HomeMy WebLinkAbout15060109 Storm Water PermitG�♦Y Of CqyMR
TyyiFus q<
Cily of Carmel
�STORMWATER MANAGEMENT PERMIT APPLICATION
/NOIANp
Submission of this application constitutes notice that the project site owner is applying for coverage under the Carmel Ciry Code §6-I80
through §6-209 for stormwater discharges associated witti construction activity disturbing i/a acre or more of land. Permitted project site
owners are required to comply with all terms and conditions of [he CarmeL City Code.
Project Name:
Project Location:
Carmel Corporate Center
Carmel Drive and Guilford Road
Quuter. NW Section: 36
Township: 18N
Project Site Owner Name: David Lazas
Company: Atapco Properties, (nc.
Address:
City:
One South Street, Suite 2800
Baltimore
State:
Phone: 410-347-7170 Fax:
SWPPP Contact Person: Same as Above
Affiliation to Project Site Owner:
Address (If different from above):
City:
Phone:
Estimated Project Duration:
State:
Fax:
Spring 2015 - Spring 2016
By signing ttiis application, I certify the following:
Range: 3E
Title/Position: Senior Development Manager
MD Z`p' 21202
E-mail Address: dlazas@atapco.com
Company Name:
E-mail Address:
�
A. The storm water quality measures included in ihe Storm Water Pollution Prevention Plan (SWPPP) comp]y with the requirements of
§6-180 through §6-209 of the Carmel City Code, the City oF Carme] Stormwater Technical Standards Manual, and �all applicable
federal, state, and ]ocat stormwater requirements;
B. The measures required by the Stormwater Pollution �Prevention Plan.(SWPPP) shall be implemented;
C. Stormwater quality measures beyond those specified in the Stormwater Pollution Prevention Plan (SWPPP) will be implemented
during th life of the permit if necessary [o comply with the Carmel City Code; and
D. Implem t tion of st water quality measures will be inspected by trained individuals;
E. Pursua t t Cazmel � ity ode �§ 6-205, the City reserves the right to inspectandlor implement the stormwater qualiry me�ures �
outlin d i`[he Stor wa r Pollution Prevention Plan (SWPPP) or provide maintenance thereto, at my expense,.if not pe rmed.
Engineering Department
��y� ,��9��4 �� 3 �a
Printed Name n, P
Date
G/���t1�
Approval of this apptication constitutes acceptance of the Storm Water Pollution Prevention Plan (SWPPP) by the City of Cazmel.