site plan and of both buildings’ exterior architectural elevations (all sides). We need to make sure that what the Plan Commission approved (under Docket No. 14050011 ADLS Amend) is what they propose to build. Also, regarding the path that runs along the south property line, we are still working with Crossroad Engineers and Platinum Properties, to get that final design/layout finalized, for where it ends at the west property line. Angie Conn, Planning Administrator, AICP City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov <mailto:aconn@carmel.in.gov> | Web: www.carmeldocs.com <http://www.carmeldocs.com> Please consider the environment before printing this e-mail From: Curran, Shawn [mailto:scurran@curran-architecture.com] Sent: Tuesday, November 18, 2014 10:26 AM To: Conn, Angelina V Cc: charles key; 'Greg Ilko' Subject: River Road Shops buildings 2 and 3 Good morning, Angie! Per your request, I’m emailing you with the reason for my call a few minutes ago. Charlie Key, the developer of River Road Shops retail development contacted me yesterday and said that Nick from the building permit office told him there was something holding up the issuance of the permit for buildings 2 and 3. He indicated that an email had been sent out on 10/21 with information that was needed. I called Nick this morning to find out what the issue was, since we had not heard anything about any issues needing addressed. Nick told me that there were utility fees that needed to be paid, and also something to do with planning and zoning. He didn’t say what this planning and zoning issue was, just that I would need to contact you. Can you forward over whatever the request was from 10/21 and/or let me know what it is that Planning and Zoning is in need of? Charlie is trying to get the foundations and parking lot work done before winter (which sounds funny since there is snow on the ground now). Please feel free email back or give me a call at the office or on my cell phone. Thanks for your help! ----- Shawn M. Curran President Curran Architecture 6925 E. 96th Street, Suite 105 Indianapolis, IN 46250 Office : 317-288-0681 Cell : 317-502-3360 Fax : 317-288-0753 website <http://www.curran-architecture.com/> | twitter <http://www.twitter.com/curranarchitect/> | facebook <http://www.facebook.com/curranarchitecture/> | instagram <http://www.instagram.com/cur ranarchitect/> 《〰㔱㌴ㄶ‰〰〰‰《〰㘱㜴㌴‴〰〰‰《〰㘱㜴㌶‷〰〰‰《〰㔱㌴㘶‸〰〰‰《〰㘱㜴〸‰〰〰‰《〰㘱㜴㌹″〰〰‰《〰㘱㠴㠶′〰〰‰《〰㘱㠴ㄸ‷〰〰‰《〰㔱㌴㈷″〰〰‰《〰㘱㤴〱‰〰〰‰《〰㘱㤴㌲‵〰〰‰《〰㘱㤴㐸′〰〰‰《〰㘱㤴㜹″〰〰‰《〰㘱〵〱‴〰〰‰《〰㘱〵㌲‵〰〰‰《〰㘱〵㘳‶〰〰‰《〰㘱〵㤴‷〰〰‰《〰㘱〵㈶‸〰〰‰《〰㘱〵㔷‹〰〰‰《〰㘱〵㐹′〰〰‰ 《〰㘱ㄵ㜰″〰〰‰《〰㘱ㄵ〲‴〰〰‰《〰㘱ㄵ㌳‵〰〰‰《〰㘱ㄵ㘴‶〰〰‰《〰㘱ㄵ㤵‷〰〰‰《〰㘱ㄵ㈷‸〰〰‰《〰㘱㈵ㄸ′〰〰‰《〰㘱㈵㐹‵〰〰‰《〰㘱㌵㌲‰〰〰‰《〰㘱㌵㘳‵〰〰‰《〰㘱㌵㠵‸〰〰‰《〰㘱㌵㘷‵〰〰‰《〰㘱㌵㤸‸〰〰‰《〰㘱㔵㤳‵〰〰‰《〰㘱㘵〵‴〰〰‰《〰㘱㘵㌶‷〰〰‰《〰㔱㌴㜷‸〰〰‰《〰㘱㘵㤸‸〰〰‰《〰㘱㜵㜰″〰〰‰《〰㔱㌴㈸‴〰〰 ‰《〰㘱㜵〲‴〰〰‰《〰㘱㜵㜳‹〰〰‰《〰㘱㜵㈵‰〰〰‰《〰㘱㜵㤶‱〰〰‰《〰㘱㜵㘸′〰〰‰《〰㘱㠵㔰‵〰〰‰《〰㘱㠵㔲′〰〰‰《〰㘱㠵㈵‸〰〰‰《〰㘱㠵㘶‱〰〰‰《〰㘱㠵㤷‴〰〰‰《〰㘱㠵㜹‱〰〰‰《〰㘱㤵〱‴〰〰‰《〰㘱㤵㌲‵〰〰‰《〰㘱㤵㘳‸〰〰‰《〰㘱㤵〵″〰〰‰《〰㘱㤵㌷‸〰〰‰《〰㘱㤵㈹‱〰〰‰《〰㘱〶〱‴〰〰‰《〰㘱〶㠲‷〰〰‰《〰㘱〶㠴‴〰 〰‰《〰㘱ㄶ㘲‹〰〰‰《〰㘱㈶㘰‶〰〰‰《〰㘱㈶㈳‷〰〰‰《〰㘱㌶㘳‰〰〰‰《〰㘱㌶㐸‱〰〰‰《〰㘱㐶㌰‴〰〰‰《〰㘱㐶〲‷〰〰‰《〰㘱㐶㠳‰〰〰‰《〰㘱㐶〷‵〰〰‰《〰㘱㐶㤹‰〰〰‰《〰㘱㔶ㄹ‱〰〰‰《〰㘱㘶〲‸〰〰‰《〰㘱㘶ㄵ″〰〰‰《〰㘱㘶㘷′〰〰‰《〰㘱㘶㌹‵〰〰‰《〰㘱㜶ㄳ′〰〰‰《〰㘱㜶〵‵〰〰‰《〰㘱㜶㘹‶〰〰‰《〰㘱㠶㜷‹〰〰‰《〰㘱㤶㌰′ 〰〰‰《〰㘱㤶㈲‵〰〰‰《〰㘱㤶㘴‶〰〰‰《〰㘱〷㄰‱〰〰‰《〰㘱〷㘳‰〰〰‰《〰㘱〷㤵″〰〰‰《〰㘱〷㔸‸〰〰‰《〰㘱ㄷ㌰‱〰〰‰《〰㘱ㄷ〳‸〰〰‰《〰㘱ㄷ㈵‹〰〰‰《〰㘱ㄷ㌷‴〰〰‰《〰㘱㈷㈰‷〰〰‰《〰㘱㈷㘲‸〰〰‰《〰㘱㈷㐴‱〰〰‰《〰㘱㈷ㄶ‴〰〰‰《〰㘱㈷㔷‹〰〰‰《〰㘱㈷㘹‶〰〰‰《〰㘱㌷㤰‹〰〰‰《〰㔱㌴㜸‸〰〰‰《〰㘱㌷㘳‸〰〰‰《〰㘱㌷㐵 ‵〰〰‰《〰㘱㌷㜶‸〰〰‰《〰㘱㌷㘸″〰〰‰《〰㘱㐷㐱‴〰〰‰《〰㘱㐷ㄴ‷〰〰‰《〰㘱㔷㌵‰〰〰‰《〰㔱㌴㌹″〰〰‰《〰㘱㔷㤶‹〰〰‰《〰㘱㔷㐸‰〰〰‰《〰㘱㔷㤹″〰〰‰《〰㘱㘷㔱‰〰〰‰《〰㘱㘷㤲‱〰〰‰《〰㘱㘷㐴‴〰〰‰《〰㘱㘷㠵‵〰〰‰《〰㘱㘷㐷′〰〰‰《〰㔱㌱〵‵〰〰‰《〰㐱㈱ㄱ‶〰〰‰《〰〱㘹㐴‶〰〰‰《〰㌱㔴㈷″〰〰‰《〰㌱㔴㜹‱〰〰‰《〰㘱㘷 㤸‵〰〰‰《〰㘱㜷㔰‶〰〰‰《〰㘱㜷ㄲ″〰〰‰《〰㘱㜷㜳‰〰〰‰《〰㘱㜷㈵″〰〰‰《〰㘱㜷㜶‶〰〰‰《〰㘱㜷㈸‹〰〰‰《〰㘱㜷㜹‰〰〰‰《〰㘱㠷㈱‷〰〰‰《〰㘱㠷㘲‸〰〰‰《〰㘱㠷㔵″〰〰‰《〰㘱㤷〷‶〰〰‰《〰㘱〸㐰‷〰〰‰《〰㘱〸㐲‴〰〰‰《〰㘱〸〴‹〰〰‰《〰㘱〸㐵′〰〰‰《〰㌱㘴㔱‴〰〰‰《〰㐱㜰㤶‹〰〰‰《〰㔱ㄵ㈵‸〰〰‰《〰㔱㌴㠹″〰〰‰《〰㘱 〸㜶‵〰〰‰《〰㘱㌸ㄱ‵〰〰‰《〰㘱㈸㔹‸〰〰‰《〰㘱㈸㠶‵〰〰‰《〰㘱㈸㐸‴〰〰‰《〰㘱㌸㤱′〰〰‰琊慲汩牥㰊‼⼠楓敺㜠㜹⼠潒瑯㜠ㄹ〠删⼠湉潦㜠㘹〠删㸊ਾ瑳牡硴敲੦㘱㌸ㄴਸ┥佅െ