Loading...
HomeMy WebLinkAboutRE 146th & River Road - River Rd Shops Building #3 (5).msgThanks Angie. I have since been told by the contractor that they will probably stick to the original plan, but it's good that we have the alternative option if necessary. G Sent from my Verizon Wireless 4G LTE smartphone -------- Original message -------- From: "Conn, Angelina V" <Aconn@carmel.in.gov> Date: 01/05/2016 11:38 AM (GMT-05:00) To: 'Greg Ilko' <gilko@crossroadengineers.com> Cc: 'Charles Key' <klc57@yahoo.com>, 'Adam Gilliatte' <agilliatte@gilliatte.com>, 'Jeff Lewis' <jlewis@gilliatte.com>, 'Dustin Myers' <djmyers@crossroadengineers.com>, "Mishler, Nicholas F" <nmishler@carmel.in.gov>, "Blanchard, Jim E" <JBlanchard@carmel.in.gov>, "Littlejohn, David W" <dlittlejohn@carmel.in.gov>, "Jordan, Alex" <ajordan@carmel.in.gov>, "Ellison, Christopher M" <CEllison@carmel.in.gov> Subject: RE: 146th & River Road - River Rd. Shops Building #3 Hi, Greg – Thanks for asking. I have no issues with this temporary sidewalk re-location. Angie Conn, AICP | Planning Administrator City of Carmel Planning & Zoning Dept. 1 Civic Square, 3rd Flr., Carmel, IN 46032 O: 317-571-2417 | F: 317-571-2426 | W: www.carmeldocs.com <http://www.carmeldocs.com/> From: Greg Ilko [mailto:gilko@crossroadengineers.com] Sent: Monday, January 04, 2016 11:53 AM To: Conn, Angelina V Cc: 'Charles Key'; 'Adam Gilliatte'; 'Jeff Lewis'; 'Dustin Myers'; Mishler, Nicholas F; Blanchard, Jim E; Littlejohn, David W Subject: RE: 146th & River Road - River Rd. Shops Building #3 Importance: High Angie, Due to some existing conflicts with landscaping and irrigation, we need to kick more of the temporary walk east. Please review and confirm that there are no issues with this realignment (orange highlighted portions). Thanks! Gregory J. Ilko, P.E. CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 Office: 317-780-1555 ext. 112 Mobile: 317-408-3609 Fax: 317-780-6525 www.crossroadengineers.com From: Conn, Angelina V [mailto:Aconn@carmel.in.gov] Sent: Friday, December 11, 2015 4:18 PM To: 'Greg Ilko' Cc: Charles Key; Adam Gilliatte; Jeff Lewis; Dustin Myers; Mishler, Nicholas F; Blanchard, Jim E; Littlejohn, David W Subject: RE: 146th & River Road - River Rd. Shops Building #3 Hi, Greg – That temporary sidewalk solution works for me. Thanks for letting me know. Angie Conn, AICP | Planning Administrator City of Carmel Planning & Zoning Dept. 1 Civic Square, 3rd Flr., Carmel, IN 46032 O: 317-571-2417 | F: 317-571-2426 | W: www.carmeldocs.com <http://www.carmeldocs.com/> From: Greg Ilko [mailto:gilko@crossroadengineers.com] Sent: Friday, December 11, 2015 4:14 PM To: Conn, Angelina V Cc: Charles Key; Adam Gilliatte; Jeff Lewis; Dustin Myers Subject: 146th & River Road - Building #3 Importance: High Angie, Due to the fact that the section of River Road adjacent to Charlie’s Building #3 is not yet reconstructed, the path has yet to be built. For occupancy, the FD is requiring hard surface access from all egress points, so we’ve modified the site plan per the attached to show a temporary sidewalk extending to the north and south as need be to accommodate the eastern doors of Building #3 and satisfy the FD comments. This walk can/will be removed once the River Road design is done and final grading is determined for the permanent path. Please let me know if there is any further action necessary at this time. They are looking to get that walk installed next week. Thanks! Gregory J. Ilko, P.E. CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 Office: 317-780-1555 ext. 112 Mobile: 317-408-3609 Fax: 317-780-6525 www.crossroadengineers.com