HomeMy WebLinkAboutCorrespondence.pdf1
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Monday, February 15, 2016 1:36 PM
To:Mishler, Nicholas F
Subject:RE: Passed meters [T2016020902GPS010Z6005387]
Nick -- I am okay with this un it mix change, but it would have been nice of them to tell all of us beforehand, right?!
Angie Conn, AICP | Planning Administrator
From: Mishler, Nicholas F
Sent: Monday, February 15, 2016 12:38 PM
To: Conn, Angelina V
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
Yes. The difference is the two buildings (1 & 3) that originally came in as 20-units each are now 23-units each, for the additional 6 units.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Conn, Angelina V
Sent: Monday, February 15, 2016 12:37 PM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
Nick –
I just checked, and it looks like it is a 284-unit cap written into the Atapco PUD ordinance… how many apartment
dwellings per permitted at Carmel Lakeside Apartments? 283?
Angie Conn, AICP | Planning Administrator
From: Mishler, Nicholas F
Sent: Monday, February 15, 2016 12:31 PM
To: Conn, Angelina V
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
Is that something they would need you to approve? I think it was probably changed after they started construction. Not sure why they would
change the layouts… I am going to have him fill out plan revisions and then pay the additional PRIF, CO fee, etc.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
2
Please consider the environment before printing this email
From: Conn, Angelina V
Sent: Monday, February 15, 2016 12:28 PM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
Not that I know of. …Do you need me to go back through correspondence from when they went through the Plan
Commission approval process? Or, do you think they changed the unit mix after that?
Angie Conn, AICP | Planning Administrator
From: Mishler, Nicholas F
Sent: Monday, February 15, 2016 12:24 PM
To: Conn, Angelina V
Subject: FW: Passed meters [T2016020902GPS010Z6005387]
Angie-
See below. Did you ever receive correspondence from JC Hart that Lakeside Apartments buildings 1 & 3 changed from 20-unit buildings to 23-unit
buildings?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Steve Reinbrecht [ mailto:steve.reinbrecht@homeisjchart.com ]
Sent: Monday, February 15, 2016 12:15 PM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
That is incorrect, building 1 is a 23 unit building. Here is the breakdown of units per building. If you have something
different let me know what I need to have corrected.
Building 1 – 23 units
Building 2 – 39 units
Building 3 – 23 units
Building 4 – 39 units
Building 5 – 39 units
Building 6 – 10 units
Building 7 – 10 units
Building 8 – 10 units
Building 9 – 10 units
Building 10 – 10 units
Building 11 – 10 units
Building 12 – 10 units
Building 13 – 10 units
Building 14 – 10 units
Building 15 – 10 units
Building 16 – 10 units
3
Building 17 – 10 units
Total – 283 units
Steve Reinbrecht
Superintendent
J.C. Hart Company
317-664-0632
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, February 15, 2016 11:39 AM
To: Steve Reinbrecht < steve.reinbrecht@homeisjchart.com >
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
This application shows this is a 20-unit building…that is incorrect? Do you have the complete breakdown of units per building? If that’s different
from what is submitted, I will need to add this to the notes.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Steve Reinbrecht [ mailto:steve.reinbrecht@homeisjchart.com ]
Sent: Monday, February 15, 2016 11:35 AM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
Nick,
Here are the actual addresses and I have attached the meter applications that I have sent to Duke.
1st floor units – 101, 102, 103, 104, 105 and 106
2nd floor units – 201, 202, 203, 204, 205, 206, 207, 208 and 209
3rd floor units – 301, 302, 303, 304, 305, 306, 307 and 308
There are 2 house panels on this building as well for a total of 25 meters.
Steve Reinbrecht
Superintendent
J.C. Hart Company
317-664-0632
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, February 15, 2016 10:48 AM
To: Steve Reinbrecht < steve.reinbrecht@homeisjchart.com >
Subject: FW: Passed meters [T2016020902GPS010Z6005387]
Steve, see below. Duke is asking for the actual unit numbers for building 1 at Lakeside Apartments. The application says there are 20 units, but on
the actual building plans, it shows this is a type-2 building with 24 units (101-106, 201-209 & 301-309)
Can you tell me the actual unit numbers for this building so I can let Duke know?
4
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: INSvcInstall [ mailto:avaya_INSvcInstall@duke-energy.com ]
Sent: Monday, February 15, 2016 10:08 AM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
Good morning,
Thank you for replying to our email, we do understand that there are 20 units and the inspection did
cover all 20. Can you please resubdmit a list of the unit numbers the permit is for, or feel free to
contact our office at 1-800-774-0246 for further assistance.
Thank you
--- Original Message ---
On February 12, 2016 at 8:32 AM, "Mishler, Nicholas F" wrote:
I only show that building as being 20 units, and the inspection covered all 20.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
5
From: INSvcInstall [mailto:avaya_INSvcInstall@duke-energy.com]
Sent: Thursday, February 11, 2016 3:30 PM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z5996224]
Good Afternoon,
We have received the Permit that you sent to us for 12424 Breaklines St, Building 1, for 20 units. We
have applications on file for 24 units. Please resubmit listing the unit numbers that the permit is for.
Please contact us by email or by contacting a customer service representative by calling 1-800-774-
0246 if further assistance is needed. Representatives are available Monday through Friday from 7
a.m. to 5 p.m.
Best regards,
Service Installation Dept
Duke Energy
--- Original Message ---
On February 9, 2016 at 4:44 PM, "Mishler, Nicholas F" wrote:
*** Exercise caution. This is an EXTERNAL email. DO NOT open attachments or click links from
unknown senders or unexpected email. ***
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
6
Please consider the environment before printing this email
7
Mishler, Nicholas F
From:Steve Reinbrecht <steve.reinbrecht@homeisjchart.com>
Sent:Monday, February 15, 2016 12:45 PM
To:Mishler, Nicholas F
Subject:RE: Passed meters [T2016020902GPS010Z6005387]
Nick,
There hasn’t been plan changes that changed the amount of units. It looks like when we submitted for the permits I
wrote down 20 units instead of 23 units. I doubled check the state design release and it shows 2 23 unit buildings. Do I
still need to fill out the form you sent me?
Can you also let me know what the additional fees will be?
Steve Reinbrecht
Superintendent
J.C. Hart Company
317-664-0632
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, February 15, 2016 12:22 PM
To: Steve Reinbrecht <steve.reinbrecht@homeisjchart.com>
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
Everything matches up with the exception of buildings 1 & 3, which both came in as 20-unit buildings. The original correspondence for the Lakeside
project indicated it was 277 units. We should probably have you complete plan revisions for each of these buildings so we can get these
corrected. You would also need to pay for the additional PRIF and CO fees for each building. I have attached the form you will need to submit for
each of the two permits.
If you have any questions, let me know.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Steve Reinbrecht [ mailto:steve.reinbrecht@homeisjchart.com ]
Sent: Monday, February 15, 2016 12:15 PM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
That is incorrect, building 1 is a 23 unit building. Here is the breakdown of units per building. If you have something
different let me know what I need to have corrected.
Building 1 – 23 units
Building 2 – 39 units
Building 3 – 23 units
8
Building 4 – 39 units
Building 5 – 39 units
Building 6 – 10 units
Building 7 – 10 units
Building 8 – 10 units
Building 9 – 10 units
Building 10 – 10 units
Building 11 – 10 units
Building 12 – 10 units
Building 13 – 10 units
Building 14 – 10 units
Building 15 – 10 units
Building 16 – 10 units
Building 17 – 10 units
Total – 283 units
Steve Reinbrecht
Superintendent
J.C. Hart Company
317-664-0632
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, February 15, 2016 11:39 AM
To: Steve Reinbrecht < steve.reinbrecht@homeisjchart.com >
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
This application shows this is a 20-unit building…that is incorrect? Do you have the complete breakdown of units per building? If that’s different
from what is submitted, I will need to add this to the notes.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Steve Reinbrecht [ mailto:steve.reinbrecht@homeisjchart.com ]
Sent: Monday, February 15, 2016 11:35 AM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
Nick,
Here are the actual addresses and I have attached the meter applications that I have sent to Duke.
1st floor units – 101, 102, 103, 104, 105 and 106
2nd floor units – 201, 202, 203, 204, 205, 206, 207, 208 and 209
3rd floor units – 301, 302, 303, 304, 305, 306, 307 and 308
There are 2 house panels on this building as well for a total of 25 meters.
Steve Reinbrecht
9
Superintendent
J.C. Hart Company
317-664-0632
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, February 15, 2016 10:48 AM
To: Steve Reinbrecht < steve.reinbrecht@homeisjchart.com >
Subject: FW: Passed meters [T2016020902GPS010Z6005387]
Steve, see below. Duke is asking for the actual unit numbers for building 1 at Lakeside Apartments. The application says there are 20 units, but on
the actual building plans, it shows this is a type-2 building with 24 units (101-106, 201-209 & 301-309)
Can you tell me the actual unit numbers for this building so I can let Duke know?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: INSvcInstall [ mailto:avaya_INSvcInstall@duke-energy.com ]
Sent: Monday, February 15, 2016 10:08 AM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
Good morning,
Thank you for replying to our email, we do understand that there are 20 units and the inspection did
cover all 20. Can you please resubdmit a list of the unit numbers the permit is for, or feel free to
contact our office at 1-800-774-0246 for further assistance.
Thank you
--- Original Message ---
On February 12, 2016 at 8:32 AM, "Mishler, Nicholas F" wrote:
I only show that building as being 20 units, and the inspection covered all 20.
Thanks,
Nick Mishler
10
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: INSvcInstall [mailto:avaya_INSvcInstall@duke-energy.com]
Sent: Thursday, February 11, 2016 3:30 PM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z5996224]
Good Afternoon,
We have received the Permit that you sent to us for 12424 Breaklines St, Building 1, for 20 units. We
have applications on file for 24 units. Please resubmit listing the unit numbers that the permit is for.
Please contact us by email or by contacting a customer service representative by calling 1-800-774-
0246 if further assistance is needed. Representatives are available Monday through Friday from 7
a.m. to 5 p.m.
Best regards,
Service Installation Dept
Duke Energy
--- Original Message ---
On February 9, 2016 at 4:44 PM, "Mishler, Nicholas F" wrote:
*** Exercise caution. This is an EXTERNAL email. DO NOT open attachments or click links from
unknown senders or unexpected email. ***
11
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
12
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Monday, February 15, 2016 12:37 PM
To:Mishler, Nicholas F
Subject:RE: Passed meters [T2016020902GPS010Z6005387]
Nick –
I just checked, and it looks like it is a 284-unit cap written into the Atapco PUD ordinance… how many apartment
dwellings per permitted at Carmel Lakeside Apartments? 283?
Angie Conn, AICP | Planning Administrator
From: Mishler, Nicholas F
Sent: Monday, February 15, 2016 12:31 PM
To: Conn, Angelina V
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
Is that something they would need you to approve? I think it was probably changed after they started construction. Not sure why they would
change the layouts… I am going to have him fill out plan revisions and then pay the additional PRIF, CO fee, etc.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Conn, Angelina V
Sent: Monday, February 15, 2016 12:28 PM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
Not that I know of. …Do you need me to go back through correspondence from when they went through the Plan
Commission approval process? Or, do you think they changed the unit mix after that?
Angie Conn, AICP | Planning Administrator
From: Mishler, Nicholas F
Sent: Monday, February 15, 2016 12:24 PM
To: Conn, Angelina V
Subject: FW: Passed meters [T2016020902GPS010Z6005387]
Angie-
See below. Did you ever receive correspondence from JC Hart that Lakeside Apartments buildings 1 & 3 changed from 20-unit buildings to 23-unit
buildings?
Thanks,
Nick Mishler
13
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Steve Reinbrecht [ mailto:steve.reinbrecht@homeisjchart.com ]
Sent: Monday, February 15, 2016 12:15 PM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
That is incorrect, building 1 is a 23 unit building. Here is the breakdown of units per building. If you have something
different let me know what I need to have corrected.
Building 1 – 23 units
Building 2 – 39 units
Building 3 – 23 units
Building 4 – 39 units
Building 5 – 39 units
Building 6 – 10 units
Building 7 – 10 units
Building 8 – 10 units
Building 9 – 10 units
Building 10 – 10 units
Building 11 – 10 units
Building 12 – 10 units
Building 13 – 10 units
Building 14 – 10 units
Building 15 – 10 units
Building 16 – 10 units
Building 17 – 10 units
Total – 283 units
Steve Reinbrecht
Superintendent
J.C. Hart Company
317-664-0632
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, February 15, 2016 11:39 AM
To: Steve Reinbrecht < steve.reinbrecht@homeisjchart.com >
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
This application shows this is a 20-unit building…that is incorrect? Do you have the complete breakdown of units per building? If that’s different
from what is submitted, I will need to add this to the notes.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
14
From: Steve Reinbrecht [ mailto:steve.reinbrecht@homeisjchart.com ]
Sent: Monday, February 15, 2016 11:35 AM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
Nick,
Here are the actual addresses and I have attached the meter applications that I have sent to Duke.
1st floor units – 101, 102, 103, 104, 105 and 106
2nd floor units – 201, 202, 203, 204, 205, 206, 207, 208 and 209
3rd floor units – 301, 302, 303, 304, 305, 306, 307 and 308
There are 2 house panels on this building as well for a total of 25 meters.
Steve Reinbrecht
Superintendent
J.C. Hart Company
317-664-0632
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, February 15, 2016 10:48 AM
To: Steve Reinbrecht < steve.reinbrecht@homeisjchart.com >
Subject: FW: Passed meters [T2016020902GPS010Z6005387]
Steve, see below. Duke is asking for the actual unit numbers for building 1 at Lakeside Apartments. The application says there are 20 units, but on
the actual building plans, it shows this is a type-2 building with 24 units (101-106, 201-209 & 301-309)
Can you tell me the actual unit numbers for this building so I can let Duke know?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: INSvcInstall [ mailto:avaya_INSvcInstall@duke-energy.com ]
Sent: Monday, February 15, 2016 10:08 AM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
Good morning,
Thank you for replying to our email, we do understand that there are 20 units and the inspection did
cover all 20. Can you please resubdmit a list of the unit numbers the permit is for, or feel free to
contact our office at 1-800-774-0246 for further assistance.
Thank you
15
--- Original Message ---
On February 12, 2016 at 8:32 AM, "Mishler, Nicholas F" wrote:
I only show that building as being 20 units, and the inspection covered all 20.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: INSvcInstall [mailto:avaya_INSvcInstall@duke-energy.com]
Sent: Thursday, February 11, 2016 3:30 PM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z5996224]
Good Afternoon,
We have received the Permit that you sent to us for 12424 Breaklines St, Building 1, for 20 units. We
have applications on file for 24 units. Please resubmit listing the unit numbers that the permit is for.
Please contact us by email or by contacting a customer service representative by calling 1-800-774-
0246 if further assistance is needed. Representatives are available Monday through Friday from 7
a.m. to 5 p.m.
Best regards,
Service Installation Dept
Duke Energy
16
--- Original Message ---
On February 9, 2016 at 4:44 PM, "Mishler, Nicholas F" wrote:
*** Exercise caution. This is an EXTERNAL email. DO NOT open attachments or click links from
unknown senders or unexpected email. ***
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
17
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Monday, February 15, 2016 12:28 PM
To:Mishler, Nicholas F
Subject:RE: Passed meters [T2016020902GPS010Z6005387]
Not that I know of. …Do you need me to go back through correspondence from when they went through the Plan
Commission approval process? Or, do you think they changed the unit mix after that?
Angie Conn, AICP | Planning Administrator
From: Mishler, Nicholas F
Sent: Monday, February 15, 2016 12:24 PM
To: Conn, Angelina V
Subject: FW: Passed meters [T2016020902GPS010Z6005387]
Angie-
See below. Did you ever receive correspondence from JC Hart that Lakeside Apartments buildings 1 & 3 changed from 20-unit buildings to 23-unit
buildings?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Steve Reinbrecht [ mailto:steve.reinbrecht@homeisjchart.com ]
Sent: Monday, February 15, 2016 12:15 PM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
That is incorrect, building 1 is a 23 unit building. Here is the breakdown of units per building. If you have something
different let me know what I need to have corrected.
Building 1 – 23 units
Building 2 – 39 units
Building 3 – 23 units
Building 4 – 39 units
Building 5 – 39 units
Building 6 – 10 units
Building 7 – 10 units
Building 8 – 10 units
Building 9 – 10 units
Building 10 – 10 units
Building 11 – 10 units
Building 12 – 10 units
Building 13 – 10 units
18
Building 14 – 10 units
Building 15 – 10 units
Building 16 – 10 units
Building 17 – 10 units
Total – 283 units
Steve Reinbrecht
Superintendent
J.C. Hart Company
317-664-0632
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, February 15, 2016 11:39 AM
To: Steve Reinbrecht < steve.reinbrecht@homeisjchart.com >
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
This application shows this is a 20-unit building…that is incorrect? Do you have the complete breakdown of units per building? If that’s different
from what is submitted, I will need to add this to the notes.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Steve Reinbrecht [ mailto:steve.reinbrecht@homeisjchart.com ]
Sent: Monday, February 15, 2016 11:35 AM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
Nick,
Here are the actual addresses and I have attached the meter applications that I have sent to Duke.
1st floor units – 101, 102, 103, 104, 105 and 106
2nd floor units – 201, 202, 203, 204, 205, 206, 207, 208 and 209
3rd floor units – 301, 302, 303, 304, 305, 306, 307 and 308
There are 2 house panels on this building as well for a total of 25 meters.
Steve Reinbrecht
Superintendent
J.C. Hart Company
317-664-0632
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, February 15, 2016 10:48 AM
To: Steve Reinbrecht < steve.reinbrecht@homeisjchart.com >
Subject: FW: Passed meters [T2016020902GPS010Z6005387]
19
Steve, see below. Duke is asking for the actual unit numbers for building 1 at Lakeside Apartments. The application says there are 20 units, but on
the actual building plans, it shows this is a type-2 building with 24 units (101-106, 201-209 & 301-309)
Can you tell me the actual unit numbers for this building so I can let Duke know?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: INSvcInstall [ mailto:avaya_INSvcInstall@duke-energy.com ]
Sent: Monday, February 15, 2016 10:08 AM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
Good morning,
Thank you for replying to our email, we do understand that there are 20 units and the inspection did
cover all 20. Can you please resubdmit a list of the unit numbers the permit is for, or feel free to
contact our office at 1-800-774-0246 for further assistance.
Thank you
--- Original Message ---
On February 12, 2016 at 8:32 AM, "Mishler, Nicholas F" wrote:
I only show that building as being 20 units, and the inspection covered all 20.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
20
From: INSvcInstall [mailto:avaya_INSvcInstall@duke-energy.com]
Sent: Thursday, February 11, 2016 3:30 PM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z5996224]
Good Afternoon,
We have received the Permit that you sent to us for 12424 Breaklines St, Building 1, for 20 units. We
have applications on file for 24 units. Please resubmit listing the unit numbers that the permit is for.
Please contact us by email or by contacting a customer service representative by calling 1-800-774-
0246 if further assistance is needed. Representatives are available Monday through Friday from 7
a.m. to 5 p.m.
Best regards,
Service Installation Dept
Duke Energy
--- Original Message ---
On February 9, 2016 at 4:44 PM, "Mishler, Nicholas F" wrote:
*** Exercise caution. This is an EXTERNAL email. DO NOT open attachments or click links from
unknown senders or unexpected email. ***
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
21
(317) 571-2489
Please consider the environment before printing this email
22
Mishler, Nicholas F
From:Steve Reinbrecht <steve.reinbrecht@homeisjchart.com>
Sent:Monday, February 15, 2016 12:15 PM
To:Mishler, Nicholas F
Subject:RE: Passed meters [T2016020902GPS010Z6005387]
That is incorrect, building 1 is a 23 unit building. Here is the breakdown of units per building. If you have something
different let me know what I need to have corrected.
Building 1 – 23 units
Building 2 – 39 units
Building 3 – 23 units
Building 4 – 39 units
Building 5 – 39 units
Building 6 – 10 units
Building 7 – 10 units
Building 8 – 10 units
Building 9 – 10 units
Building 10 – 10 units
Building 11 – 10 units
Building 12 – 10 units
Building 13 – 10 units
Building 14 – 10 units
Building 15 – 10 units
Building 16 – 10 units
Building 17 – 10 units
Total – 283 units
Steve Reinbrecht
Superintendent
J.C. Hart Company
317-664-0632
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, February 15, 2016 11:39 AM
To: Steve Reinbrecht <steve.reinbrecht@homeisjchart.com>
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
This application shows this is a 20-unit building…that is incorrect? Do you have the complete breakdown of units per building? If that’s different
from what is submitted, I will need to add this to the notes.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
23
From: Steve Reinbrecht [ mailto:steve.reinbrecht@homeisjchart.com ]
Sent: Monday, February 15, 2016 11:35 AM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
Nick,
Here are the actual addresses and I have attached the meter applications that I have sent to Duke.
1st floor units – 101, 102, 103, 104, 105 and 106
2nd floor units – 201, 202, 203, 204, 205, 206, 207, 208 and 209
3rd floor units – 301, 302, 303, 304, 305, 306, 307 and 308
There are 2 house panels on this building as well for a total of 25 meters.
Steve Reinbrecht
Superintendent
J.C. Hart Company
317-664-0632
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, February 15, 2016 10:48 AM
To: Steve Reinbrecht < steve.reinbrecht@homeisjchart.com >
Subject: FW: Passed meters [T2016020902GPS010Z6005387]
Steve, see below. Duke is asking for the actual unit numbers for building 1 at Lakeside Apartments. The application says there are 20 units, but on
the actual building plans, it shows this is a type-2 building with 24 units (101-106, 201-209 & 301-309)
Can you tell me the actual unit numbers for this building so I can let Duke know?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: INSvcInstall [ mailto:avaya_INSvcInstall@duke-energy.com ]
Sent: Monday, February 15, 2016 10:08 AM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
Good morning,
Thank you for replying to our email, we do understand that there are 20 units and the inspection did
cover all 20. Can you please resubdmit a list of the unit numbers the permit is for, or feel free to
contact our office at 1-800-774-0246 for further assistance.
Thank you
24
--- Original Message ---
On February 12, 2016 at 8:32 AM, "Mishler, Nicholas F" wrote:
I only show that building as being 20 units, and the inspection covered all 20.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: INSvcInstall [mailto:avaya_INSvcInstall@duke-energy.com]
Sent: Thursday, February 11, 2016 3:30 PM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z5996224]
Good Afternoon,
We have received the Permit that you sent to us for 12424 Breaklines St, Building 1, for 20 units. We
have applications on file for 24 units. Please resubmit listing the unit numbers that the permit is for.
Please contact us by email or by contacting a customer service representative by calling 1-800-774-
0246 if further assistance is needed. Representatives are available Monday through Friday from 7
a.m. to 5 p.m.
Best regards,
Service Installation Dept
Duke Energy
25
--- Original Message ---
On February 9, 2016 at 4:44 PM, "Mishler, Nicholas F" wrote:
*** Exercise caution. This is an EXTERNAL email. DO NOT open attachments or click links from
unknown senders or unexpected email. ***
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
26
Mishler, Nicholas F
From:Steve Reinbrecht <steve.reinbrecht@homeisjchart.com>
Sent:Monday, February 15, 2016 11:35 AM
To:Mishler, Nicholas F
Subject:RE: Passed meters [T2016020902GPS010Z6005387]
Attachments:Meter Request BLDG 1 East Side 2-8-16.pdf; Meter Request BLDG 1 West Side
2-8-16.pdf
Nick,
Here are the actual addresses and I have attached the meter applications that I have sent to Duke.
1st floor units – 101, 102, 103, 104, 105 and 106
2nd floor units – 201, 202, 203, 204, 205, 206, 207, 208 and 209
3rd floor units – 301, 302, 303, 304, 305, 306, 307 and 308
There are 2 house panels on this building as well for a total of 25 meters.
Steve Reinbrecht
Superintendent
J.C. Hart Company
317-664-0632
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, February 15, 2016 10:48 AM
To: Steve Reinbrecht <steve.reinbrecht@homeisjchart.com>
Subject: FW: Passed meters [T2016020902GPS010Z6005387]
Steve, see below. Duke is asking for the actual unit numbers for building 1 at Lakeside Apartments. The application says there are 20 units, but on
the actual building plans, it shows this is a type-2 building with 24 units (101-106, 201-209 & 301-309)
Can you tell me the actual unit numbers for this building so I can let Duke know?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: INSvcInstall [ mailto:avaya_INSvcInstall@duke-energy.com ]
Sent: Monday, February 15, 2016 10:08 AM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z6005387]
Good morning,
Thank you for replying to our email, we do understand that there are 20 units and the inspection did
cover all 20. Can you please resubdmit a list of the unit numbers the permit is for, or feel free to
contact our office at 1-800-774-0246 for further assistance.
27
Thank you
--- Original Message ---
On February 12, 2016 at 8:32 AM, "Mishler, Nicholas F" wrote:
I only show that building as being 20 units, and the inspection covered all 20.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: INSvcInstall [mailto:avaya_INSvcInstall@duke-energy.com]
Sent: Thursday, February 11, 2016 3:30 PM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z5996224]
Good Afternoon,
We have received the Permit that you sent to us for 12424 Breaklines St, Building 1, for 20 units. We
have applications on file for 24 units. Please resubmit listing the unit numbers that the permit is for.
Please contact us by email or by contacting a customer service representative by calling 1-800-774-
0246 if further assistance is needed. Representatives are available Monday through Friday from 7
a.m. to 5 p.m.
Best regards,
Service Installation Dept
28
Duke Energy
--- Original Message ---
On February 9, 2016 at 4:44 PM, "Mishler, Nicholas F" wrote:
*** Exercise caution. This is an EXTERNAL email. DO NOT open attachments or click links from
unknown senders or unexpected email. ***
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
29
Mishler, Nicholas F
From:INSvcInstall <avaya_INSvcInstall@duke-energy.com>
Sent:Monday, February 15, 2016 10:08 AM
To:Mishler, Nicholas F
Subject:RE: Passed meters [T2016020902GPS010Z6005387]
Good morning,
Thank you for replying to our email, we do understand that there are 20 units and the inspection did
cover all 20. Can you please resubdmit a list of the unit numbers the permit is for, or feel free to
contact our office at 1-800-774-0246 for further assistance.
Thank you
--- Original Message ---
On February 12, 2016 at 8:32 AM, "Mishler, Nicholas F" wrote:
I only show that building as being 20 units, and the inspection covered all 20.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: INSvcInstall [mailto:avaya_INSvcInstall@duke-energy.com]
Sent: Thursday, February 11, 2016 3:30 PM
To: Mishler, Nicholas F
Subject: RE: Passed meters [T2016020902GPS010Z5996224]
30
Good Afternoon,
We have received the Permit that you sent to us for 12424 Breaklines St, Building 1, for 20 units. We
have applications on file for 24 units. Please resubmit listing the unit numbers that the permit is for.
Please contact us by email or by contacting a customer service representative by calling 1-800-774-
0246 if further assistance is needed. Representatives are available Monday through Friday from 7
a.m. to 5 p.m.
Best regards,
Service Installation Dept
Duke Energy
--- Original Message ---
On February 9, 2016 at 4:44 PM, "Mishler, Nicholas F" wrote:
*** Exercise caution. This is an EXTERNAL email. DO NOT open attachments or click links from
unknown senders or unexpected email. ***
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email