Mishler, Nicholas F
From:Lux, Pamela K
Sent:Thursday, February 27, 2014 2:49 PM
To:Hohlt, William G
Cc:Mishler, Nicholas F
Subject:RE: Barrington Final in E 2-26-2014
He scheduled the final for tomorrow. Would like to know the fees that are due. Thanks-
Pam Lux
Building and Code Services
City of Carmel
From: Hohlt, William G
Sent: Thursday, February 27, 2014 2:41 PM
To: Knott, Bruce; Blanchard, Jim E; Mishler, Nicholas F; Lux, Pamela K
Cc: Ellison, Christopher M; Ray, Lucas M; 'Wayne Blackmer ( wblackmer@LECESSEconstruction.com )'; Miser, Craig
Subject: RE: Barrington Final in E 2-26-2014
The final went well today.
There are a few outstanding items that will be addressed this afternoon or by tomorrows inspection of the remainder of
the project.
1. Install a temporary address that is visible from Guilford until permanent signage is installed
2. Install tempered glass where required as noted at the inspection at floor 1 or board over until new glass arrives.
3. Patch holes in drywall at the ends of corridors where sprinkler heads have been raised
Wayne will be calling in for floors 2 and 3. Today, floor 1 was inspected along with all corridors, common areas and the
parking garage today.
William Hohlt
Deputy Building Commissioner
City of Carmel
317.571.2470
From: Knott, Bruce
Sent: Wednesday, February 26, 2014 4:33 PM
To: Blanchard, Jim E; Mishler, Nicholas F; Lux, Pamela K; Hohlt, William G
Cc: Ellison, Christopher M; Ray, Lucas M; Knott, Bruce; 'Wayne Blackmer ( wblackmer@LECESSEconstruction.com )'
Subject: Barrington Final in E 2-26-2014
2
Hello,
CFD completed a final today for the E wing which we understand incorporates permit # 12070135
We located a couple rated damper issues that stem back from the last round if inspections. I will attach pictures to refer
to.
Lecesse is taking care of these issues, and we are satisfied with the direction of the repair. Most repairs should be
completed when you arrive.
Picture 1 is located in a maintenance space E first floor. The duct was penetrating a rated ceiling. The repair is going to
be for two layers of drywall to be fitted around the duct to maintain the rating.
Picture 2 shows the required dampers inside of a flexible duct. In lieu of cutting an access, the duct comes apart for
inspection.
Picture 3 located E second floor storage where D and E meet. This shows the access open exposing the required
damper, there is a damper on both ends. The same issue on the first floor exists, however due to space limitations, they
are choosing to wrap the duct with drywall to maintain the rated corridor. (sorry no picture of this. ) however they cited
IBC 716.5.4. and say it is protected as a through penetration. We know this is outside of the CFD scope but we got
involved with Bill Hohlt and wanted to assist.
These duct issues were in various stages of repair when we left today.
There is an outstanding issue in the fire pump room with make-up air, and its compromising the proper function of the
system. This is being addressed architecturally and the solution is to be forwarded.
The temporary rate d doorways that were installed to allow for phase occupancy as well as the heat detectors associated
with these doors no longer serve a purpose as far as CFD is concerned once the final area has been released.
CFD has inspected the life safety and fire suppression and alarm systems for this building.
One final note, there is no address visible from Guilford Rd. Please address this issue with them.
Have a great Wednesday
Bruce A. Knott
Fire Marshal
City of Carmel Fire Dept.
(317) 571-2600
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and
location.
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file
and location.
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
“Good judgement comes from experience, and a lot of that comes from bad judgement.”
Will Rogers
3
Mishler, Nicholas F
From:Hohlt, William G
Sent:Thursday, February 27, 2014 2:41 PM
To:Knott, Bruce; Blanchard, Jim E; Mishler, Nicholas F; Lux, Pamela K
Cc:Ellison, Christopher M; Ray, Lucas M; 'Wayne Blackmer
(wblackmer@LECESSEconstruction.com)'; Miser, Craig
Subject:RE: Barrington Final in E 2-26-2014
The final went well today.
There are a few outstanding items that will be addressed this afternoon or by tomorrows inspection of the remainder of
the project.
1. Install a temporary address that is visible from Guilford until permanent signage is installed
2. Install tempered glass where required as noted at the inspection at floor 1 or board over until new glass arrives.
3. Patch holes in drywall at the ends of corridors where sprinkler heads have been raised
Wayne will be calling in for floors 2 and 3. Today, floor 1 was inspected along with all corridors, common areas and the
parking garage today.
William Hohlt
Deputy Building Commissioner
City of Carmel
317.571.2470
From: Knott, Bruce
Sent: Wednesday, February 26, 2014 4:33 PM
To: Blanchard, Jim E; Mishler, Nicholas F; Lux, Pamela K; Hohlt, William G
Cc: Ellison, Christopher M; Ray, Lucas M; Knott, Bruce; 'Wayne Blackmer ( wblackmer@LECESSEconstruction.com )'
Subject: Barrington Final in E 2-26-2014
Hello,
CFD completed a final today for the E wing which we understand incorporates permit # 12070135
We located a couple rated damper issues that stem back from the last round if inspections. I will attach pictures to refer
to.
Lecesse is taking care of these issues, and we are satisfied with the direction of the repair. Most repairs should be
completed when you arrive.
Picture 1 is located in a maintenance space E first floor. The duct was penetrating a rated ceiling. The repair is going to
be for two layers of drywall to be fitted around the duct to maintain the rating.
4
Picture 2 shows the required dampers inside of a flexible duct. In lieu of cutting an access, the duct comes apart for
inspection.
Picture 3 located E second floor storage where D and E meet. This shows the access open exposing the required
damper, there is a damper on both ends. The same issue on the first floor exists, however due to space limitations, they
are choosing to wrap the duct with drywall to maintain the rated corridor. (sorry no picture of this. ) however they cited
IBC 716.5.4. and say it is protected as a through penetration. We know this is outside of the CFD scope but we got
involved with Bill Hohlt and wanted to assist.
These duct issues were in various stages of repair when we left today.
There is an outstanding issue in the fire pump room with make-up air, and its compromising the proper function of the
system. This is being addressed architecturally and the solution is to be forwarded.
The temporary rated doorway s that were installed to allow for phase occupancy as well as the heat detectors associated
with these doors no longer serve a purpose as far as CFD is concerned once the final area has been released.
CFD has inspected the life safety and fire suppression and alarm systems for this building.
One final note, there is no address visible from Guilford Rd. Please address this issue with them.
Have a great Wednesday
Bruce A. Knott
Fire Marshal
City of Carmel Fire Dept.
(317) 571-2600
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and
location.
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file
and location.
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
“Good judgement comes from experience, and a lot of that comes from bad judgement.”
Will Rogers
5
Mishler, Nicholas F
From:Knott, Bruce
Sent:Wednesday, February 26, 2014 4:33 PM
To:Blanchard, Jim E; Mishler, Nicholas F; Lux, Pamela K; Hohlt, William G
Cc:Ellison, Christopher M; Ray, Lucas M; Knott, Bruce; 'Wayne Blackmer
(wblackmer@LECESSEconstruction.com)'
Subject:Barrington Final in E 2-26-2014
Hello,
CFD completed a final today for the E wing which we understand incorporates permit # 12070135
We located a couple rated damper issues that stem back from the last round if inspections. I will attach pictures to refer
to.
Lecesse is taking care of these issues, and we are satisfied with the direction of the repair. Most repairs should be
completed when you arrive.
Picture 1 is located in a maintenance space E first floor. The duct was penetrating a rated ceiling. The repair is going to
be for two layers of drywall to be fitted around the duct to maintain the rating.
Picture 2 shows the required dampers inside of a flexible duct. In lieu of cutting an access, the duct comes apart for
inspection.
Picture 3 located E second floor storage where D and E meet. This shows the access open exposing the required
damper, there is a damper on both ends. The same issue on the first floor exists, however due to space limitations, they
are choosing to wrap the duct with drywall to maintain the rated corridor. (sorry no picture of this. ) however they cited
IBC 716.5.4. and say it is protected as a through penetration. We know this is outside of the CFD scope but we got
involved with Bill Hohlt and wanted to assist.
These duct issues were in various stages of repair when we left today.
There is an outstanding issue in the fire pump room with make-up air, and its compromising the proper function of the
system. This is being addressed architecturally and the solution is to be forwarded.
The temporary rated doorways that were installed to allow for phase occupancy as well as the heat detectors associated
with these doors no longer serve a purpose as far as CFD is concerned once the final area has been released.
CFD has inspected the life safety and fire suppression and alarm systems for this building.
One final note, there is no address visible from Guilford Rd. Please address this issue with them.
Have a great Wednesday
Bruce A. Knott
Fire Marshal
City of Carmel Fire Dept.
(317) 571-2600
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and
location.
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file
and location.
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
6
“Good judgement comes from experience, and a lot of that comes from bad judgement.”
Will Rogers
7
Mishler, Nicholas F
From:Wayne Blackmer <wblackmer@LECESSEconstruction.com>
Sent:Sunday, February 23, 2014 8:24 AM
To:Mindham, Daren
Cc:Hohlt, William G; Mishler, Nicholas F; Tomy Lombardozzi
Subject:RE: The Barrington Landscape Inspection
Daren,
What does Lecesse need to do seeing as this isn’t a good time of year to plant these items in order to receive
The C of O. It does show that we have the majority of the final plan accomplished so is there a way to hold in lieu of
completion early this spring?
Wayne Blackmer
Superintendent
585-202-7945
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
From concept to completion, we build it as if it’s our own.
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
From: Mindham, Daren [mailto:dmindham@carmel.in.gov]
Sent: Friday, February 21, 2014 3:40 PM
To: Wayne Blackmer
Cc: Hohlt, William G; Mishler, Nicholas F
Subject: The Barrington Landscape Inspection
Wayne,
I was out today to do the landscape inspection. I found a few issues that will still need to be addressed.
• Please remove all synthetic rope/twine in the crowns of the trees. There are about a dozen or so trees with
twine in the crowns that need to be removed throughout the site.
• I have attached the overall landscape plan ‘barrington inspection’ showing areas that may be missing material
in green with a red circle around them. Please ensure that these areas are landscaped according to the plans.
Most of these are small trees or shrubs that are missing, however, some of these are there but not planted.
Feel free to call or email me for a re-inspection.
Daren Mindham | Urban Forester
One Civic Square, Carmel, Indiana 46032
Ph: 317-571-2417
8
Mishler, Nicholas F
From:Mindham, Daren
Sent:Friday, February 21, 2014 3:40 PM
To:'wblackmer@LECESSEconstruction.com'
Cc:Hohlt, William G; Mishler, Nicholas F
Subject:The Barrington Landscape Inspection
Wayne,
I was out today to do the landscape inspection. I found a few issues that will still need to be addressed.
• Please remove all synthetic rope/twine in the crowns of the trees. There are about a dozen or so trees with
twine in the crowns that need to be removed throughout the site.
• I have attached the overall landscape plan ‘barrington inspection’ showing areas t hat may be missing material in
green with a red circle around them. Please ensure that these areas are landscaped according to the plans. Most
of these are small trees or shrubs that are missing, however, some of these are there but not planted.
Feel free to call or email me for a re-inspection.
Daren Mindham | Urban Forester
One Civic Square, Carmel, Indiana 46032
Ph: 317-571-2417
9
Mishler, Nicholas F
From:Wayne Blackmer <wblackmer@LECESSEconstruction.com>
Sent:Monday, January 27, 2014 10:55 AM
To:Mishler, Nicholas F
Subject:RE: Barrington Section 7
I expect to be calling for the week of 2-14. Sometime around weds. Of that week. So say for 2-12 or 2-13
Wayne Blackmer
Superintendent
585-202-7945
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
From concept to completion, we build it as if it’s our own.
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, January 27, 2014 10:45 AM
To: Wayne Blackmer
Subject: Barrington Section 7
Hi Wayne, I received your message the other day regarding Barrington Section 7 fees. Do you know when you will be calling in for a final
inspection? We typically don’t calculate these fees until there has been a final called in so we don’t double-charge for any inspections.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
10
Mishler, Nicholas F
From:Hohlt, William G
Sent:Friday, December 13, 2013 9:00 AM
To:Knott, Bruce; Lux, Pamela K; Mishler, Nicholas F
Subject:FW: Barrington
Please note that area B, should be ready for a Temp C/O if Wayne comes in today. Once again, we will walk the entire job at the end
of All construction
Thank you
William Hohlt
Deputy Building Commissioner
City of Carmel
317.571.2470
-----Original Message-----
From: Hohlt, William G
Sent: Friday, December 13, 2013 8:09 AM
To: Knott, Bruce; Kendall, Jeff
Subject: RE: Barrington
Bruce,
I had to dr appointments yesterday, left at 11 AM.
I advised Jeff to check the mechanical room doors. He did fail A wing for 3 items
From his notes, it appears B wing is approved
William Hohlt
Deputy Building Commissioner
City of Carmel
317.571.2470
-----Original Message-----
From: Knott, Bruce
Sent: Friday, December 13, 2013 7:54 AM
To: Hohlt, William G; Kendall, Jeff
Subject: Barrington
Wayne says that DOCS approved the B wing yesterday. Were all the openings that were cut for the dampers now fitted with metal
access covers?
Thanks
Bruce Knott
11
Mishler, Nicholas F
From:Gary Hubble <ghubble@LECESSEconstruction.com>
Sent:Friday, November 22, 2013 4:16 PM
To:Mishler, Nicholas F
Cc:Tomy Lombardozzi; Wayne Blackmer; Hohlt, William G; Blanchard, Jim E; Lux, Pamela K;
Kass, Joslyn
Subject:RE: Barrington Sections 1-4
Thank you
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Friday, November 22, 2013 4:02 PM
To: Gary Hubble
Cc: Tomy Lombardozzi; Wayne Blackmer; Hohlt, William G; Blanchard, Jim E; Lux, Pamela K; Kass, Joslyn
Subject: Barrington Sections 1-4
Gary-
As we discussed the other day, we will be calculating the total for inspections so far and charging 25%. The totals for sections 1-4
are below along with the grand total at the bottom. I have also attached the inspection fee calculation worksheets for your
reference.
Section 1 - 12070129
9 inspections @ $115
12 inspections @ $116.50
$2433.00 x 25%
Total: $608.25
Section 2 - 12070130
5 inspections @ $115
8 inspections @ $116.50
$1507.00 x 25%
Total: $376.75
Section 3 – 12070131
1 inspection @ $115
15 inspections @ $116.50
$1862.50 x 25%
Total: $465.62
Section 4 – 12070132
2 inspection @ $115
7 inspections @ $116.50
$1045.50 x 25%
Total: $261.38
Grand total: $1712.00
Thanks,
Nick Mishler
12
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
13
Mishler, Nicholas F
From:Gary Hubble <ghubble@LECESSEconstruction.com>
Sent:Friday, November 22, 2013 2:36 PM
To:Mishler, Nicholas F
Cc:Tomy Lombardozzi; Wayne Blackmer
Subject:Barrington Fees
Nick,
do you have a total fees for us on Barrington for the 1 st 4 areas that you have given us ok to occupy. We are getting
ready for the next area and wanted to get this settled before that #5 area is ready.
Thanks Gary
Gary Hubble
Senior Superintendent
LECESSE Construction Services
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
“From Concept to Completion We build it as if it’s our own”
585-202-1407 cell
585-334-4490 office
www.lecesseconstruction.com
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.