Loading...
HomeMy WebLinkAbout15030063 Correspondence.pdf1 Mishler, Nicholas F From:Connor Britt <cbritt@gibsoncommercial.com> Sent:Thursday, December 31, 2015 11:30 AM To:Mishler, Nicholas F Subject:Re: Automatic reply: Permit 15030063 Nick, Also, before you process the CofO, please give me a call. Thanks again! Connor Connor Britt | Gibson Commercial Construction Project Manager 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 4) | 317.919.3626 (cell) | 317.536.3912 (fax) cbritt@gibsoncommercial.com This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are sol ely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Thursday, December 31, 2015 at 10:23 AM To: Connor Britt < cbritt@gibsoncommercial.com > Subject: Automatic reply: Permit 15030063 Thank you for your e-mail. I will be out of the office December 30-31 and return on Monday, January 4. I will reply to your e-mail when I return. If you have a question regarding a commercial plan submittal, please contact Pam Lux at 571-2288 or by email at plux@carmel.in.gov . Have a wonderful New Year. Thanks, Nick 2 Mishler, Nicholas F From:Connor Britt <cbritt@gibsoncommercial.com> Sent:Wednesday, December 16, 2015 4:29 PM To:Mishler, Nicholas F Subject:Re: 580 E Carmel - new building Thanks Nick! We will be in to pick this up either tomorrow or Friday. Connor Britt Gibson Commercial Construction 317.919.3626, cell On Dec 16, 2015, at 4:25 PM, Mishler, Nicholas F < nmishler@carmel.in.gov > wrote: OK, this is ready to pick-up. The cost for the revision is $328.00. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Connor Britt [ mailto:cbritt@gibsoncommercial.com ] Sent: Wednesday, December 16, 2015 4:03 PM To: Mishler, Nicholas F Subject: Re: 580 E Carmel - new building Correct. Not changing the footprint of the building or the height. Just deleted some of the interior walls. Connor Britt Gibson Commercial Construction 317.919.3626, cell On Dec 16, 2015, at 3:54 PM, Mishler, Nicholas F < nmishler@carmel.in.gov > wrote: The revisions are all interior correct? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Connor Britt [ mailto:cbritt@gibsoncommercial.com ] Sent: Wednesday, December 16, 2015 9:04 AM 3 To: Mishler, Nicholas F Subject: Re: 580 E Carmel - new building Good Morning Nick, I just wanted to touch base with you on the status of our permit addendum and see where we were at with this? Thanks, Connor Connor Britt | Gibson Commercial Construction Project Manager 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 4) | 317.919.3626 (cell) | 317.536.3912 (fax) cbritt@gibsoncommercial.com This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Tuesday, November 24, 2015 at 8:35 AM To: Connor Britt < cbritt@gibsoncommercial.com > Subject: RE: 580 E Carmel - new building Please complete the attached revision and submit along with 3 sets of these drawings. We will also need 3 affidavit stickers submitted, which we have in our office. Once you submit those, I will have CFD and our building commissioner review the plans. The review time is typically less than one week. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 4 From: Connor Britt [ mailto:cbritt@gibsoncommercial.com ] Sent: Friday, November 20, 2015 10:31 AM To: Mishler, Nicholas F Cc: Bill Poland; Blanchard, Jim E; 'Jake Gibson' Subject: Re: 580 E Carmel - new building Importance: High Good Morning Nick, Attached is our revised CDR to the revisions made to the 580 Carmel Project. I have also attached the revised floor plans that were submitted to the State. Is there anything else that you need from us in order to close this project out in a few weeks? Thanks, Connor Connor Britt | Gibson Commercial Construction Project Manager 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 4) | 317.919.3626 (cell) | 317.536.3912 (fax) cbritt@gibsoncommercial.com This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Tuesday, October 27, 2015 at 10:11 AM To: 'Jake Gibson' < jgibson@gibsoncommercial.com > Cc: Bill Poland < bpoland@gibsoncommercial.com >, Connor Britt <cbritt@gibsoncommercial.com >, "Blanchard, Jim E" < JBlanchard@carmel.in.gov > Subject: RE: 580 E Carmel - new building The builder of record (Gibson) would ultimately be responsible for the project. If the plans have changed we would need to have either a revised CDR or an email from someone at the state acknowledging the changes. I’m not sure the plans to the state would technically have to come from an architect so you might 5 want to send them an email with what is changing and see what they say. I have attached the submittal sheet that shows the contacts for the state. If you have any questions, you can contact our Building Commissioner Jim Blanchard at 317-571-2450, and I have also copied Jim on this email. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Jake Gibson [ mailto:jgibson@gibsoncommercial.com ] Sent: Tuesday, October 27, 2015 10:51 AM To: Mishler, Nicholas F Cc: Bill Poland; Connor Britt Subject: Re: 580 E Carmel - new building No we did not, the architect and owner are not talking anymore, so we have an unusual situation to say the least. We spoke with the architect a few weeks back and they just weren’t interested in doing anything else on the project. Sooo, with that, any idea on how we can approach this? Heading to a meeting now, but happy to talk this afternoon if available? Thanks. Jake Gibson | Gibson Commercial Construction President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 1) | 317.205.7296 (cell) | 317.536.3912 (fax) jgibson@gibsoncommercial.com 6 This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Tuesday, October 27, 2015 at 9:35 AM To: Jake Gibson < jgibson@gibsoncommercial.com > Cc: Bill Poland < bpoland@gibsoncommercial.com >, Connor Britt <cbritt@gibsoncommercial.com > Subject: RE: 580 E Carmel - new building Did you submit these changes to the State of Indiana for review? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Jake Gibson [ mailto:jgibson@gibsoncommercial.com ] Sent: Tuesday, October 27, 2015 7:45 AM To: Mishler, Nicholas F Cc: Bill Poland; Connor Britt Subject: 580 E Carmel - new building Hello Nick. Had a question for you regarding the new office building we are constructing at 580 E Carmel. For budget purposes, we had to remove/rework/simplify the layout on the 1st and 2nd Floor of that building. Basically took out a lot of walls! Didn’t change anything above the ceiling, so we’ve already had those inspections along with the wall rough inspections, but as we approach completion we just wanted to make sure we had everything covered on your end so we don’t have any issues right at final inspection. Be happy to discuss so we have everything in place, just let us know what you need or a good time to talk. Thanks, Jake Jake Gibson | Gibson Commercial Construction President 7 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 1) | 317.205.7296 (cell) | 317.536.3912 (fax) jgibson@gibsoncommercial.com This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. 8 Mishler, Nicholas F From:Connor Britt <cbritt@gibsoncommercial.com> Sent:Wednesday, December 16, 2015 4:03 PM To:Mishler, Nicholas F Subject:Re: 580 E Carmel - new building Correct. Not changing the footprint of the building or the height. Just deleted some of the interior walls. Connor Britt Gibson Commercial Construction 317.919.3626, cell On Dec 16, 2015, at 3:54 PM, Mishler, Nicholas F < nmishler@carmel.in.gov > wrote: The revisions are all interior correct? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Connor Britt [ mailto:cbritt@gibsoncommercial.com ] Sent: Wednesday, December 16, 2015 9:04 AM To: Mishler, Nicholas F Subject: Re: 580 E Carmel - new building Good Morning Nick, I just wanted to touch base with you on the status of our permit addendum and see where we were at with this? Thanks, Connor Connor Britt | Gibson Commercial Construction Project Manager 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 4) | 317.919.3626 (cell) | 317.536.3912 (fax) cbritt@gibsoncommercial.com 9 This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Tuesday, November 24, 2015 at 8:35 AM To: Connor Britt < cbritt@gibsoncommercial.com > Subject: RE: 580 E Carmel - new building Please complete the attached revision and submit along with 3 sets of these drawings. We will also need 3 affidavit stickers submitted, which we have in our office. Once you submit those, I will have CFD and our building commissioner review the plans. The review time is typically less than one week. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Connor Britt [ mailto:cbritt@gibsoncommercial.com ] Sent: Friday, November 20, 2015 10:31 AM To: Mishler, Nicholas F Cc: Bill Poland; Blanchard, Jim E; 'Jake Gibson' Subject: Re: 580 E Carmel - new building Importance: High Good Morning Nick, Attached is our revised CDR to the revisions made to the 580 Carmel Project. I have also attached the revised floor plans that were submitted to the State. Is there anything else that you need from us in order to close this project out in a few weeks? Thanks, Connor Connor Britt | Gibson Commercial Construction Project Manager 3024 Ridgeview Drive | Indianapolis, Indiana 46226 10 317.213.0819 (ext 4) | 317.919.3626 (cell) | 317.536.3912 (fax) cbritt@gibsoncommercial.com This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Tuesday, October 27, 2015 at 10:11 AM To: 'Jake Gibson' < jgibson@gibsoncommercial.com > Cc: Bill Poland < bpoland@gibsoncommercial.com >, Connor Britt < cbritt@gibsoncommercial.com >, "Blanchard, Jim E" < JBlanchard@carmel.in.gov > Subject: RE: 580 E Carmel - new building The builder of record (Gibson) would ultimately be responsible for the project. If the plans have changed we would need to have either a revised CDR or an email from someone at the state acknowledging the changes. I’m not sure the plans to the state would technically have to come from an architect so you might want to send them an email with what is changing and see what they say. I have attached the submittal sheet that shows the contacts for the state. If you have any questions, you can contact our Building Commissioner Jim Blanchard at 317-571-2450, and I have also copied Jim on this email. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Jake Gibson [ mailto:jgibson@gibsoncommercial.com ] Sent: Tuesday, October 27, 2015 10:51 AM To: Mishler, Nicholas F Cc: Bill Poland; Connor Britt Subject: Re: 580 E Carmel - new building No we did not, the architect and owner are not talking anymore, so we have an unusual situation to say the least. We spoke with the architect a few weeks back and they just weren’t interested in doing anything else on the project. Sooo, with that, any idea on how we can approach this? Heading to a meeting now, but happy to talk this afternoon if available? 11 Thanks. Jake Gibson | Gibson Commercial Construction President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 1) | 317.205.7296 (cell) | 317.536.3912 (fax) jgibson@gibsoncommercial.com This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Tuesday, October 27, 2015 at 9:35 AM To: Jake Gibson < jgibson@gibsoncommercial.com > Cc: Bill Poland < bpoland@gibsoncommercial.com >, Connor Britt < cbritt@gibsoncommercial.com > Subject: RE: 580 E Carmel - new building Did you submit these changes to the State of Indiana for review? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Jake Gibson [ mailto:jgibson@gibsoncommercial.com ] Sent: Tuesday, October 27, 2015 7:45 AM To: Mishler, Nicholas F Cc: Bill Poland; Connor Britt Subject: 580 E Carmel - new building 12 Hello Nick. Had a question for you regarding the new office building we are constructing at 580 E Carmel. For budget purposes, we had to remove/rework/simplify the layout on the 1st and 2nd Floor of that building. Basically took out a lot of walls! Didn’t change anything above the ceiling, so we’ve already had those inspections along with the wall rough inspections, but as we approach completion we just wanted to make sure we had everything covered on your end so we don’t have any issues right at final inspection. Be happy to discuss so we have everything in place, just let us know what you need or a good time to talk. Thanks, Jake Jake Gibson | Gibson Commercial Construction President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 1) | 317.205.7296 (cell) | 317.536.3912 (fax) jgibson@gibsoncommercial.com This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. 13 Mishler, Nicholas F From:Connor Britt <cbritt@gibsoncommercial.com> Sent:Wednesday, December 16, 2015 9:04 AM To:Mishler, Nicholas F Subject:Re: 580 E Carmel - new building Good Morning Nick, I just wanted to touch base with you on the status of our permit addendum and see where we were at with this? Thanks, Connor Connor Britt | Gibson Commercial Construction Project Manager 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 4) | 317.919.3626 (cell) | 317.536.3912 (fax) cbritt@gibsoncommercial.com This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finall y, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Tuesday, November 24, 2015 at 8:35 AM To: Connor Britt < cbritt@gibsoncommercial.com > Subject: RE: 580 E Carmel - new building Please complete the attached revision and submit along with 3 sets of these drawings. We will also need 3 affidavit stickers submitted, which we have in our office. Once you submit those, I will have CFD and our building commissioner review the plans. The review time is typically less than one week. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 14 Please consider the environment before printing this email From: Connor Britt [ mailto:cbritt@gibsoncommercial.com ] Sent: Friday, November 20, 2015 10:31 AM To: Mishler, Nicholas F Cc: Bill Poland; Blanchard, Jim E; 'Jake Gibson' Subject: Re: 580 E Carmel - new building Importance: High Good Morning Nick, Attached is our revised CDR to the revisions made to the 580 Carmel Project. I have also attached the revised floor plans that were submitted to the State. Is there anything else that you need from us in order to close this project out in a few weeks? Thanks, Connor Connor Britt | Gibson Commercial Construction Project Manager 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 4) | 317.919.3626 (cell) | 317.536.3912 (fax) cbritt@gibsoncommercial.com This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are sol ely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Tuesday, October 27, 2015 at 10:11 AM To: 'Jake Gibson' < jgibson@gibsoncommercial.com > Cc: Bill Poland < bpoland@gibsoncommercial.com >, Connor Britt < cbritt@gibsoncommercial.com >, "Blanchard, Jim E" <JBlanchard@carmel.in.gov > Subject: RE: 580 E Carmel - new building The builder of record (Gibson) would ultimately be responsible for the project. If the plans have changed we would need to have either a revised CDR or an email from someone at the state acknowledging the changes. I’m not sure the plans to the state would technically have to come from an architect so you might want to send them an email with what is changing and see what they say. I have attached the submittal sheet that shows the contacts for the state. 15 If you have any questions, you can contact our Building Commissioner Jim Blanchard at 317-571-2450, and I have also copied Jim on this email. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Jake Gibson [ mailto:jgibson@gibsoncommercial.com ] Sent: Tuesday, October 27, 2015 10:51 AM To: Mishler, Nicholas F Cc: Bill Poland; Connor Britt Subject: Re: 580 E Carmel - new building No we did not, the architect and owner are not talking anymore, so we have an unusual situation to say the least. We spoke with the architect a few weeks back and they just weren’t interested in doing anything else on the project. Sooo, with that, any idea on how we can approach this? Heading to a meeting now, but happy to talk this afternoon if available? Thanks. Jake Gibson | Gibson Commercial Construction President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 1) | 317.205.7296 (cell) | 317.536.3912 (fax) jgibson@gibsoncommercial.com This email and any files transmitted wit h it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. 16 From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Tuesday, October 27, 2015 at 9:35 AM To: Jake Gibson < jgibson@gibsoncommercial.com > Cc: Bill Poland < bpoland@gibsoncommercial.com >, Connor Britt < cbritt@gibsoncommercial.com > Subject: RE: 580 E Carmel - new building Did you submit these changes to the State of Indiana for review? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Jake Gibson [ mailto:jgibson@gibsoncommercial.com ] Sent: Tuesday, October 27, 2015 7:45 AM To: Mishler, Nicholas F Cc: Bill Poland; Connor Britt Subject: 580 E Carmel - new building Hello Nick. Had a question for you regarding the new office building we are constructing at 580 E Carmel. For budget purposes, we had to remove/rework/simplify the layout on the 1st and 2nd Floor of that building. Basically took out a lot of walls! Didn’t change anything above the ceiling, so we’ve already had those inspections along with the wall rough inspections, but as we approach completion we just wanted to make sure we had everything covered on your end so we don’t have any issues right at final inspection. Be happy to discuss so we have everything in place, just let us know what you need or a good time to talk. Thanks, Jake Jake Gibson | Gibson Commercial Construction President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 1) | 317.205.7296 (cell) | 317.536.3912 (fax) jgibson@gibsoncommercial.com 17 This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. 18 Mishler, Nicholas F From:Connor Britt <cbritt@gibsoncommercial.com> Sent:Friday, November 20, 2015 10:31 AM To:Mishler, Nicholas F Cc:Bill Poland; Blanchard, Jim E; 'Jake Gibson' Subject:Re: 580 E Carmel - new building Importance:High Good Morning Nick, Attached is our revised CDR to the revisions made to the 580 Carmel Project. I have also attached the revised floor plans that were submitted to the State. Is there anything else that you need from us in order to close this project out in a few weeks? Thanks, Connor Connor Britt | Gibson Commercial Construction Project Manager 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 4) | 317.919.3626 (cell) | 317.536.3912 (fax) cbritt@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finall y, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Tuesday, October 27, 2015 at 10:11 AM To: 'Jake Gibson' < jgibson@gibsoncommercial.com > Cc: Bill Poland < bpoland@gibsoncommercial.com >, Connor Britt < cbritt@gibsoncommercial.com >, "Blanchard, Jim E" <JBlanchard@carmel.in.gov > Subject: RE: 580 E Carmel - new building 19 The builder of record (Gibson) would ultimately be responsible for the project. If the plans have changed we would need to have either a revised CDR or an email from someone at the state acknowledging the changes. I’m not sure the plans to the state would technically have to come from an architect so you might want to send them an email with what is changing and see what they say. I have attached the submittal sheet that shows the contacts for the state. If you have any questions, you can contact our Building Commissioner Jim Blanchard at 317-571-2450, and I have also copied Jim on this email. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Jake Gibson [ mailto:jgibson@gibsoncommercial.com ] Sent: Tuesday, October 27, 2015 10:51 AM To: Mishler, Nicholas F Cc: Bill Poland; Connor Britt Subject: Re: 580 E Carmel - new building No we did not, the architect and owner are not talking anymore, so we have an unusual situation to say the least. We spoke with the architect a few weeks back and they just weren’t interested in doing anything else on the project. Sooo, with that, any idea on how we can approach this? Heading to a meeting now, but happy to talk this afternoon if available? Thanks. Jake Gibson | Gibson Commercial Construction President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 1) | 317.205.7296 (cell) | 317.536.3912 (fax) jgibson@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted wit h it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check 20 this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Tuesday, October 27, 2015 at 9:35 AM To: Jake Gibson < jgibson@gibsoncommercial.com > Cc: Bill Poland < bpoland@gibsoncommercial.com >, Connor Britt < cbritt@gibsoncommercial.com > Subject: RE: 580 E Carmel - new building Did you submit these changes to the State of Indiana for review? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Jake Gibson [ mailto:jgibson@gibsoncommercial.com ] Sent: Tuesday, October 27, 2015 7:45 AM To: Mishler, Nicholas F Cc: Bill Poland; Connor Britt Subject: 580 E Carmel - new building Hello Nick. Had a question for you regarding the new office building we are constructing at 580 E Carmel. For budget purposes, we had to remove/rework/simplify the layout on the 1st and 2nd Floor of that building. Basically took out a lot of walls! Didn’t change anything above the ceiling, so we’ve already had those inspections along with the wall rough inspections, but as we approach completion we just wanted to make sure we had everything covered on your end so we don’t have any issues right at final inspection. Be happy to discuss so we have everything in place, just let us know what you need or a good time to talk. Thanks, Jake Jake Gibson | Gibson Commercial Construction President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 1) | 317.205.7296 (cell) | 317.536.3912 (fax) 21 jgibson@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. 22 Mishler, Nicholas F From:Jake Gibson <jgibson@gibsoncommercial.com> Sent:Tuesday, October 27, 2015 4:27 PM To:Mishler, Nicholas F Cc:Bill Poland; Connor Britt; Blanchard, Jim E Subject:Re: 580 E Carmel - new building Got it, thanks Nick! Jake Gibson | Gibson Commercial Construction President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 1) | 317.205.7296 (cell) | 317.536.3912 (fax) jgibson@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted wit h it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Tuesday, October 27, 2015 at 11:11 AM To: Jake Gibson < jgibson@gibsoncommercial.com > Cc: Bill Poland < bpoland@gibsoncommercial.com >, Connor Britt < cbritt@gibsoncommercial.com >, "Blanchard, Jim E" <JBlanchard@carmel.in.gov > Subject: RE: 580 E Carmel - new building The builder of record (Gibson) would ultimately be responsible for the project. If the plans have changed we would need to have either a revised CDR or an email from someone at the state acknowledging the changes. I’m not sure the plans to the state would technically have to come from an architect so you might want to send them an email with what is changing and see what they say. I have attached the submittal sheet that shows the contacts for the state. If you have any questions, you can contact our Building Commissioner Jim Blanchard at 317-571-2450, and I have also copied Jim on this email. 23 Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Jake Gibson [ mailto:jgibson@gibsoncommercial.com ] Sent: Tuesday, October 27, 2015 10:51 AM To: Mishler, Nicholas F Cc: Bill Poland; Connor Britt Subject: Re: 580 E Carmel - new building No we did not, the architect and owner are not talking anymore, so we have an unusual situation to say the least. We spoke with the architect a few weeks back and they just weren’t interested in doing anything else on the project. Sooo, with that, any idea on how we can approach this? Heading to a meeting now, but happy to talk this afternoon if available? Thanks. Jake Gibson | Gibson Commercial Construction President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 1) | 317.205.7296 (cell) | 317.536.3912 (fax) jgibson@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted wit h it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. 24 From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Tuesday, October 27, 2015 at 9:35 AM To: Jake Gibson < jgibson@gibsoncommercial.com > Cc: Bill Poland < bpoland@gibsoncommercial.com >, Connor Britt < cbritt@gibsoncommercial.com > Subject: RE: 580 E Carmel - new building Did you submit these changes to the State of Indiana for review? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Jake Gibson [ mailto:jgibson@gibsoncommercial.com ] Sent: Tuesday, October 27, 2015 7:45 AM To: Mishler, Nicholas F Cc: Bill Poland; Connor Britt Subject: 580 E Carmel - new building Hello Nick. Had a question for you regarding the new office building we are constructing at 580 E Carmel. For budget purposes, we had to remove/rework/simplify the layout on the 1st and 2nd Floor of that building. Basically took out a lot of walls! Didn’t change anything above the ceiling, so we’ve already had those inspections along with the wall rough inspections, but as we approach completion we just wanted to make sure we had everything covered on your end so we don’t have any issues right at final inspection. Be happy to discuss so we have everything in place, just let us know what you need or a good time to talk. Thanks, Jake Jake Gibson | Gibson Commercial Construction President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 1) | 317.205.7296 (cell) | 317.536.3912 (fax) jgibson@gibsoncommercial.com 25 The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. 26 Mishler, Nicholas F From:Jake Gibson <jgibson@gibsoncommercial.com> Sent:Tuesday, October 27, 2015 10:51 AM To:Mishler, Nicholas F Cc:Bill Poland; Connor Britt Subject:Re: 580 E Carmel - new building No we did not, the architect and owner are not talking anymore, so we have an unusual situation to say the least. We spoke with the architect a few weeks back and they just weren’t interested in doing anything else on the project. Sooo, with that, any idea on how we can approach this? Heading to a meeting now, but happy to talk this afternoon if available? Thanks. Jake Gibson | Gibson Commercial Construction President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 1) | 317.205.7296 (cell) | 317.536.3912 (fax) jgibson@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Tuesday, October 27, 2015 at 9:35 AM To: Jake Gibson < jgibson@gibsoncommercial.com > Cc: Bill Poland < bpoland@gibsoncommercial.com >, Connor Britt < cbritt@gibsoncommercial.com > Subject: RE: 580 E Carmel - new building 27 Did you submit these changes to the State of Indiana for review? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Jake Gibson [ mailto:jgibson@gibsoncommercial.com ] Sent: Tuesday, October 27, 2015 7:45 AM To: Mishler, Nicholas F Cc: Bill Poland; Connor Britt Subject: 580 E Carmel - new building Hello Nick. Had a question for you regarding the new office building we are constructing at 580 E Carmel. For budget purposes, we had to remove/rework/simplify the layout on the 1st and 2nd Floor of that building. Basically took out a lot of walls! Didn’t change anything above the ceiling, so we’ve already had those inspections along with the wall rough inspections, but as we approach completion we just wanted to make sure we had everything covered on your end so we don’t have any issues right at final inspection. Be happy to discuss so we have everything in place, just let us know what you need or a good time to talk. Thanks, Jake Jake Gibson | Gibson Commercial Construction President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 1) | 317.205.7296 (cell) | 317.536.3912 (fax) jgibson@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. 28 This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. 29 Mishler, Nicholas F From:Jake Gibson <jgibson@gibsoncommercial.com> Sent:Tuesday, October 27, 2015 7:45 AM To:Mishler, Nicholas F Cc:Bill Poland; Connor Britt Subject:580 E Carmel - new building Hello Nick. Had a question for you regarding the new office building we are constructing at 580 E Carmel. For budget purposes, we had to remove/rework/simplify the layout on the 1st and 2nd Floor of that building. Basically took out a lot of walls! Didn’t change anything above the ceiling, so we’ve already had those inspections along with the wall rough inspections, but as we approach completion we just wanted to make sure we had everything covered on your end so we don’t have any issues right at final inspection. Be happy to discuss so we have everything in place, just let us know what you need or a good time to talk. Thanks, Jake Jake Gibson | Gibson Commercial Construction President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 1) | 317.205.7296 (cell) | 317.536.3912 (fax) jgibson@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. 30 Mishler, Nicholas F From:Bill Poland <bpoland@gibsoncommercial.com> Sent:Wednesday, April 22, 2015 8:51 AM To:Mishler, Nicholas F Cc:Jake Gibson Subject:Re: 580 Carmel - Bonds Hello Nick, Yes, the attached bonds were delivered to the engineering department (John Thomas & Caleb Warner) last week. Please let me know if you have any questions. Thank you! **PLEASE NOTICE OUR NEW ADDRESS BELOW! Bill Poland | Gibson Commercial Construction Vice-President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any da mage caused by any virus transmitted by this email. 31 From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Wednesday, April 22, 2015 at 8:21 AM To: Bill Poland < bpoland@gibsoncommercial.com > Cc: Jake Gibson < jgibson@gibsoncommercial.com > Subject: RE: 580 Carmel Did engineering receive the bonds they needed for this project? I think that is the last thing… Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Bill Poland [ mailto:bpoland@gibsoncommercial.com ] Sent: Tuesday, April 21, 2015 3:21 PM To: Mishler, Nicholas F Cc: Jake Gibson Subject: Re: 580 Carmel Hello Nick, The water and sewer connection fees were paid this afternoon…please see the attached receipt from Carmel Utilities. I believe this was the remaining item required for the permit to be issued so please let me know if there is any other item I am forgetting. Please let me know if you have any questions. Thank you! **PLEASE NOTICE OUR NEW ADDRESS BELOW! Bill Poland | Gibson Commercial Construction Vice-President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com 32 The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Monday, April 20, 2015 at 3:56 PM To: Bill Poland < bpoland@gibsoncommercial.com > Subject: 580 Carmel Bill- Have you received approval and made payment to the utilities office for the 580 Carmel project? I am trying to gather all of the information on where this project currently stands. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 33 Mishler, Nicholas F From:Bill Poland <bpoland@gibsoncommercial.com> Sent:Tuesday, April 21, 2015 3:21 PM To:Mishler, Nicholas F Cc:Jake Gibson Subject:Re: 580 Carmel Hello Nick, The water and sewer connection fees were paid this afternoon…please see the attached receipt from Carmel Utilities. I believe this was the remaining item required for the permit to be issued so please let me know if there is any other item I am forgetting. Please let me know if you have any questions. Thank you! **PLEASE NOTICE OUR NEW ADDRESS BELOW! Bill Poland | Gibson Commercial Construction Vice-President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any da mage caused by any virus transmitted by this email. 34 From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Monday, April 20, 2015 at 3:56 PM To: Bill Poland < bpoland@gibsoncommercial.com > Subject: 580 Carmel Bill- Have you received approval and made payment to the utilities office for the 580 Carmel project? I am trying to gather all of the information on where this project currently stands. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 35 Mishler, Nicholas F From:Kempa, Lisa L Sent:Tuesday, April 21, 2015 1:19 PM To:Duffy, John M; Spearman, Ted A; Peters, Jeff; Wolfe, Edward W; Mishler, Nicholas F; Barnes, David R; Cook, Steve L; Hollander, Greg H; Faucett, Joe W Subject:580 E Carmel Drive We have received water and sewer availability and connection fees for 580 E Carmel Dr. Water Connection $32604 Water Availability $4221.80 Sewer Connection $19200 Sewer Availability $2852.85 Review $150 Check NO. 2351 Lisa Kempa Carmel Utilities 30 West Main St., Ste 220 317/571-2443 36 Mishler, Nicholas F From:Kempa, Lisa L Sent:Monday, April 20, 2015 3:54 PM To:Mishler, Nicholas F Subject:RE: 580 Carmel No, not paid yet Lisa Kempa Carmel Utilities 30 West Main St., Ste 220 317/571-2443 From: Mishler, Nicholas F Sent: Monday, April 20, 2015 3:54 PM To: Kempa, Lisa L Subject: RE: 580 Carmel Lisa is this one OK to release now? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Kempa, Lisa L Sent: Wednesday, April 01, 2015 12:49 PM To: Mishler, Nicholas F Subject: RE: 580 Carmel nope Lisa Kempa Carmel Utilities 30 West Main St., Ste 220 317/571-2443 From: Mishler, Nicholas F Sent: Wednesday, April 01, 2015 12:49 PM To: Kempa, Lisa L Subject: RE: 580 Carmel Lisa, has this been paid? Thanks, Nick Mishler 37 Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Kempa, Lisa L Sent: Tuesday, March 17, 2015 9:17 AM To: Mishler, Nicholas F Subject: RE: 580 Carmel Nick we need the cover sheet and the pages showing water and sewer. Thanks. Lisa Kempa Carmel Utilities 30 West Main St., Ste 220 317/571-2443 From: Mishler, Nicholas F Sent: Tuesday, March 17, 2015 8:16 AM To: Kempa, Lisa L Cc: 'Bill Poland' Subject: FW: 580 Carmel John, see below Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Bill Poland [ mailto:bpoland@gibsoncommercial.com ] Sent: Monday, March 16, 2015 4:33 PM To: Mishler, Nicholas F Subject: Re: 580 Carmel Thanks Nick…Can you tell me if Lisa requires the Architectural, Civil, Plumbing or the entire drawing package? I want to make sure that I print what she needs and don’t waste printing what she doesn’t need. Thanks! Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) 38 bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caus ed by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Monday, March 16, 2015 at 11:43 AM To: Bill Poland < bpoland@gibsoncommercial.com > Subject: FW: 580 Carmel Bill, see below. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Kempa, Lisa L Sent: Monday, March 16, 2015 11:38 AM To: Mishler, Nicholas F Subject: RE: 580 Carmel Nick, can you please have them send 2 sets of updated paper plans. Thank you. Lisa Kempa Carmel Utilities 30 West Main St., Ste 220 317/571-2443 From: Mishler, Nicholas F Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com '; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov '; 'Hartman-ryan.hartman@ctrwd.org '; 'Trent.Godsey@duke-energy.com '; Jordan, Alex; Glaser, Fred J 39 Cc: 'Bill Poland' Subject: 580 Carmel Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 40 Mishler, Nicholas F From:Thomas, John G Sent:Thursday, April 16, 2015 2:38 PM To:'Bill Poland'; 'Brad Schoeff'; 'Brad Schoeff'; 'rcamp19032@aol.com'; Andrew Miller (MillerA@weihe.net) Cc:Jordan, Alex; Barnes, David R; Kashman, Jeremy M; Boone, Tiffany; Greskamp, Dan; Glaser, Fred J; Anderson, Kurt M; Hoover, Aaron; Mishler, Nicholas F; Conn, Angelina V; Greg Ilko (gilko@crossroadengineers.com); Greg Hoyes (Greg.Hoyes@hamiltoncounty.in.gov); Duffy, John M; Warner, Caleb Subject:City of Carmel Docket #13120023 DP Amend/ADLS Amend 580 Carmel - Approved Storm Water Permit Good afternoon, The approved storm water permit for the 580 Carmel Drive project is attached. Please contact Dan Greskamp (317-571- 2307 or dgreskamp@carmel.in.gov) to set up the pre-construction meeting. Please make sure you have acquired the right of way permit before the pre-con. Contact Fred Glaser (317-571-2677 or fglaser@carmel.in.gov) with any right of way permit questions. Please let me know if you have any questions and best of luck with the project. Sincerely, John Thomas, CPESC, CMS4S Storm Water Administrator City of Carmel Engineering Department (p) 317-571-2314 (f) 317-571-2439 41 Mishler, Nicholas F From:Bill Poland <bpoland@gibsoncommercial.com> Sent:Tuesday, April 14, 2015 8:08 AM To:Thomas, John G; Mishler, Nicholas F Cc:rcamp19032@aol.com; Jake Gibson; Mike Burger Subject:580 Carmel Drive - Required Bonds Hello John, I hope you enjoyed your week off. Attached please find scanned copies of the two (2) bonds required for the 580 Carmel Drive Project. These two bonds are in route to me and I hope to be able to deliver the originals to you in the next day or two. Are these scanned copies acceptable to allow us to schedule our pre-construction meeting with the city Inspectors and to allow Nick Mishler to process our building permit knowing the originals will be in your office shortly? Thank you for your consideration! Bill **PLEASE NOTICE OUR NEW ADDRESS BELOW! Bill Poland | Gibson Commercial Construction Vice-President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check 42 this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: <groundworksexc@embarqmail.com > Date: Tuesday, April 14, 2015 at 7:44 AM To: Bill Poland < bpoland@gibsoncommercial.com > Bill, Here are copies of the two bonds. Thanks, Scott Sent from Windows Mail 43 Mishler, Nicholas F From:Thomas, John G Sent:Thursday, April 02, 2015 4:56 PM To:'Bill Poland' Cc:Brad Schoeff; Paul Ewer; Jake Gibson; rcamp19032@aol.com; Mishler, Nicholas F Subject:RE: 580 Carmel Dr - Final Documents Required for Engineering Approval Hi Bill, Please see answers below in red. Sincerely, John Thomas, CPESC, CMS4S Storm Water Administrator City of Carmel Engineering Department (p) 317-571-2314 (f) 317-571-2439 From: Bill Poland [mailto:bpoland@gibsoncommercial.com] Sent: Thursday, April 02, 2015 9:09 AM To: Thomas, John G Cc: Brad Schoeff; Paul Ewer; Jake Gibson; rcamp19032@aol.com; Mishler, Nicholas F Subject: 580 Carmel Dr - Final Documents Required for Engineering Approval Hello John, As a follow up to our phone conversation yesterday, I wanted to update you on the status of the remaining items you are needing submitted before you leave for vacation (please see below). With these last items complete it is my hope we can receive final approval from the Engineering Department and can set up the Pre-Construction Meeting for next week. 1. Weihe Engineers is taking the O&M Manuals to the Hamilton County Recorders Office today to get them recorded…do you need notification when this is complete or will the Recorders Office contact you directly? They will place a recorded stamp on the manual. I need a copy of the recorded O&M for our records. 2. I am meeting with the owner today at 11:00AM to get the Stormwater Permit Application signed. I will drop that off at the Engineering Office this afternoon. Received. Thank you. 3. The “Stormwater Control Performance Bond” and the "Right of Way Bond” are being processed at this time and should be available to be delivered to your office in the next day or so. Thank you for the update. Please feel free to contact me if you have any additional comments or questions. Thank you again for your help in getting this process complete. Bill **PLEASE NOTICE OUR NEW ADDRESS BELOW! Bill Poland | Gibson Commercial Construction Vice-President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 44 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. 45 Mishler, Nicholas F From:Bill Poland <bpoland@gibsoncommercial.com> Sent:Thursday, April 02, 2015 9:09 AM To:Thomas, John G Cc:Brad Schoeff; Paul Ewer; Jake Gibson; rcamp19032@aol.com; Mishler, Nicholas F Subject:580 Carmel Dr - Final Documents Required for Engineering Approval Hello John, As a follow up to our phone conversation yesterday, I wanted to update you on the status of the remaining items you are needing submitted before you leave for vacation (please see below). With these last items complete it is my hope we can receive final approval from the Engineering Department and can set up the Pre-Construction Meeting for next week. 1. Weihe Engineers is taking the O&M Manuals to the Hamilton County Recorders Office today to get them recorded…do you need notification when this is complete or will the Recorders Office contact you directly? 2. I am meeting with the owner today at 11:00AM to get the Stormwater Permit Application signed. I will drop that off at the Engineering Office this afternoon. 3. The “Stormwater Control Performance Bond” and the "Right of Way Bond” are being processed at this time and should be available to be delivered to your office in the next day or so. Please feel free to contact me if you have any additional comments or questions. Thank you again for your help in getting this process complete. Bill **PLEASE NOTICE OUR NEW ADDRESS BELOW! Bill Poland | Gibson Commercial Construction Vice-President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. 46 Mishler, Nicholas F From:Bill Poland <bpoland@gibsoncommercial.com> Sent:Wednesday, April 01, 2015 3:12 PM To:Mishler, Nicholas F Subject:Re: Water/Sewer Thank you Nick! The owner just returned to town so I will let him know that he needs to get the water and sewer fees paid. **PLEASE NOTICE OUR NEW ADDRESS BELOW! Bill Poland | Gibson Commercial Construction Vice-President 3024 Ridgeview Drive | Indianapolis, Indiana 46226 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any at tachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Wednesday, April 1, 2015 at 12:50 PM 47 To: Bill Poland < bpoland@gibsoncommercial.com > Subject: Water/Sewer Bill, it looks like your water & sewer fees would need to be paid as well, along with the engineering requirements we talked about. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 48 Mishler, Nicholas F From:Kempa, Lisa L Sent:Wednesday, April 01, 2015 12:49 PM To:Mishler, Nicholas F Subject:RE: 580 Carmel nope Lisa Kempa Carmel Utilities 30 West Main St., Ste 220 317/571-2443 From: Mishler, Nicholas F Sent: Wednesday, April 01, 2015 12:49 PM To: Kempa, Lisa L Subject: RE: 580 Carmel Lisa, has this been paid? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Kempa, Lisa L Sent: Tuesday, March 17, 2015 9:17 AM To: Mishler, Nicholas F Subject: RE: 580 Carmel Nick we need the cover sheet and the pages showing water and sewer. Thanks. Lisa Kempa Carmel Utilities 30 West Main St., Ste 220 317/571-2443 From: Mishler, Nicholas F Sent: Tuesday, March 17, 2015 8:16 AM To: Kempa, Lisa L Cc: 'Bill Poland' Subject: FW: 580 Carmel John, see below Thanks, 49 Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Bill Poland [ mailto:bpoland@gibsoncommercial.com ] Sent: Monday, March 16, 2015 4:33 PM To: Mishler, Nicholas F Subject: Re: 580 Carmel Thanks Nick…Can you tell me if Lisa requires the Architectural, Civil, Plumbing or the entire drawing package? I want to make sure that I print what she needs and don’t waste printing what she doesn’t need. Thanks! Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caus ed by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Monday, March 16, 2015 at 11:43 AM To: Bill Poland < bpoland@gibsoncommercial.com > Subject: FW: 580 Carmel 50 Bill, see below. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Kempa, Lisa L Sent: Monday, March 16, 2015 11:38 AM To: Mishler, Nicholas F Subject: RE: 580 Carmel Nick, can you please have them send 2 sets of updated paper plans. Thank you. Lisa Kempa Carmel Utilities 30 West Main St., Ste 220 317/571-2443 From: Mishler, Nicholas F Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com '; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov '; 'Hartman-ryan.hartman@ctrwd.org '; 'Trent.Godsey@duke-energy.com '; Jordan, Alex; Glaser, Fred J Cc: 'Bill Poland' Subject: 580 Carmel Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 51 Mishler, Nicholas F From:Barnes, David R Sent:Monday, March 30, 2015 12:33 PM To:Mishler, Nicholas F; Thomas, John G; Jordan, Alex; Glaser, Fred J Subject:RE: 580 Carmel Nick, I have no performance bonding in place for this project yet. From: Mishler, Nicholas F Sent: Monday, March 30, 2015 12:10 PM To: Thomas, John G; Jordan, Alex; Barnes, David R; Glaser, Fred J Subject: 580 Carmel Do you guys have what you need for me to release the office building @ 580 E Carmel Dr.? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 52 Mishler, Nicholas F From:Ellison, Christopher M Sent:Monday, March 30, 2015 12:01 PM To:Mishler, Nicholas F Cc:Walker, Katie A Subject:FW: 580 E Carmel Drive I have received the needed info on the project from the general contractor and it is now cleared for permitting. Thanks, Chris Ellison CFD From: Ellison, Christopher M Sent: Thursday, March 26, 2015 7:21 AM To: Mishler, Nicholas F Subject: 580 E Carmel Drive FYI, My review for this building is delayed. I am still waiting on information for this building from the architect of record. I can’t get my review done until I received the information from them. Capt. Chris Ellison Deputy Fire Marshal Carmel Fire Department 2 Civic Square, Carmel IN 46032 317-571-2600 Headquarters 317-571-2674 Fax cellison@carmel.in.gov The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. CONFIDENTIALITY NOTICE: This transmission (including any attachments) may contain information which is confidential, attorney work-product and/or subject to the attorney-client privilege, and is intended solely for the receipient(s) named above. If you are not a named recipient, any interception, copying, distribution, disclosure or use of this transmission or any information contained in it is strictly prohibited, and may be subject to criminal and civil penalties under State or Federal law. If you have received this transmission in error, please immediately call us at (317) 571-2600, delete the 53 transmission from all forms of electronic or other storage, and destroy all hard copies. DO NOT forward this transmission. Any error in addressing or sending this e-mail is not a waiver of confidentiality or privilege and does not waive consent to copying or distribution of this e-mail or attachments. Thank You. 54 Mishler, Nicholas F From:Bill Poland <bpoland@gibsoncommercial.com> Sent:Friday, March 27, 2015 7:56 AM To:Mishler, Nicholas F Cc:Paul Ewer; Jake Gibson; Mike Burger Subject:FW: 580 Carmel Drive - Stair Variance Documentation Hello Nick, I was able to get a copy of the actual variance approval document provided by the State from the owner (see attached). Sorry for the delay in getting this to you…I had to search through some of his files to find it. This e-mail is a follow up to the e-mail that I sent you yesterday (see below). Please do not hesitate to contact me if you have any questions. Thank you! Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: Bill Poland < bpoland@gibsoncommercial.com > Date: Thursday, March 26, 2015 at 11:38 AM To: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Subject: 580 Carmel Drive - Stair Variance Documentation Hello Nick, The front stair of the 580 Carmel Drive project previously went through a variance approval process with the State of Indiana. Those approval letters are attached for your files. Please let me know if you have any questions or comments. 55 Thanks! Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. 56 Mishler, Nicholas F From:Bill Poland <bpoland@gibsoncommercial.com> Sent:Thursday, March 26, 2015 11:39 AM To:Mishler, Nicholas F Subject:580 Carmel Drive - Stair Variance Documentation Hello Nick, The front stair of the 580 Carmel Drive project previously went through a variance approval process with the State of Indiana. Those approval letters are attached for your files. Please let me know if you have any questions or comments. Thanks! Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to wh ich they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. 57 Mishler, Nicholas F From:Ellison, Christopher M Sent:Thursday, March 26, 2015 7:21 AM To:Mishler, Nicholas F Subject:580 E Carmel Drive FYI, My review for this building is delayed. I am still waiting on information for this building from the architect of record. I can’t get my review done until I received the information from them. Capt. Chris Ellison Deputy Fire Marshal Carmel Fire Department 2 Civic Square, Carmel IN 46032 317-571-2600 Headquarters 317-571-2674 Fax cellison@carmel.in.gov The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. CONFIDENTIALITY NOTICE: This transmission (including any attachments) may contain information which is confidential, attorney work-product and/or subject to the attorney-client privilege, and is intended solely for the receipient(s) named above. If you are not a named recipient, any interception, copying, distribution, disclosure or use of this transmission or any information contained in it is strictly prohibited, and may be subject to criminal and civil penalties under State or Federal law. If you have received this transmission in error, please immediately call us at (317) 571-2600, delete the transmission from all forms of electronic or other storage, and destroy all hard copies. DO NOT forward this transmission. Any error in addressing or sending this e-mail is not a waiver of confidentiality or privilege and does not waive consent to copying or distribution of this e-mail or attachments. Thank You. 58 Mishler, Nicholas F From:Bill Poland <bpoland@gibsoncommercial.com> Sent:Monday, March 23, 2015 3:17 PM To:Conn, Angelina V; Mishler, Nicholas F; Motz, Lisa Cc:Lux, Pamela K Subject:Re: 580 Carmel (docket no 13120023 DP Amend/ADLS Amend) Thank you Angie!! Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any da mage caused by any virus transmitted by this email. From: "Conn, Angelina V" < Aconn@carmel.in.gov > Date: Monday, March 23, 2015 at 12:45 PM To: "Mishler, Nicholas F" < nmishler@carmel.in.gov >, Bill Poland < bpoland@gibsoncommercial.com >, "Motz, Lisa" <lmotz@carmel.in.gov > Cc: "Lux, Pamela K" < plux@carmel.in.gov > Subject: RE: 580 Carmel (docket no 13120023 DP Amend/ADLS Amend) Good afternoon, Nick and Bill – 59 Attached are the stamped/approved site plan and building elevations. The Planning/Zoning Dept. is comfortable with the builder moving through the building permits process. (Lisa – please add these two items to laser fiche. ( 580 Carmel in Laser Fiche: http://cocdocs.carmel.in.gov/weblink/0/fol/987489/Row1.aspx.) Thank you. ) Sincerely, Angie Conn, AICP | Planning Administrator City of Carmel Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 O: 317-571-2417 | Direct: 317-571-2281 | F: 317-571-2426 | W: www.carmeldocs.com From: Mishler, Nicholas F Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com '; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov '; 'Hartman-ryan.hartman@ctrwd.org '; 'Trent.Godsey@duke-energy.com '; Jordan, Alex; Glaser, Fred J Cc: 'Bill Poland' Subject: 580 Carmel (13120023 DP Amend/ADLS Amend) Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 60 Mishler, Nicholas F From:Conn, Angelina V Sent:Monday, March 23, 2015 12:46 PM To:Mishler, Nicholas F; 'Bill Poland'; Motz, Lisa Cc:Lux, Pamela K Subject:RE: 580 Carmel (docket no 13120023 DP Amend/ADLS Amend) Good afternoon, Nick and Bill – Attached are the stamped/approved site plan and building elevations. The Planning/Zoning Dept. is comfortable with the builder moving through the building permits process. (Lisa – please add these two items to laser fiche. ( 580 Carmel in Laser Fiche: http://cocdocs.carmel.in.gov/weblink/0/fol/987489/Row1.aspx.) Thank you. ) Sincerely, Angie Conn, AICP | Planning Administrator City of Carmel Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 O: 317-571-2417 | Direct: 317-571-2281 | F: 317-571-2426 | W: www.carmeldocs.com From: Mishler, Nicholas F Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com'; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov'; 'Hartman-ryan.hartman@ctrwd.org'; 'Trent.Godsey@duke-energy.com'; Jordan, Alex; Glaser, Fred J Cc: 'Bill Poland' Subject: 580 Carmel (13120023 DP Amend/ADLS Amend) Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 61 Mishler, Nicholas F From:Bill Poland <bpoland@gibsoncommercial.com> Sent:Thursday, March 19, 2015 10:39 AM To:Clark, Joanne L.; Mishler, Nicholas F Cc:Rick Cambell Subject:580 Carmel - Natural Gas Service Thank you Joanne! The project will be served with natural gas so we’ll need to get that application going soon. The project is expected to break ground in early April with a late November delivery. Please do not hesitate to contact me with any questions or additional information. Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any da mage caused by any virus transmitted by this email. From: "Clark, Joanne L." < jlclark@Vectren.com > Date: Wednesday, March 18, 2015 at 11:45 AM To: "Mishler, Nicholas F" < nmishler@carmel.in.gov > 62 Cc: Bill Poland < bpoland@gibsoncommercial.com > Subject: RE: 580 Carmel Vectren should not need anything for you to release the perm it. If they want natural gas to their building they would just need to call in a service request to our new business department 800-227-1376 option # 6. Thank you, Joanie Clark From: Mishler, Nicholas F [ mailto:nmishler@carmel.in.gov ] Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com '; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov '; 'Hartman-ryan.hartman@ctrwd.org '; 'Trent.Godsey@duke-energy.com '; Jordan, Alex; Glaser, Fred J Cc: 'Bill Poland' Subject: 580 Carmel This EXTERNAL email contains an attachment. Do not open attachments or click on links in emails unless you are certain the source AND content of the email are credible. Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email This message (including any attachments) is intended only for the use of the individual or entity to which it is addressed and may contain information that is non-public, proprietary, privileged, confidential, and exempt from disclosure under applicable law or may constitute as attorney work product. If you are not the intended recipient, you are hereby notified that any use, dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, notify us immediately by telephone and (i) destroy this message if a facsimile or (ii) delete this message immediately if this is an electronic communication. Thank you. 63 Mishler, Nicholas F From:Clark, Joanne L. <jlclark@Vectren.com> Sent:Wednesday, March 18, 2015 11:45 AM To:Mishler, Nicholas F Cc:'Bill Poland' Subject:RE: 580 Carmel Vectren should not need anything for you to release the permit. If they want natural gas to their building they would just need to call in a service request to our new business department 800-227-1376 option # 6. Thank you, Joanie Clark From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com'; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov'; 'Hartman-ryan.hartman@ctrwd.org'; 'Trent.Godsey@duke-energy.com'; Jordan, Alex; Glaser, Fred J Cc: 'Bill Poland' Subject: 580 Carmel This EXTERNAL email contains an attachment. Do not open attachments or click on links in emails unless you are certain the source AND content of the email are credible. Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email This message (including any attachments) is intended only for the use of the individual or entity to which it is addressed and may contain information that is non-public, proprietary, privileged, confidential, and exempt from disclosure under applicable law or may constitute as attorney work product. If you are not the intended recipient, you are hereby notified that any use, dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, notify us immediately by telephone and (i) destroy this message if a facsimile or (ii) delete this message immediately if this is an electronic communication. Thank you. 64 Mishler, Nicholas F From:Bill Poland <bpoland@gibsoncommercial.com> Sent:Tuesday, March 17, 2015 9:30 PM To:Mishler, Nicholas F Subject:Re: 580 Carmel Thank you Nick!! Sent from my iPhone On Mar 17, 2015, at 3:22 PM, "Mishler, Nicholas F" < nmishler@carmel.in.gov > wrote: These would need to go directly to Carmel Utilities. 30 W. Main St. #220. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Bill Poland [ mailto:bpoland@gibsoncommercial.com ] Sent: Tuesday, March 17, 2015 11:18 AM To: Mishler, Nicholas F Subject: Re: 580 Carmel Thanks Nick…I’ll get these sheets printed and deliver them up to you. Do I take them to you or Lisa directly? Thanks! Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com <image001.png> 65 This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Tuesday, March 17, 2015 at 9:29 AM To: Bill Poland < bpoland@gibsoncommercial.com > Subject: FW: 580 Carmel Bill, see below. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Kempa, Lisa L Sent: Tuesday, March 17, 2015 9:17 AM To: Mishler, Nicholas F Subject: RE: 580 Carmel Nick we need the cover sheet and the pages showing water and sewer. Thanks. Lisa Kempa Carmel Utilities 30 West Main St., Ste 220 317/571-2443 From: Mishler, Nicholas F Sent: Tuesday, March 17, 2015 8:16 AM To: Kempa, Lisa L Cc: 'Bill Poland' Subject: FW: 580 Carmel John, see below Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 66 From: Bill Poland [ mailto:bpoland@gibsoncommercial.com ] Sent: Monday, March 16, 2015 4:33 PM To: Mishler, Nicholas F Subject: Re: 580 Carmel Thanks Nick…Can you tell me if Lisa requires the Architectural, Civil, Plumbing or the entire drawing package? I want to make sure that I print what she needs and don’t waste printing what she doesn’t need. Thanks! Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com <image001.png> This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Monday, March 16, 2015 at 11:43 AM To: Bill Poland < bpoland@gibsoncommercial.com > Subject: FW: 580 Carmel Bill, see below. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 67 From: Kempa, Lisa L Sent: Monday, March 16, 2015 11:38 AM To: Mishler, Nicholas F Subject: RE: 580 Carmel Nick, can you please have them send 2 sets of updated paper plans. Thank you. Lisa Kempa Carmel Utilities 30 West Main St., Ste 220 317/571-2443 From: Mishler, Nicholas F Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com '; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov '; 'Hartman-ryan.hartman@ctrwd.org '; 'Trent.Godsey@duke- energy.com '; Jordan, Alex; Glaser, Fred J Cc: 'Bill Poland' Subject: 580 Carmel Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 68 Mishler, Nicholas F From:Bill Poland <bpoland@gibsoncommercial.com> Sent:Tuesday, March 17, 2015 11:18 AM To:Mishler, Nicholas F Subject:Re: 580 Carmel Thanks Nick…I’ll get these sheets printed and deliver them up to you. Do I take them to you or Lisa directly? Thanks! Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any at tachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Tuesday, March 17, 2015 at 9:29 AM To: Bill Poland < bpoland@gibsoncommercial.com > Subject: FW: 580 Carmel Bill, see below. 69 Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Kempa, Lisa L Sent: Tuesday, March 17, 2015 9:17 AM To: Mishler, Nicholas F Subject: RE: 580 Carmel Nick we need the cover sheet and the pages showing water and sewer. Thanks. Lisa Kempa Carmel Utilities 30 West Main St., Ste 220 317/571-2443 From: Mishler, Nicholas F Sent: Tuesday, March 17, 2015 8:16 AM To: Kempa, Lisa L Cc: 'Bill Poland' Subject: FW: 580 Carmel John, see below Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Bill Poland [ mailto:bpoland@gibsoncommercial.com ] Sent: Monday, March 16, 2015 4:33 PM To: Mishler, Nicholas F Subject: Re: 580 Carmel Thanks Nick…Can you tell me if Lisa requires the Architectural, Civil, Plumbing or the entire drawing package? I want to make sure that I print what she needs and don’t waste printing what she doesn’t need. Thanks! Bill Poland | Gibson Commercial Construction Vice-President 70 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caus ed by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Monday, March 16, 2015 at 11:43 AM To: Bill Poland < bpoland@gibsoncommercial.com > Subject: FW: 580 Carmel Bill, see below. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Kempa, Lisa L Sent: Monday, March 16, 2015 11:38 AM To: Mishler, Nicholas F Subject: RE: 580 Carmel Nick, can you please have them send 2 sets of updated paper plans. Thank you. Lisa Kempa Carmel Utilities 30 West Main St., Ste 220 317/571-2443 From: Mishler, Nicholas F Sent: Monday, March 16, 2015 10:44 AM 71 To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com '; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov '; 'Hartman-ryan.hartman@ctrwd.org '; 'Trent.Godsey@duke-energy.com '; Jordan, Alex; Glaser, Fred J Cc: 'Bill Poland' Subject: 580 Carmel Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 72 Mishler, Nicholas F From:Bill Poland <bpoland@gibsoncommercial.com> Sent:Tuesday, March 17, 2015 10:12 AM To:Conn, Angelina V Cc:Keesling, Rachel M; Lux, Pamela K; Hollibaugh, Mike P; Mishler, Nicholas F Subject:Re: 580 Carmel Thank you Angie!! Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any da mage caused by any virus transmitted by this email. From: "Conn, Angelina V" < Aconn@carmel.in.gov > Date: Tuesday, March 17, 2015 at 10:04 AM To: Bill Poland < bpoland@gibsoncommercial.com > Cc: "Keesling, Rachel M" < rkeesling@carmel.in.gov >, "Lux, Pamela K" < plux@carmel.in.gov >, "Hollibaugh, Mike P" <MHollibaugh@carmel.in.gov >, "Mishler, Nicholas F" < nmishler@carmel.in.gov > Subject: RE: 580 Carmel Thank you, Bill. 73 I will look these over later today and will let you know when we stamp/approve these for the Building Permit process, or if we have any additional comments or questions. Angie Conn, AICP | Planning Administrator City of Carmel Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 O: 317-571-2417 | Direct: 317-571-2281 | F: 317-571-2426 | W: www.carmeldocs.com From: Bill Poland [ mailto:bpoland@gibsoncommercial.com ] Sent: Monday, March 16, 2015 4:29 PM To: Conn, Angelina V; Mishler, Nicholas F Cc: Keesling, Rachel M; Lux, Pamela K Subject: Re: 580 Carmel Hello Angela, I have provided below a link to the dropbox containing “.pdf” files for the 580 Carmel Drive Project. The site plan you have requested is on sheet C200 of the “2 Civil.pdf” and the exterior elevations are on sheets A3.1 and A3.2 of the “4 Architectural.pdf”. https://www.dropbox.com/sh/fnrr8akr2e8h8tz/AACqvLp68HX_rOJUFoKuzrx2a?dl=0 Please do not hesitate to contact me if you have any questions or have difficulty with this link. Thank you! Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. 74 From: "Conn, Angelina V" < Aconn@carmel.in.gov > Date: Monday, March 16, 2015 at 11:40 AM To: "Mishler, Nicholas F" < nmishler@carmel.in.gov >, Bill Poland < bpoland@gibsoncommercial.com > Cc: "Keesling, Rachel M" < rkeesling@carmel.in.gov >, "Lux, Pamela K" < plux@carmel.in.gov > Subject: RE: 580 Carmel Hi, Nick (and Bill) – Please have the builder email me .pdf’s of the proposed site plan and the exterior architectural building elevations . We need to make sure that what they propose to build is what was approved by the Plan Commission ( Docket No. 13120023 DP Amend/ADLS Amend ). Please also view the Conditions of that Approval here, in the Plan Commission Letter of Grant: http://cocdocs.carmel.in.gov/weblink/0/doc/1081502/Page1.aspx , regarding vehicular access to the Carmel Market place site and the AAA Way street extension. Thank you, Angie Conn, AICP | Planning Administrator City of Carmel Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 O: 317-571-2417 | Direct: 317-571-2281 | F: 317-571-2426 | W: www.carmeldocs.com From: Mishler, Nicholas F Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com '; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov '; 'Hartman-ryan.hartman@ctrwd.org '; 'Trent.Godsey@duke-energy.com '; Jordan, Alex; Glaser, Fred J Cc: 'Bill Poland' Subject: 580 Carmel Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 75 Mishler, Nicholas F From:Conn, Angelina V Sent:Tuesday, March 17, 2015 10:04 AM To:'Bill Poland' Cc:Keesling, Rachel M; Lux, Pamela K; Hollibaugh, Mike P; Mishler, Nicholas F Subject:RE: 580 Carmel Thank you, Bill. I will look these over later today and will let you know when we stamp/approve these for the Building Permit process, or if we have any additional comments or questions. Angie Conn, AICP | Planning Administrator City of Carmel Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 O: 317-571-2417 | Direct: 317-571-2281 | F: 317-571-2426 | W: www.carmeldocs.com From: Bill Poland [mailto:bpoland@gibsoncommercial.com] Sent: Monday, March 16, 2015 4:29 PM To: Conn, Angelina V; Mishler, Nicholas F Cc: Keesling, Rachel M; Lux, Pamela K Subject: Re: 580 Carmel Hello Angela, I have provided below a link to the dropbox containing “.pdf” files for the 580 Carmel Drive Project. The site plan you have requested is on sheet C200 of the “2 Civil.pdf” and the exterior elevations are on sheets A3.1 and A3.2 of the “4 Architectural.pdf”. https://www.dropbox.com/sh/fnrr8akr2e8h8tz/AACqvLp68HX_rOJUFoKuzrx2a?dl=0 Please do not hesitate to contact me if you have any questions or have difficulty with this link. Thank you! Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com 76 The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Conn, Angelina V" < Aconn@carmel.in.gov > Date: Monday, March 16, 2015 at 11:40 AM To: "Mishler, Nicholas F" < nmishler@carmel.in.gov >, Bill Poland < bpoland@gibsoncommercial.com > Cc: "Keesling, Rachel M" < rkeesling@carmel.in.gov >, "Lux, Pamela K" < plux@carmel.in.gov > Subject: RE: 580 Carmel Hi, Nick (and Bill) – Please have the builder email me .pdf’s of the proposed site plan and the exterior architectural building elevations . We need to make sure that what they propose to build is what was approved by the Plan Commission ( Docket No. 13120023 DP Amend/ADLS Amend ). Please also view the Conditions of that Approval here, in the Plan Commission Letter of Grant: http://cocdocs.carmel.in.gov/weblink/0/doc/1081502/Page1.aspx , regarding vehicular access to the Carmel Market place site and the AAA Way street extension. Thank you, Angie Conn, AICP | Planning Administrator City of Carmel Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 O: 317-571-2417 | Direct: 317-571-2281 | F: 317-571-2426 | W: www.carmeldocs.com From: Mishler, Nicholas F Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com '; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov '; 'Hartman-ryan.hartman@ctrwd.org '; 'Trent.Godsey@duke-energy.com '; Jordan, Alex; Glaser, Fred J Cc: 'Bill Poland' Subject: 580 Carmel Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, 77 Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 78 Mishler, Nicholas F From:Kempa, Lisa L Sent:Tuesday, March 17, 2015 9:17 AM To:Mishler, Nicholas F Subject:RE: 580 Carmel Nick we need the cover sheet and the pages showing water and sewer. Thanks. Lisa Kempa Carmel Utilities 30 West Main St., Ste 220 317/571-2443 From: Mishler, Nicholas F Sent: Tuesday, March 17, 2015 8:16 AM To: Kempa, Lisa L Cc: 'Bill Poland' Subject: FW: 580 Carmel John, see below Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Bill Poland [ mailto:bpoland@gibsoncommercial.com ] Sent: Monday, March 16, 2015 4:33 PM To: Mishler, Nicholas F Subject: Re: 580 Carmel Thanks Nick…Can you tell me if Lisa requires the Architectural, Civil, Plumbing or the entire drawing package? I want to make sure that I print what she needs and don’t waste printing what she doesn’t need. Thanks! Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) 79 bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachmen ts for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Monday, March 16, 2015 at 11:43 AM To: Bill Poland < bpoland@gibsoncommercial.com > Subject: FW: 580 Carmel Bill, see below. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Kempa, Lisa L Sent: Monday, March 16, 2015 11:38 AM To: Mishler, Nicholas F Subject: RE: 580 Carmel Nick, can you please have them send 2 sets of updated paper plans. Thank you. Lisa Kempa Carmel Utilities 30 West Main St., Ste 220 317/571-2443 From: Mishler, Nicholas F Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com '; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov '; 'Hartman-ryan.hartman@ctrwd.org '; 'Trent.Godsey@duke-energy.com '; Jordan, Alex; Glaser, Fred J 80 Cc: 'Bill Poland' Subject: 580 Carmel Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 81 Mishler, Nicholas F From:Bill Poland <bpoland@gibsoncommercial.com> Sent:Monday, March 16, 2015 4:33 PM To:Mishler, Nicholas F Subject:Re: 580 Carmel Thanks Nick…Can you tell me if Lisa requires the Architectural, Civil, Plumbing or the entire drawing package? I want to make sure that I print what she needs and don’t waste printing what she doesn’t need. Thanks! Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any da mage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Monday, March 16, 2015 at 11:43 AM To: Bill Poland < bpoland@gibsoncommercial.com > Subject: FW: 580 Carmel Bill, see below. 82 Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Kempa, Lisa L Sent: Monday, March 16, 2015 11:38 AM To: Mishler, Nicholas F Subject: RE: 580 Carmel Nick, can you please have them send 2 sets of updated paper plans. Thank you. Lisa Kempa Carmel Utilities 30 West Main St., Ste 220 317/571-2443 From: Mishler, Nicholas F Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com '; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov '; 'Hartman-ryan.hartman@ctrwd.org '; 'Trent.Godsey@duke-energy.com '; Jordan, Alex; Glaser, Fred J Cc: 'Bill Poland' Subject: 580 Carmel Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 83 Mishler, Nicholas F From:Bill Poland <bpoland@gibsoncommercial.com> Sent:Monday, March 16, 2015 4:29 PM To:Conn, Angelina V; Mishler, Nicholas F Cc:Keesling, Rachel M; Lux, Pamela K Subject:Re: 580 Carmel Hello Angela, I have provided below a link to the dropbox containing “.pdf” files for the 580 Carmel Drive Project. The site plan you have requested is on sheet C200 of the “2 Civil.pdf” and the exterior elevations are on sheets A3.1 and A3.2 of the “4 Architectural.pdf”. https://www.dropbox.com/sh/fnrr8akr2e8h8tz/AACqvLp68HX_rOJUFoKuzrx2a?dl=0 Please do not hesitate to contact me if you have any questions or have difficulty with this link. Thank you! Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. 84 From: "Conn, Angelina V" < Aconn@carmel.in.gov > Date: Monday, March 16, 2015 at 11:40 AM To: "Mishler, Nicholas F" < nmishler@carmel.in.gov >, Bill Poland < bpoland@gibsoncommercial.com > Cc: "Keesling, Rachel M" < rkeesling@carmel.in.gov >, "Lux, Pamela K" < plux@carmel.in.gov > Subject: RE: 580 Carmel Hi, Nick (and Bill) – Please have the builder email me .pdf’s of the proposed site plan and the exterior architectural building elevations . We need to make sure that what they propose to build is what was approved by the Plan Commission ( Docket No. 13120023 DP Amend/ADLS Amend ). Please also view the Conditions of that Approval here, in the Plan Commission Letter of Grant: http://cocdocs.carmel.in.gov/weblink/0/doc/1081502/Page1.aspx , regarding vehicular access to the Carmel Market place site and the AAA Way street extension. Thank you, Angie Conn, AICP | Planning Administrator City of Carmel Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 O: 317-571-2417 | Direct: 317-571-2281 | F: 317-571-2426 | W: www.carmeldocs.com From: Mishler, Nicholas F Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com '; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov '; 'Hartman-ryan.hartman@ctrwd.org '; 'Trent.Godsey@duke-energy.com '; Jordan, Alex; Glaser, Fred J Cc: 'Bill Poland' Subject: 580 Carmel Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 85 Mishler, Nicholas F From:Bill Poland <bpoland@gibsoncommercial.com> Sent:Monday, March 16, 2015 4:10 PM To:Duffy, John M Cc:Mishler, Nicholas F; Kempa, Lisa L Subject:Re: 580 Carmel Thank you Mr. Duffy…I will forward these along to our owner. Regards, Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any da mage caused by any virus transmitted by this email. From: "Duffy, John M" < JDuffy@carmel.in.gov > Date: Monday, March 16, 2015 at 3:30 PM To: Bill Poland < bpoland@gibsoncommercial.com > Cc: "Mishler, Nicholas F" < nmishler@carmel.in.gov >, "Kempa, Lisa L" < LKempa@carmel.in.gov > Subject: FW: 580 Carmel 86 Mr. Poland, Attached please find the water and sanitary sewer fee sheets for this project. Please let me know if these need to be sent to another party, and please feel free to call with any questions. Thank you. J Duffy EDU stands for equivalent dwelling unit and represents 9,00 gallons per month From: Duffy, John M Sent: Monday, March 16, 2015 11:47 AM To: Mishler, Nicholas F; Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com '; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov '; 'Hartman-ryan.hartman@ctrwd.org '; 'Trent.Godsey@duke-energy.com '; Jordan, Alex; Glaser, Fred J; Peters, Jeff; Cook, Steve L; Wolfe, Edward W; Faucett, Joe W Cc: 'Bill Poland' Subject: RE: 580 Carmel Carmel Utilities will need two sets of the Civil plans showing how the building will be served with water and sanitary sewer. Prior to obtaining a building permit the water and sanitary connection/availability fees will need to be paid. A follow up email will be sent shortly on the fee amounts. The plans should be sent to; Carmel Utilities 30 W Main Street Carmel, IN 46032 Thank you. John Duffy Director of Utilities From: Mishler, Nicholas F Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com '; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov '; 'Hartman-ryan.hartman@ctrwd.org '; 'Trent.Godsey@duke-energy.com '; Jordan, Alex; Glaser, Fred J Cc: 'Bill Poland' Subject: 580 Carmel Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 87 Please consider the environment before printing this email 88 Mishler, Nicholas F From:Duffy, John M Sent:Monday, March 16, 2015 3:30 PM To:'Bill Poland' Cc:Mishler, Nicholas F; Kempa, Lisa L Subject:FW: 580 Carmel Mr. Poland, Attached please find the water and sanitary sewer fee sheets for this project. Please let me know if these need to be sent to another party, and please feel free to call with any questions. Thank you. J Duffy EDU stands for equivalent dwelling unit and represents 9,00 gallons per month From: Duffy, John M Sent: Monday, March 16, 2015 11:47 AM To: Mishler, Nicholas F; Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com'; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov'; 'Hartman-ryan.hartman@ctrwd.org'; 'Trent.Godsey@duke-energy.com'; Jordan, Alex; Glaser, Fred J; Peters, Jeff; Cook, Steve L; Wolfe, Edward W; Faucett, Joe W Cc: 'Bill Poland' Subject: RE: 580 Carmel Carmel Utilities will need two sets of the Civil plans showing how the building will be served with water and sanitary sewer. Prior to obtaining a building permit the water and sanitary connection/availability fees will need to be paid. A follow up email will be sent shortly on the fee amounts. The plans should be sent to; Carmel Utilities 30 W Main Street Carmel, IN 46032 Thank you. John Duffy Director of Utilities From: Mishler, Nicholas F Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com'; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov'; 'Hartman-ryan.hartman@ctrwd.org'; 'Trent.Godsey@duke-energy.com'; Jordan, Alex; Glaser, Fred J Cc: 'Bill Poland' Subject: 580 Carmel Good morning- 89 I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 90 Mishler, Nicholas F From:Duffy, John M Sent:Monday, March 16, 2015 2:12 PM To:Mishler, Nicholas F Subject:RE: 580 Carmel Nick, Can you send me Bill Poland’s email adress? Thanks J Duffy From: Mishler, Nicholas F Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com'; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov'; 'Hartman-ryan.hartman@ctrwd.org'; 'Trent.Godsey@duke-energy.com'; Jordan, Alex; Glaser, Fred J Cc: 'Bill Poland' Subject: 580 Carmel Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 91 Mishler, Nicholas F From:Duffy, John M Sent:Monday, March 16, 2015 11:47 AM To:Mishler, Nicholas F; Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com'; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov'; 'Hartman- ryan.hartman@ctrwd.org'; 'Trent.Godsey@duke-energy.com'; Jordan, Alex; Glaser, Fred J; Peters, Jeff; Cook, Steve L; Wolfe, Edward W; Faucett, Joe W Cc:'Bill Poland' Subject:RE: 580 Carmel Carmel Utilities will need two sets of the Civil plans showing how the building will be served with water and sanitary sewer. Prior to obtaining a building permit the water and sanitary connection/availability fees will need to be paid. A follow up email will be sent shortly on the fee amounts. The plans should be sent to; Carmel Utilities 30 W Main Street Carmel, IN 46032 Thank you. John Duffy Director of Utilities From: Mishler, Nicholas F Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com'; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov'; 'Hartman-ryan.hartman@ctrwd.org'; 'Trent.Godsey@duke-energy.com'; Jordan, Alex; Glaser, Fred J Cc: 'Bill Poland' Subject: 580 Carmel Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 92 Mishler, Nicholas F From:Conn, Angelina V Sent:Monday, March 16, 2015 11:41 AM To:Mishler, Nicholas F; 'Bill Poland' Cc:Keesling, Rachel M; Lux, Pamela K Subject:RE: 580 Carmel Hi, Nick (and Bill) – Please have the builder email me .pdf’s of the proposed site plan and the exterior architectural building elevations . We need to make sure that what they propose to build is what was approved by the Plan Commission ( Docket No. 13120023 DP Amend/ADLS Amend ). Please also view the Conditions of that Approval here, in the Plan Commission Letter of Grant: http://cocdocs.carmel.in.gov/weblink/0/doc/1081502/Page1.aspx , regarding vehicular access to the Carmel Market place site and the AAA Way street extension. Thank you, Angie Conn, AICP | Planning Administrator City of Carmel Dept. of Community Services 1 Civic Square, 3rd Flr., Carmel, IN 46032 O: 317-571-2417 | Direct: 317-571-2281 | F: 317-571-2426 | W: www.carmeldocs.com From: Mishler, Nicholas F Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com'; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov'; 'Hartman-ryan.hartman@ctrwd.org'; 'Trent.Godsey@duke-energy.com'; Jordan, Alex; Glaser, Fred J Cc: 'Bill Poland' Subject: 580 Carmel Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 93 Mishler, Nicholas F From:Kempa, Lisa L Sent:Monday, March 16, 2015 11:38 AM To:Mishler, Nicholas F Subject:RE: 580 Carmel Nick, can you please have them send 2 sets of updated paper plans. Thank you. Lisa Kempa Carmel Utilities 30 West Main St., Ste 220 317/571-2443 From: Mishler, Nicholas F Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com'; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov'; 'Hartman-ryan.hartman@ctrwd.org'; 'Trent.Godsey@duke-energy.com'; Jordan, Alex; Glaser, Fred J Cc: 'Bill Poland' Subject: 580 Carmel Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 94 Mishler, Nicholas F From:Bill Poland <bpoland@gibsoncommercial.com> Sent:Monday, March 16, 2015 10:53 AM To:Mishler, Nicholas F Subject:Re: 580 Carmel Drive - Link to Electronic Files Thanks Nick! I’ve contacted Ground Works about becoming an approved contractor and I’ll let you know how that process is going. Thank you for the information! Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to wh ich they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. From: "Mishler, Nicholas F" < nmishler@carmel.in.gov > Date: Monday, March 16, 2015 at 10:04 AM To: Bill Poland < bpoland@gibsoncommercial.com > Subject: RE: 580 Carmel Drive - Link to Electronic Files 95 Bill, it looks like your excavator “Ground Works Excavating” is not on our list of bonded excavators with the City. Is there someone else you would like to list? If you would still like to use them contact Lisa Kempa at Carmel Utilities at 317-571-2443. She can set up the bonding information. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Bill Poland [ mailto:bpoland@gibsoncommercial.com ] Sent: Friday, March 13, 2015 6:58 AM To: Mishler, Nicholas F Subject: 580 Carmel Drive - Link to Electronic Files Hello Nick, As requested…please find below a link to the dropbox which contains the electronic drawings for the 580 Carmel Drive Project. Please do not hesitate to contact me if you have any problems downloading these files. https://www.dropbox.com/sh/fnrr8akr2e8h8tz/AACqvLp68HX_rOJUFoKuzrx2a?dl=0 Thank you! Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individua l or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email. 96 Mishler, Nicholas F From:Greg R. Hoyes <Greg.Hoyes@hamiltoncounty.in.gov> Sent:Monday, March 16, 2015 10:50 AM To:Mishler, Nicholas F; Conn, Angelina V; Lopez, Alexia K; Thomas, John G; Barnes, David R; Kass, Joslyn; Jordan, Alex; Glaser, Fred J Cc:'Bill Poland' Subject:RE: 580 Carmel Nick Hamilton County Surveyor’s Office still needs an outlet permit request and final construction plans/drainage calculations from our January 2014 TAC comment letter. Once we have that information and have issued the site outlet permit, then they are good to go from our end. If you have any questions, please let me know. Greg Hoyes, AC, CFM, CPESC Plan Reviewer Hamilton County Surveyor's Office From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Monday, March 16, 2015 10:44 AM To: Conn, Angelina V; Littlejohn, David W; Lopez, Alexia K; Mindham, Daren; 'jlclark@vectren.com'; Duffy, John M; Kempa, Lisa L; Thomas, John G; Barnes, David R; Lux, Pamela K; Kass, Joslyn; Jordan, Alex; 'Greg.Hoyes@hamiltoncounty.in.gov'; 'Hartman-ryan.hartman@ctrwd.org'; 'Trent.Godsey@duke-energy.com'; Jordan, Alex; Glaser, Fred J Cc: 'Bill Poland' Subject: 580 Carmel Good morning- I have received plans for the 580 Carmel project. It is a 32,000 square foot office building located at 580 E. Carmel Dr. Please see attached plans and let me know if your department will require additional information prior to a permit being released. Also, please copy Bill Poland with Gibson Commercial on your reply. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 97 Mishler, Nicholas F From:Bill Poland <bpoland@gibsoncommercial.com> Sent:Friday, March 13, 2015 6:58 AM To:Mishler, Nicholas F Subject:580 Carmel Drive - Link to Electronic Files Hello Nick, As requested…please find below a link to the dropbox which contains the electronic drawings for the 580 Carmel Drive Project. Please do not hesitate to contact me if you have any problems downloading these files. https://www.dropbox.com/sh/fnrr8akr2e8h8tz/AACqvLp68HX_rOJUFoKuzrx2a?dl=0 Thank you! Bill Poland | Gibson Commercial Construction Vice-President 5602 Elmwood Avenue, Suite 113 | Indianapolis, Indiana 46203 317.213.0819 (ext 11) | 317.363.1292 (cell) | 317.536.3912 (fax) bpoland@gibsoncommercial.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify the system manager. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the Company. Finally, the recipient should check this email and any attachments for the presence of viruses. The Company accepts no liability for any damage caused by any virus transmitted by this email.