Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CostOpinion - ROW-Transportation.pdf
Anderson Hall, Section 8 Engineer's Cost Estimate 4788.108 Lake City Bank Northwest Engineer's Cost Opinion 3502.004 Transportation Plan Asphalt Paving $3,421 165#/SYD. Surface $397 770#/SYD Intermediate $1,899 12" Subgrade $1,125 Miscellaneous $8,578 6" SSD $3,828 6" Straight Curb $4,750 96th Streeet Transportation Plan Total $12,000 Signature Todd C. Wallace 6/30/2015 Printed Name Sr. Project Manager Title Date Summary Item Estimated Cost Engineer's Opinion Prepared by: Lake City Bank Northwest Engineer's Cost Opinion 3502.004 Item Description Unit Estimated Quantity Unit Price Cost Miscellaneous $8,578 6" SSD LFT 262 $14.61 $3,828 6" Straight Curb LFT 262 $18.13 $4,750 Asphalt Paving 2121 sq ft $3,421 165#/SYD. Surface Ton 5 $79.44 $397 770#/SYD Intermediate Ton 36 $52.74 $1,899 12" Subgrade Ton 75 $15.00 $1,125 96th Streeet Transportation Plan Total $12,000 6/30/2015 T:\3k\3502\004\drainage\Cost\Calcs\CostOpinion - ROW