Loading...
HomeMy WebLinkAbout253740 01/22/16 �% 4�"''F. CITY OF CARMEL, INDIANA VENDOR: 367635 ONE CIVIC SQUARE PRECISION CONCRETE CUTTING CHECK AMOUNT: $*****1,950.00* s: : CARMEL, INDIANA 46032 1896 GOLDENEYE DRIVE CHECK NUMBER: 253740 9y4TON�°� HOLLAND MI 49424 CHECK DATE: 01/22/16 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 2201 4350900 151235 1,950.00 OTHER CONT SERVICES VOUCHER NO. WARRANT NO. PRECISION CONCRETE CUTTING ALLOWED 20 1896 GOLDENEYE DRIVE IN SUM OF $ HOLLAND, MI 49424 $1,950.00 ON ACCOUNT OF APPROPRIATION FOR Street Department PO#/Dept. INVOICE NO. ACCT#/Fund AMOUNT Board Member 151235 I 43-509.00 I $1,950.00 1 hereby certify that the attached invoice(s), or 2201 201 Prior Year bill(s) is (are)true and correct and that the materials or services itemized thereon for which charge is made were ordered and received except Fr)Jay, January 157 2 16 I StrPE±f Commissioner I Cost distribution ledger classification if claim paid motor vehicle highway fund INVOICE Summary Invoice: 151235 �• Gd �� TFUTlI C Date: 12/21/15 Trip Hazard Removal Specialists Purchase Order: Supplier Number: Job Site: Bill to: Remit to: City of Carmel-Scatter Sites#3 City of Carmel Precision Concrete,Inc. attn:James Hobbs,Streets attn:Dave Huffman,Street Commissioner 1896 Goldeneye Drive 3400 West Main Street 3400 W.Main Street Holland,MI 49424 Carmel IN 46074 Carmel IN 46074 (616)403-1140-phone Work Completed: Phone: (616)582-5951 -fax 18-Dec-15 Fax: Federal ID#:80-0183496 Cost Per Inch Foot $36.00 Job No. - :".i=,y^+ = '�i: #of Trip Linear (Area) Location :'<57 ;T:c Hazards Cut Feet Inch Feet Cost Walkways-Scattered locations on Clearview Dr,Lake Point Dr,Pursel Ln,Lake 1 Forest Pkwy,Rose Ct and Forest Park Ln 25 99.5 75.31 -$2,711.25 25 99.5 75.31 $2,711.25 Approved Project Budget: $1,950.00 Travel and Expenses: . $0.00 Credits/Adjustments: -$761.25 Invoice_Total_(Amount Due): _ " _$1;950.00' Project Name: Sidewalk Trip Hazard Removal 2015 Notes: This invoice is for work completed by Precision Concrete Cutting(PCC)based on the December 6,2015 email accepted by James A Hobbs Work was performed December 4 thru December 9 and December 18,2015 Audit completed,onsite walk thru by Dave Reiner(Precision Concrete)on December 9,2015 PCC removed the trip hazards within specification making a slope according to customer specifications for the specified Areas or Jobs. All concrete has been cut to a neat and uniform finish. Each trip hazard has been cut to a"0"point of differential(0 inch vertical height delta) Each trip hazard has been completely cut all the way to the edges of the walkway(sod and temporary patches removed) All areas around cuts including walkways,grass,and landscaping left clean. Itemized invoicing(Invoice Detail)per cut is attached for your audit. APPROVALS(acceptance of work-completed): Precision Concrete,Inc. Customer Name: Bonnie Bonkowski Name: Position: Administration Office Position: Signature: I Signature: Date: Date: Form:INVOICE 151235 Carmel Scatter Sites 12-2015 form v8 Summary