Loading...
HomeMy WebLinkAboutLake City Bank Northwest SW Permit 7-1-15.pdf�r or caq ° µnrsy`y`v `- City of Carmel � � STORMWATER MANAGEMENT PERMIT APPLICATIQN +xoi� Permit #: � � � Submission of this application constitutes noilce thal theproject site orvner is applying for coveraae under the Carmel City Code §6�-]80� through §6-209 farstormwater dischargas associated with eons[ruction activity disturbing �/a acre or more of land. Parmitted project site owners are �equired to comply with all terms and �condi[ions of the Carmel City Code. Projec� Name: Lake City Bank Northwest Projeci Locacion: 96th 5tceet & Michigan Road Quarter: SW Section: 7 'I`ownship: ��N Renge: 3E Projecl Si[e Owner Name: Title/Position: Lake Ciry Banl< Company: Lake City Bank Address: 1229 West Lake Street City; State: Zip: Warsaw IN 465$1-1387 Phbne: Fax: E-mail Address: 574-267-9156 574-267-2548 rick.hatcher@lakecitybank.com SWPPPContactPerson: � CompanyName: $oyd Zoccola Hokanson Companies, Inc. Affiliation to Project Site Owner: Cpnstruction Manager Address (/f different frart aUove): 2Q1 West ] 03rd Street, 5Liite 400 Ciry: State; 7.ip: � Indianapotis IN 46290 Phone: Fax: E-mai1 Address: 317-G33-8081 317-633-8070 brz@hokansoninacom EsGmated Projact Duxation: July 2015-July 2016 By signing this app}icadon, I certify tlie foltowing: A. The storm wa[er quality measures included tin the Srorm W1ter Pollu[ion Prevention Plan (SWPPP) comply with the requiremen[s of §6-1$0 through §6-209 of the Carmel City Code, the City of Carmel Smrmwater Technical Standards Manual, and all appticable Pederal, state, and loca� stormwater reqiiirements;. B. The.measures required 6y tlie Stormwater Pollution Prevention� Plan (SWPPP) shall be implemented; C. S[ormwater quality measures beyond those specified in the Stormwater Po1luNon Prevention Plan �(SWppP) w�iil be im�lemented during the life of tliepermit if necessary to camp(y with Ihe Carmel Ci[y Code; and D. Implemen[ation of srormwater quality measures aviil�be inspected by [rained individaals; E. Pursuant to Cazmal �City Code § 6�-205, the City reserves the righ[ to inspect and/or implement the stormwater qualiry measures outlined in the Stornnvater Pollution Prevention Plan (SWPPP} or provide maintenance thereto, at my expense, if not performed. f�r'"�!�� (/ � /�- Boyd R. Zoccola, Agent for Lake City Bank 7une 19, 2015 Signawre of Projec[ Owner Printed Name Date � �/ `""�...,____..._._-.. �-'- / •— l cJ f,m't ppproved: Bneineering Department Date r.:... ,�'' Approval of [his npplication constiWtes accepcance ofihe Storm Wacer Pallution Preven[ion Plan (SWPPP) by the City of Cumet.