Loading...
HomeMy WebLinkAboutDanny Boy Beerworks SW Permit 2-28-13.pdf�4�t�e? N�� • �' ,, j Cliy Of CaTniCl �. ; STORMWATER MANAGEMENT PERMIT APPLICATION � � �pm�xE '� Perntit#: .�' � � Submission of this application consatntes no6ce that the pcoject site owner is applying for coverage under the Carmel City Code §6-180 through §6-209 for stormwater discharges associated with construction activity disturbing'/a acre or more af land. Permitted project site owners aze required to comply with all [erms and conditions of the Carmel City Code. Project Name: Danny Soy Beer Works Projeot Location: 12702 Meating House Road, NE Cor Meeting House Road & Rhettsbury St., Village of West Clay Quarter: S� Section: Township: 18N Range: 2g 3E Projact S'rte Owner Name: TitlelPosiuon: Kevin Paul Ownar Company: Abby Tap House, LLG Address: t 1590 N. Mandian St, 5520 City: State: Zip: Carme( Indiana 46Q32 Phone: Fa�c: E-mail Address: 317339-7932 319-573-2540 k�aut�bhsoludons.com SWPFF Contact Person: Company Namc: Kevin Paul Abby Tap Nousa, LLC Affiliation to Project Site Owner: Same Address (If different from above): Same �9ty: State: . 'Lip: Phone: Faz: E-mail Address: Estlmated Project Durafion: Augnst 2q 13 - Mazch 2014 By signing this application, I ceriify the following: A. The starm water yaaliTy rneasures includeci in ihe Stqrm Water PolluUon Prevention Plan (SWPPP) comgly with the requirements af §b-180 throuah §b-209 of the Carmet City Code, the City of Carmel Stormwater Technical Standards Manual, and all applicuble fedecal, state, and loea] stormwatzr requiremenis; S. The meaisures required by [he Stormwatei Pollution Preaention Plan {SWPPP) shatl be imQlemen[ed; C. Stormwater quality mea,vures beyond those specified in the Stormwater Pollntion Prevenaon Plan (SWPPP) will be implemented during the life of the perarit if necessary to comply with ihe Carmel Ciry Code; and D. Tmplementation of stormwater qualiry mcasures will be inspec[ad by trained individvals; E. Pursuant to Cdrmet City Code § fi-205, the City reserves the right to inspect and/or impleme�t the stormwater quality measures outlined iu tJ}e Stormwa[er Pollution Pxevention Plan (SWPPP) or provide meintenance thereto, a[ my expense, if not perfarmect. / I1 � / � � }t �� ��� j� Kevin Paul 6�,�- �"� Signamre f P b�%je�.[ O er ���� Printed Name Date � ��------ �-/2�"�1 � .�� rnut Approved: Engineering Department � Date Approval of tLis application constimtes aceeptance of the Storm Water Pollunon Prevention Ptan (SWPPP) by die Ciry of Carmet.