Loading...
HomeMy WebLinkAbout15080053 Storm Water Permit.pdfG`araGnb r�.nYc��*`t Ctty of Carmed STORMWATER MANAGEMENT PERMIT APPLICATION �Np�&NP Permit #: � �' Submission of this application constitutes notice that the p�•oject site owner is applying for coverage under the Carmel City Code §6-180 t}u•ough §6-209 for stormwater dischazges associated with construction activity disturbing �/a acre or more of ]and. Permitted praject site owners are required to wmply with ail terms and cond'rtions of the Caxmel Ciry Code. Project Name: Liberiy Fund Headquarters Project Looation: 11301 North Meridian Street, Cai7nel, Indiana (NW corner of 1I 1 th and Pennsylvania) Quarter: Section: Township: Range: NW 2 17N 3E Project Site Owner Name: Title/Position: Chris Talley President and CEO Company; Liberry Fund Inc. Address: 8335 Allisan Point Trail, Suite 300 City: State: Zip: Indianapolis Indiana 46250 Phone: Fax: E-mail Address: 317-842-0880 317-577-9067 etalle libe funQ.org SWPPP Contact Person: Company Name: Cbarles Scholer Shiel Sexton Company, Inc. Affillation to Project Site Owner: Construction Manager Address (If different from above): 902 N. Capitol Avenue City: State: Zip: Indianapolis Indiana 46204 Phone; Fax: �mail Address: 317-423-6026 317-423-6300 esholer@shielsexton.com Estimated Project Duration: September 2015 to Mareh 2017 By signing this application, I certify the following: A. The storm water quality measures included in [he Storm Water Pollution Prevention Plan (SWPPP) aomply with the requirements of §6-180 through §6-209 of the Carmel City Code, the Ciry of Carmel Stormwater Technical Standards Manual, and all applicable federal, state, and ]ocal stormwater requirements, B. The measures required by the Stm•mwater Pollution Prevention Plau (SWPPP) shall be implemented; C. Stormwater qualitymeasures tieyond those specified in the Stormwater Pollution Frevention Plan {SWPPP) wi[I be implemented during the life of the permit if necessary to comply with the Carme] City Code; and D. Implementation of stonnwater quality measures will be inspected by trained 'rndividuals; E. Pursuant to Carmel City Code § 6-205, the City reserves the right to inspect and/or implement the stormwater qualiry measures outlinedjy the Stormwater Pollution Preverition Plan (SWPPP) or provide maintenance thereto, at my expense, if not performed. Approved: Engineering Department Cl�ris Talley, President and CEO Printed Name Date �� 8-31-IS Date Approval of this application constitutes aeceptance of the Storm Water Pollution�Prevantion Ptan (SWPPP) by the Ciry of Cazmel.