HomeMy WebLinkAboutLake City Bank Northwest SW Permit 7-1-15.pdf�r or caq
° µnrsy`y`v
`- City of Carmel
� � STORMWATER MANAGEMENT PERMIT APPLICATIQN
+xoi�
Permit #: � � �
Submission of this application constitutes noilce thal theproject site orvner is applying for coveraae under the Carmel City Code §6�-]80�
through §6-209 farstormwater dischargas associated with eons[ruction activity disturbing �/a acre or more of land. Parmitted project site
owners are �equired to comply with all terms and �condi[ions of the Carmel City Code.
Projec� Name: Lake City Bank Northwest
Projeci Locacion: 96th 5tceet & Michigan Road
Quarter: SW Section: 7 'I`ownship: ��N Renge: 3E
Projecl Si[e Owner Name: Title/Position:
Lake Ciry Banl<
Company: Lake City Bank
Address:
1229 West Lake Street
City; State: Zip:
Warsaw IN 465$1-1387
Phbne: Fax: E-mail Address:
574-267-9156 574-267-2548 rick.hatcher@lakecitybank.com
SWPPPContactPerson: � CompanyName:
$oyd Zoccola Hokanson Companies, Inc.
Affiliation to Project Site Owner: Cpnstruction Manager
Address (/f different frart aUove):
2Q1 West ] 03rd Street, 5Liite 400
Ciry: State; 7.ip: �
Indianapotis IN 46290
Phone: Fax: E-mai1 Address:
317-G33-8081 317-633-8070 brz@hokansoninacom
EsGmated Projact Duxation: July 2015-July 2016
By signing this app}icadon, I certify tlie foltowing:
A. The storm wa[er quality measures included tin the Srorm W1ter Pollu[ion Prevention Plan (SWPPP) comply with the requiremen[s of
§6-1$0 through §6-209 of the Carmel City Code, the City of Carmel Smrmwater Technical Standards Manual, and all appticable
Pederal, state, and loca� stormwater reqiiirements;.
B. The.measures required 6y tlie Stormwater Pollution Prevention� Plan (SWPPP) shall be implemented;
C. S[ormwater quality measures beyond those specified in the Stormwater Po1luNon Prevention Plan �(SWppP) w�iil be im�lemented
during the life of tliepermit if necessary to camp(y with Ihe Carmel Ci[y Code; and
D. Implemen[ation of srormwater quality measures aviil�be inspected by [rained individaals;
E. Pursuant to Cazmal �City Code § 6�-205, the City reserves the righ[ to inspect and/or implement the stormwater qualiry measures
outlined in the Stornnvater Pollution Prevention Plan (SWPPP} or provide maintenance thereto, at my expense, if not performed.
f�r'"�!�� (/
� /�- Boyd R. Zoccola, Agent for Lake City Bank 7une 19, 2015
Signawre of Projec[ Owner Printed Name Date
� �/ `""�...,____..._._-.. �-'- / •— l cJ
f,m't ppproved: Bneineering Department Date
r.:... ,�''
Approval of [his npplication constiWtes accepcance ofihe Storm Wacer Pallution Preven[ion Plan (SWPPP) by the City of Cumet.