HomeMy WebLinkAbout253264 01/15/16 CITY OF CARMEL, INDIANA VENDOR: 254004
-
ONE CIVIC SQUARE DUKE ENERGY CHECK AMOUNT: $*•'"40,485.84•
.I, ®
z ?� CARMEL, INDIANA 46032 PO Box 1326 CHECK NUMBER: 253264
9M7reN ;` CHARLOTTE NC 28 201-1 326 CHECK DATE: 01/15/16
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
2201 4348000 167.23 23703824013
2201 4348000 52.67 62903721010
2201 4348000 25.38 70303728013
2201 4348000 9.63 79203824012
2201 4348000 129.36 85503714014
2201 4348000 98.47 95503714010
651 5023990 48.54 22103050026
651 5023990 24.20 22403050010
651 5023990 121.90 26003291013
651 5023990 5,244.40 41103050020
651 5023990 25.61 51503287033
651 5023990 34.79 57303050010
651 5023990 50.16 72003287018
651 5023990 46.90 91103050028
VOUCHER NO. WARRANT NO.
DUKE ENERGY 20
�J��D®� /�
ALLOWED
PO BOX 1326 p( 7" IN SUM OF$
CHARLOTTE, NC 28201-1326
$959.42
ON ACCOUNT OF APPROPRIATION FOR
Street Department
A
PO#/Dept. INVOICE NO. ACCT#/Fund. AMOUNT Board Member
0 43-480.00 49 - 1 hereby certify that the attached invoice(s), or
2201 I 201 I y5`�•�{,l.
bill(s) is (are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Thursday, January 07, 2016
r
Street Commissioner
Cost distribution ledger classification if
claim paid motor vehicle highway fund
VOUCHER NO. WARRANT NO.
ALLOWED 20
Duke Energy
IN SUM OF$
P.O. Box 1326
Charlotte, NC 28201-1326
$131.60
ON ACCOUNT OF APPROPRIATION FOR
Carmel Fire Department
PO#/Dept. INVOICE NO. ACCT#/TITLE AMOUNT Board Members
1120 3960-3050-01-4 43-480.00 $131.60 1 hereby certify that the attached invoice(s), or
bill(s) is (are)true and correct and that the
materials or services itemized thereon for
1
which charge is made were ordered and
received except
JAN I I Zu 16
Fire Chief
Title
Cost distribution ledger classification if
claim paid motor vehicle highway fund
VOUCHER NO. WARRANT NO.
ALLOWED 20
DUKE ENERGY
PO BOX 1326 IN SUM OF$
CHARLOTTE, NC 28201-1326
$12.00
ON ACCOUNT OF APPROPRIATION FOR
Engineering
PO#/Dept. INVOICE NO. ACCT#/Fund AMOUNT Board Members
0 I 42-390.99 I $12.00 1 hereby certify that the attached invoice(s), or
2200 201 Prior Year
bill(s) is (are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Friday, January 08, 2016
Cost distribution ledger classification if
claim paid motor vehicle highway fund
VOUCHER NO. WARRANT NO.
ALLOWED 20
DUKE ENERGY
PO BOX 1326 IN SUM OF$
CHARLOTTE, NC 28201-1326
$194.68
ON ACCOUNT OF APPROPRIATION FOR
Redevelopment Department
PO#/Dept. INVOICE NO. ACCT#/Fund AMOUNT Board Members
I
120815-1 I 43-480.00 I $194.68 1 hereby certify that the attached invoice(s), or
1801 101
bill(s) is (are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Thursday, January 07, 2016
if QnAm'-�ng±4h=
Cost distribution ledger classification if
claim paid motor vehicle highway fund
VOUCHER NO. WARRANT NO.
ALLOWED 20
DUKE ENERGY
PO BOX 1326 IN SUM OF $
CHARLOTTE, NC 28201-1326
$36.64
ON ACCOUNT OF APPROPRIATION FOR
Brookshire Golf Course
PO#/Dept. INVOICE NO. ACCT#/Fund AMOUNT Board Members
5580-3643-01-5 I 43-480.00 I $36.64 1 hereby certify that the attached invoice(s), or
1207 101 Prior Year
bill(s) is (are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Tuesday, January 05, 2016
Cost distribution ledger classification if
claim paid motor vehicle highway fund
VOUCHER # 156937 WARRANT # ALLOWED
254004 IN SUM OF $
DUKE/PSI ENERGY
PO BOX 9001076
Louisville, KY 40290-1076
Carmel Wastewater Utility
ON ACCOUNT OF APPROPRIATION FOR
Board members
PO# INV# ACCT# AMOUNT Audit Trail Code
41103050020 01-7153-05 $5,244.40
aDa03,,)L91oi-3 01 --71 0-03 p l0iII9z)
7aoo3ag7ojq 01 ,7jso.•03 , Sa.i(o
,9al®3o50L13(6 01 , '-715a,03 ; XS ,Sq
g 11030S009r ®i .'-7 iSo-o-3 ;
573030SoD10 of -^7iSO-0-3 � "79
as y03os®
coo ®I �-7fS'o-o-3 , 3y'a6
Voucher Total
Cost distribution ledger classification if
claim paid under vehicle highway fund
VOUCHER NO. WARRANT NO.
___
ALLOWED 20L___
VER|ZONVV|RELES8
IN SUM QF
P. Q. BOX 255O5 --��
LEH|GHVALLEY, PA18DD2-G5O5
$1,385.29
ON ACCOUNT QFAPPROPRIATION FOR
Street Department
BoandMembe/
9758251387 43-441.00 $1,385.29 | hereby certify that the attached inxoioo(o). or
2201 201
biU(o) io(are)true and correct and that the
materials or services itemized thereon for
which charge igmade were ordered and
received except
Friday, January 15. 2O16
Street Commissioner
Cost distribution ledger classification if
claim paid motor vehicle highway fund
|
|
Voucher No. Warrant No. '
254004 Duke Energy Allowed 20____.
POBox 132G
Charlotte, NC 28201-1326
} G
\
ONACCOUNT OF APPROPRIATION FOR
101 General Fund /1f0Facilities '
PO#or INVOICE NO. ACCT#ITITLE AMOUNT Board Members
Dept#
1125 | hereby certify that the attached invoioo(s). ur
1125 bU|(s)is(ae)true and correct and that the
1125 1810-3743-01-6 4348000 $ 22.30 materials or services ite rmzed thereon for
1125 1310-3278-01-0 4348000 $ �hich charge is made were ordered and
1125 3190-3277-01-0 4348000 $ received except
1125 7280-3771-01-5 4348000 $
8740-3794-02-1 4348000 $ 648.90 1
1125 1550-3287-02-9 4348000 $ 157.18_
December 31, 2015
/
PAhcML1hWV
r Signature
Accounts Payable Coordinator
Cost distribution ledger classification if | Tule
` (
claim paid motor vehicle highway fund
'
' 0N
� NN
| `�
Voucher No. Warrant No.
254004 Duke Energy Allowed 20
PO Box 1326
Charlotte, NC 28201-1326
In Sum of$
$ 32,630.38
I
ON ACCOUNT OF APPROPRIATION FOR
101 -General Fund/109-Monon Center
i
PO#or INVOICE NO. ACCT#/TITLE AMOUNT Board Members
Dept#
1125 0600-3660-01-8 4348000 $ 113.12 1 hereby certify that the attached invoice(s), or
1125 7470-3295-01-4 4348000 $ 27.88 bill(s) is (are)true and correct and that the
1125 1650-3050-01-7 4348000 $ 145.32 materials or services itemized thereon for
1125 0990-3736-01-9 4348000 $ 255.96 I which charge is made were ordered and
1125 5260-3287-01-0 4348000 $ 143.78' received except .
1125 3890-3290-02-9 4348000 $ 10.46
1125 4260-3287-01-5 4348000 $ -979.27
1125 1660-3622-01-8 4348000 $ 134.43
6010-3608-01-8 4348000 $ 3,735.02
10:91 5010-3608-01-2 4348000 $ 27,085.14 January 6, 2016
f
I
Signature
$ 32,630.38 Accounts Payable Coordinator
Cost distribution ledger classification if Title
claim paid motor vehicle highway fund
Page 1 of 2
a ins ,
erre alloiin`°
x ,....
Carmel Clay Parks&Recreation Duke Energy 1-800-774-120 "';06U0 3iiti001 8..;
City Of Carmel
Dir 116Th St E
Monon Trail
e .x, a a„ .
PO Box 1326 x x...x.xx. .......x PaymentsafterJan 04 not.
Bill prepare o''0,201
Charlotte NC 28201-1326 Last payment received Dec 14 Next meter reading Jan 29,20 6
P$ :e Igm to
Elec 106950892 Nov 27 Dec 30 33 24858 25785 1 927 0.00
Litt'l'�,,�.- EII t1..-A'. �� aerzuu•• 1 "a�
Usage- 927 kWh_: Amt Due-Previous Bill $93.74
Duke Energy-Rate CSNO $113.12 Payment(s) Received 93.74c
Current Electric Charges $-M-3 Balance Forward —To
Current Electric Charges : 113,12
Current Amount Due
F E'ch l v
JAN - 5 2016
I Me— x
a xx 0e. x.
-71
Average Cost: $0.1220 per kWh Jan 26,2016 $113.12
INUENG
Visit us at www.duke-energy.com
a
-
(�DUKE To view information printed on the back of your bill please click or
ENERGY. go to www.duke-energy.com/indiana/billing/back-of-bill.asp Pa9e 2 of 2
Carmel Clay Parks&Recreation Dir 116Th St E 0600-3660-01-8
City Of Carmel Monon Trail
Electric Duke Energy
Meter- 106950892 Rate CSNO -Commercial Service
Multipliers- 1 Connection Charge $9.40
kWh Usage- 927 Energy Charge
300 kWh 0 $0.08240900 24.72
Nov 27-Dec 30 627 kWh @ $0.07287300 45.69
33 Days Rider 60-Fuel Adjustment
927 kWh 0 $0.01028500 9.53
Rider 61 -Coal Gasification Adj
927 kWh @ $0.01348900 12.50
Rider 62-Pollution Cntl Adj
927 kWh @ $0.00423800 3.93
Rider 63-Emission Allowance
927 kWh @ $0.00008400 0.08
Rider 66-A-Energy Eff Adj
927 kWh @ $0.00021600 0.20
Rider 66- DSM Ongoing
927 kWh 0.00000000 0.00
Rider 67-Cinergy Merger Credit
927 kWh @ $0.00060300cr 0.56cr
-Rider 68-Midwest Ind Sys Oper.Adj
927 kWh @ $0.00229400 2.13
Rider 70-Reliability Adjustment
927 kWh @ $0.00061300 0.57
Rider 71 -Clean Coal Adjustment
927 kWh @ $0.00531600 4.93 $113.12
1e s1 $113.12
kWh Electric Usage
1,000-
0-
600-
400
,000o600400
zoo
0
M M
Calculations based on most recent 12 month history
Total Usage 8,072
Average Usage 673
DEC JAN FEB MA API] MA JUN JUL AUG SEP OC NOV DEC
Electric 9 801 7 68 6 611 53 51 51 738 749 927
i
N%
(.9 DUKE Visit us at www.duke-energy.com
�' ENERGY ,
rave 1 vi e-
uarxe ..c al A G itt
Carmel Clay Parks&Recreation Duke Energy 1-800-521-22327470;3295,01,-4:
City Of Carmel
Outdoor Light Meadow Lark Park
Agi
0 8 G Wit:
PO Box 1326 Payments after Jan 05 not included Bill prepa,edion Jan 05,2016
Charlotte NC 28201-1326 Last payment received Dec 14
Qty 2 Usage-324 kWh n Amt Due-Previous Bill $27.84
Duke Energy Payment(s) Received 27.84c
2 @ Rate SUOL $27.88 Balance Forward
Current OL Charges $ $ Current OL Charges 27.88
Current Amount Due . '
IN N_ MM
.� fy.K
Outdoor Lighting(OL) Duke Energy
Quantity- 2 Rate SUOL -Unmetered Outdoor Ltg Sry
Lumens- 50,000
Type- High Press Sodium Energy Charge
kWh Usage- 324 Energy Charge $14.70
Dec 01 -Jan 04 Lighting Maint Charge 9.00
34 Days Rider 60 Fuel Adjustment 3.38
Rider 61 -Coal Gasification Adj 0.08
Rider 62-Pollution Cntl Adj 0.32
Rider 63-Emission Allowance 0.02
Rider 66-A-Energy Eff Adj 0.08
Rider 67-.Cinergy Merger Credit 0.32cr
Rider 68-Midwest Ind Sys Oper Adj 0.16
Rider 70-Reliability Adjustment 0.06
Rider 71 -Clean Coal Adjustment 0.40
Rider 72-Federally Mand Cost Adj $27.88
oma. x ., ' e $27.88
CEl� .�
JAN - 6 2016 .
BY: - Jan 27,2016 $27.88
&��UKE Visit us at www.duke-energy.com
6Y
(4j DUKE To view information printed on the back of your bill please click or
" ENERGY go to www.duke-enersv.com/indiana/billine/back-of-bill asn Pacle 2 of 2
t
Carmel Clay Parks&Recreation 7470-3295-01-4
City Of Carmel
Outdoor Light Meadow Lark Park
kWh Electric Usage
iso
280-
210-
140-
70-
0
802101407o0
M
Calculations based on most recent 12 month history
Total Usage 3,888
Average Usage 324
JAN FEB MARI AP MAY JUN JUL AUG SEP OC NOV DEC JAN
Electric 32 32 3 32 32 32 32 3-1 32 32-11 324 324 324
DUKE
ENERGY. Visit us at www.duke-energy.com
rage i of i
rak
Carmel Clay Parks&Recreation Duke Energy 1-800-521-2232 1650_3050=0,1�7�■/
City Of Carmel
? .. .........
PO Box 1326 Payments after Dec 30 not included Bill prepare De 0 2015
Charlotte NC 28201-1326 Last payment received Dec 29
�Itrte#Bred. arces..................................................... ufsari#€iittfn::.< < << _> < <>><'< < >>`` => > >
Qty 28 Usage- 1,176 Amt Due- Previous Bill $145.32
Duke Energy- Rate SFS Payment(s) Received 145.32cr
Flasher Signal Sry 145.32 Balance Forward 0.00
Current Unmetered Charges $145.32 Current Unmetered Charges 145.32
Current Amount Due
V $1C45}3
rJBY:
AN -- 4 2016
.......................................... ..........................................
Jan 25,2016 $145.32
UEG www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20151230010101_1.CSV-37825-000014609 0 Printed on recyclable paper.
Page 1 of 2
'to
Carmel Clay Parks&Recreation Duke Energy 1-800-521-2232 =0446:3, di4W
City Of Carmel
11675 Hazel Dell Pkwy
Carmel IN 46033
PO Box 1326 Payments after Jan 04 not included , Bill prepare',Jan 04 201 F.
Charlotte NC 28201-1326 Last payment received Dec 14 Next meter reading lan-29 20'1'6
Elec 093535442 Nov 27 Dec 30 33 2982 5364 1 2,382 0.00
w.t o c .,. u.. t iit
Usage- 2,382 kWh'' Amt Due-Previous Bill $242.60
Duke Energy-Rate CSNO $255.96 Payment(s) Received 242.60c
Current Electric Charges Balance Forward --T.M
Current Electric Charges 255.96,_y
Current Amount Due .$ §M
JAN - 5 2016
BY
.�� `-� -
Average Cost: $0.1075 per kWh Jan 26,2016 $255.96 $263.64
DUKE_.
ENERGY Visit us at www.duke-energy.com
V
DUKE To view information printed on the back of your bill please click or
ENERGY, go to www.duke-energy.com/indiana/billing/back-of-bill.asp Pape 2 of 2
r
Carmel Clay Parks&Recreation 11675 Hazel Dell Pkwy 0990-3736-01-9
City Of Carmel Carmel IN 46033
b
Electric Duke Energy
Meter- 093535442 Rate CSNO -Commercial Service
Multipliers- 1 Connection Charge $9.40
kWh Usage- 2,382 Energy Charge
300 kWh @ $0.08240900 24.72
Nov 27-Dec 30 700 kWh @ $0.07287300 51.01
33 Days 1,382 kWh @ $0.06169600 85.26
Rider 60-Fuel Adjustment
2,382 kWh @ $0.01028500 24.50
Rider 61 -Coal Gasification Adj
2,382 kWh @ $0.01348900 32.13
Rider 62- Pollution Cntl Adj
2,382 kWh @ $0.00423800 10.09
Rider 63-Emission Allowance
2,382 kWh @ $0.00008400 0.20
Rider 66-A-Energyy Eff Adj
2,382 kWh @ $0.00021600 0.51
Rider 66-DSM Ongoing
2,382 kWh 0.00000000 0.00
Rider 67-Cinergy Merger Credit
2,382 kWh @ $0.00060300cr 1.44cr
Rider 68-Midwest Ind Sys Oper Adj
2,382 kWh @ $0.00229400 5.46
Rider 70-Reliability Adjustment
2,382 kWh @ $0.00061300 1.46
Rider 71 -Clean Coal Adjustment
2,382 kWh @ $0.00531600 12.66 $255.96
$255.96
kWh Electric Usage
5,000-
4,000-
31000-
2,000-
1,000-
0-0
,0004,0003,0002,0001,0000
M M
Calculations based on most recent 12 month history
Total Usage 25,445
Average Usage 2,120
DEC JAN FEB MA AP MA JUN JUL AU SEP OC NOV DEC
Electric
3,586 4,6 4,97 3,57 2,05 821 551 395_ 61 1,20 1,968 2,2 2,382
ENERGY Visit us at www.duke-energy.com
Page 1 of 2
:p
Carmel Clay Parks&Recreation Duke Energy 1-800-774-1202�w-3$ D9 329.On02-9�
City Of Carmel
11813 River Ave
Carmel IN 46033
PO Box 1326 Payments after Dec 30 not included Bill prepared on Dec-30-201x5----7
Charlotte NO 28201-1326 Last payment received Dec 14 Next meter reacC'ng*Jan=29—,2616-/
Elec 106957100 Nov 27 Dec 29 32 1098 1107 1 9 0.00
Usage- 9 kWh Amt Due-Previous Bill $10.56
Duke Energy-Rate CSNO $10.46 Payment(s)Received 10.56c
Current Electric Charges $f079 Balance Forward -0
Current Electric Charges 10.46
Current Amount Due
/Jvu `
DEC $ 1 2015
BY:
Average Cost: $1.1622 per kWh Jan 25,2016 $10.46
Visit us at www.duke-energy.com gy.com
('DUKE To view information printed on the back of your bill please click or
ENERGY go to www.duke-energy.com/indiana/billing/back-of-bill.asi) Page 2 of 2
Xi i
Carmel Clay Parks&Recreation 11813 River Ave 3890-3290-02-9
City Of Carmel Carmel IN 46033
Electric Duke Energy
Meter- 106957100 Rate CSNO -Commercial Service
Multipliers- 1 Connection Charge
kWh Usage- 9 Energy Charge $9.40
9 kWh @ $0.08240900 0.74
Nov 27-Dec 29 Rider 60-Fuel Adjustment
32 Days 9 kWh @ $0.01028500 0.09
Rider 61 -Coal Gasification Adj
9 kWh @ $0.01348900 0.12
Rider 62-Pollution Cntl Adj
9 kWh @ $0.00423800 0.04
Rider 63- Emission Allowance
9 kWh @ $0.00008400 0.00
Rider 66-A-Energy Eff Adj
9 kWh @ $0.00021600 0.00
Rider 66-DSM Ongoing
9 kWh 0.00000000 0.00
Rider 67-Cinergy Merger Credit
9 kWh @ $0.00060300cr 0.01cr
Rider 68-Midwest Ind Sys Oper Adj
9 kWh @ $0.00229400 0.02
Rider 70-Reliability Adjustment
9 kWh @ $0.00061300 0.01
Rider 71 -Clean Coal Adjustment
9 kWh @ $0.00531600 0.05 $10.46
11f,.M.
$10.46
kWh Electric Usage
15-
12
9
6
3
0
M M
Calculations based on most recent 12 month history
Total Usage 110
Average Usage 9
DEC JAN FEB MAR APR MAY JUN JUL AU SEP OC NOV DEC
Electric 1 8 11 1 1 9
('DUKE
ENERGY Visit us at www.duke-energy.com
gy
Page 1 of 3
Carmel Clay Parks&Recreation Duke Energy 1.800-774-1202 04260 3287-6-5j/
1411 116Th St E
Carmel IN 46032
e �t
PO Box 1326 Payments after Dec 30 not included Bill prepare,lTonJ'Q_ec-30,2015
Charlotte NC 28201-1326 Last payment received Dec 08 Next meter reading Jan 27,2016
Elec 108036629 Nov 23 Dec 26 33 12023 12307 40 11,360 0.00
Usage- 11,360 kWh Amt Due-Previous Bill $761.93
Duke Energy-Rate RSNO $951.92 Payment(s)Received 761.93c
Current Electric Charges $TST2 Balance Forward --To
Current Electric Charges 951.92
Current OL Charges 27.35
Current Amount Due $ fl
Qty 2 Usage-184 kWh --
Duke Energy
1 @ Rate SOLU $18.20
1 @ Rate SUOL 9.15
Current OL Charges2T5
RECEIVED
DEC 31 2015
BY:
Average Cost: $0.0838 per kWh Jan 25,2016 $979.27
VENO
Visit us at www.duke-energy.com
4Y:I
i'
r'DUKE To view information printed on the back of your billplease click or
ENERGY, go to www.duke-energv.com/indiana/billing/back-of-bill asp Page 2 of 3
Carmel ClayMarksRecreation 1411 116Th St E 4260-3287-01-5
Carmel IN 46032
Electric Duke Energy
Meter- 108036629 Rate RSNO -Residential Service
Multipliers- 40 Connection Charge
kWh Usage- 11,360 Energy Charge $9.40
300 kWh 0 $0.09294500 27.88
Nov 23- Dec 26 700 kWh @ $0.05417800 37.92
33 Days 10,360 kWh @ $0.04446400 460.65
Rider 60 Fuel Adjustment
11,360 kWh @ $0.01028500 116.84
Rider 61 -Coal Gasification Adj
11,360 kWh @ $0.01267300 143.97
Rider 62-Pollution Cntl Adj
11,360 kWh @ $0.00358100 40.68
Rider 63-Emission Allowance
11,360 kWh @ $0.00008400 0.95
Rider 66-A-Energy Eff Adj
11,360 kWh @ $0.00323700 36.77
Rider 66-DSM Ongoing
11,360 kWh 0.00000000 0.00
Rider 67-Cinergy Merger Credit
11,360 kWh 9 $0.00052600cr 5.98cr
Rider 68-Midwest Ind Sys Oper Adj
11,360 kWh @ $0.00203000 23.06
Rider 70-Reliability Adjustment .
11,360 kWh @ $0.00044500 5.06
Rider 71 -Clean Coal Adjustment
11,360 kWh @ $0.00481700 54.72 $951.92
$951.92
Outdoor Lighting(OL) Duke Energy
Quantity- 1 Rate SOLU -Outdoor Lighting Sry
Lumens- 30,000
Type- High Press Sodium Energy Charge
kWh Usage- 104 Lighting Maint Charge. $3.21
Nov 23-Dec 23 Lighting Equip Charge 8.95
30 Days Energy Charge 4.72
Rider 60-Fuel Adjustment 1.07
Rider 61 -Coal Gasification Adj 0.02
Rider 62-Pollution Cntl Adj 0.10
Rider 63-Emission Allowance 0.01
Rider 66-A-Energy Eff Adj 0.02
Rider 67-Cinergy Merger Credit O.10cr
Rider 68-Midwest Ind Sys Oper Adj 0.05
Rider 70- Reliability Adjustment 0.02
Rider 71 -Clean Coal Adjustment 0.13 18.20
Outdoor Lighting(OL) Duke Energy
Quantity- 1 Rate SUOL -Unmetered Outdoor Ltg Sry
Lumens- 8,000
Type- Mercury Vapor Energy Charge
kWh Usage- 80 Energy Charge $3.63
Nov 23-Dec 23 Lighting Maint Charge 4.50
30 Days Rider 60-Fuel Adjustment 0.82
Rider 61 -Coal Gasification Adj 0.02
Rider 62- Pollution Cntl Adj 0.08
Rider 63-Emission Allowance 0.0.1
Rider 66-A-Energy Eff Adj 0.02
Rider 67-Cinergy Merger Credit 0.08cr
Rider 68-Midwest Ind Sys Oper Adj 0.04
Rider 70-Reliability Adjustment 0.01
Rider 71 -Clean Coal Adjustment 0.10 9.15
.- ;
�'
ENERGY. Visit us at www.duke-energy.com
(+�DUKE To view information printed on the back of your bill please click or
ENERGY go to www.duke=energv.com/indiana/billink/back-of-bill.asp Pace 3 of 3
Carmel Clay Parks&Recreation 1411 116Th St E 4260-3287-01-5
Carmel IN 46032
kWh Electric Usage
20,000-
16,000-
12,000-
8,000-
4,000-
0—
J
0,000 16,000 12,0008,0004,0000
M
Calculations based on most recent 12 month history
Total Usage 103,808
Average Usage 8,651
DEG JAN FEB MAR APR1 MAY JUN JUL AUGSEP OCTNOV DEC
Electric 12,8-1 15,7 16, 10, 6,5 8,02 6,224 6,024 6,664 6,584 4,224 8,864 11,544
(•�DUKE
ENERGY Visit us at www.duke-energy.com
Page 1 of 2
City Of Carmel Duke Energy 1-877-499-78 '9 „ %60;;3622 01
Carmel Clay Parks For Account Services,please contact
1235 Central Park Dr E Jessica Jackman
Misc:Lagoon Pum
Carmel IN 46032
...
x
PO Box 1326 Payments after Jan 04 not included Bill prepared on Jan 04C2016;#,
Charlotte NO 28201-1326 Last payment received Dec 14 Next meter reading Jan 29,20 6
Elec 106906084 Nov 30 Dec 30 30 92337 93474 1 1,137 0.00
� ze�iilirx; `;�?
Usage- 1,137 kWh Amt Due-Previous Bill $192.34
Duke Energy-Rate CSNO $134.43 Payment(s) Received 192.34c
Current Electric Charges $� Balance Forward —Tob
Current Electric Charges 134.43
Current Amount Due $ 4 }-
CFED R/
' ]
JAN - 5 2016
LBY
Average Cost: $0.1182 per kWh Jan 26,2016 $134.43
'M
C' DUKE, Visit us at www.duke-energy.com
'S ENERGYa.
t
Pf'DUKE To view information printed on the back of your bill please click or
ENERGY. go to www.duke-energy.com/indiana/billing/back-of-bill.asp Pa e 2 of 2
... :. .. w r .. .............. vo
City Of Carmel 1235 Central Park Dr E 1660-3622-01-8
Carmel Clay Parks Misc:Lagoon Pum
Carmel IN 46032
Electric Duke Energy
Meter- 106906084 Rate CSNO -Commercial Service
Multipliers- 1 Connection Charge $9.40
kWh Usage- 1,137 Energy Charge
300 kWh @ $0.08240900 24.72
Nov 30-Dec 30 700 kWh @ $0.07287300 51.01
30 Days 137 kWh @ $0.06169600 8.45
Rider 60-Fuel Adjustment
1,137 kWh 9 $0.01028500 11.69
Rider 61 -Coal Gasification Adj
1,137 kWh 0 $0.01348900 15.34
Rider 62-Pollution Cntl Adj
1,137 kWh 9 $0.00423800 4.82
Rider 63-Emission Allowance
1,137 kWh 9 $0.00008400 0.10
Rider 66-A-Energy Eff Adj
1,137 kWh @ $0.00021600 0.24
Rider 66-DSM Ongoing
1,137 kWh- 0.00000000 0.00
Rider 67-Cinergy Merger Credit
1,137 kWh 9 $0.00060300cr 0.69cr
Rider 68-Midwest Ind Sys Oper Adj
1,137 kWh 0 $0.00229400 2.61
Rider 70- Reliability Adjustment
1,137 kWh 9 $0.00061300 0.70
Rider 71 -Clean Coal Adjustment
1,137 kWh 9 $0.00531600 6.04 $134.43
ect $134.43
:..
kWh Electric Usage
2,000-
1,600-
1 20
,0001,6001,20
800-
400-
0—
Calculations
004000Calculations based on most recent 12 month history
Total Usage 12,311
Average Usage 1,026
DEC JAN FEB MA APR MA JUN JUL AU SEP OCTNOV DEC
Electric 1,381 1,25 1,18 1,25 1,158 1,19 1,03 388 501 81 659 1,73 1,137
P
DUKE Visit us at www.duke-energy.com
ENERGY
Hill 1
5260 -
Carmel Clay Parks&Recreation Duke1-800-774-1202 328`7--01 0-Energy � ,
1427 116Th St E
Carmel IN 46032
PO Box 1326 Payments after Dec 30 not included Bill preparedlocr30 2015
Charlotte NC 28201-1326 Last payment received Dec 08 Next meter reading J 27
an ,2016
Elec 063601950 Nov 23 Dec 26 33 14331 15725 1 1,394 0.00
.A
Usage- 1,394 kWh Amt Due-Previous Bill $144.91
Duke Energy-Rate RSNO $143.78 Payment(s)Received 144.91 c
Current Electric Charges $ 7$ Balance Forward NO
Current Electric Charges 143.78
Current Amount Due
MIRK, _. _ 7
DEC 31 2015
,BY.
Average Cost: $0.1031 per kWh Jan 25,2016 $143.78
(?KE Visit us at www.duke-energy.com
ENERGY
(�DUKE To view information printed on the back of your bill please click or
ENERGY. go to www.duke-enerizv.com/indiana/billing/back-of-bill.aso Pa e 2 of 2
o
Carmel Clay Parks&Recreation 1427 116Th St E 5260-3287-01-0
Carmel IN 46032
Electric Duke Energy
Meter- 063601950 Rate RSNO -Residential Service
Multipliers- 1 Connection Charge $9 9.40
kWh Usage- 1,394 Energy Charge
300 kWh @ $0.09294500 27.88
Nov 23 Dec 26 700 kWh @ $0,05417800 37.92
33 Days 394 kWh @ $0.04446400 17.52,' .
Rider 60-Fuel Adjustment
1,394 kWh @ $.0.01028500 14.34
Rider 61 -Coal Gasification Adj
1,394 kWh @ $0.01267300 17.67
Rider 62-Pollution Cntl Adj
1,394 kWh @ $0.00358100 4.99
Rider 63-Emission Allowance
1,394 kWh @ $0.00008400 0.12
Rider 66-A-Energ Eff Adj
1,394 kWh $0.00323700 4.51
Rider 66-DSM Ongoing
1,394 kWh 0.00000000 0.00
Rider 67-Cinergy Merger Credit
1,394 kWh @ $0.00052600cr 0.73cr
Rider 68-Midwest Ind Sys Oper Adj
1,394 kWh @ $0.00203000 2.83
Rider 70-Reliability Adjustment
1,394 kWh @ $0.00044500 0.62
Rider 71 -Clean Coal Adjustment
1,394 kWh @ $0.00481700 6.71 $143.78
t' $143.78
kWh Electric Usage
2,500
2,000
1,500-
1,000-
500
,5001,000500
0
M M
4
Calculations based on most recent 12 month history
Total Usage 16,410
Average Usage 1,368
DEC JAN FEB MA AP MA JUN JUL AU SEP OC NOV DEC
Electric 1,04 9 9 1,03 1,04 1,10 1,90 1,790 2,04 1,67 1,129 1,40 1,394
('DUKE
ENERGY Visit us at www.duke-energy.com
Page 1 of 2
to 0 ON 58 XMIM11,11,
l,.
City Of Carmel Duke Energy 1-800-774-120216010=360801
Carmel Clay Parks
1235 Central Park Dr E
Misc:Main Bldg
Carmel IN 46032
PO Box 1326 Payments after Jan 04 not included Bill prepar don�Jan04;2016;.
Charlotte NC 28201-1326 Last payment received Dec 14 Next meter�r`eading-Jan 29;2016
Elec 106940254 Nov 25 Dec 29 34 44,981
On Peak 84.50
u
Ur ----------------- -------- ---
Usage- 44,981 kWh 13.00 War Amt Due-Previous Bill $2,832.96
Duke Energy-Rate LSN0 $3,735.02 Payment(s) Received 2,832.96c
Current Electric Charges Balance Forward �t)�
Current Electric Charges3,7,35.02,
Current Amount Due 5 0
=- 5
Average Cost: $0.0830 per kWh Jan 26,2016 $3,735.02
DUKE,
ENERGY_, Visit us at www.duke-energy.com
�('DUKE To view information printed on the back of your bill please click or
►' ENERGY go to www.duke-energv.com/indiana/billing/back-of-bill.asp Pape 2 of 2
F
c
City Of Carmel 1235 Central Park Dr E 6010-3608-01-8
Carmel Clay Parks Misc:Main Bldg
Carmel IN 46032
Electric Duke Energy
Meter- 106940254 Rate LSNO -Low Load Factor Sec Sry
kWh Usage- 44,981 Connection Charge $15.00
Actual kW- 84.50 Energy Charge
Actual kVa- 85.50 300 kWh @ $0.10788900 32.37
Billed Kvar- 13.00 700 kWh @ $0.08688900 60.82
Power Factor- 98.8% 1,500 kWh @ $0.07798900 116.98
13,555 kWh @ $0.05818900 788.75
Date of Peak 12/04/2015 Load Factor-Next 110 Hrs Use
Time of peak 07.00.00 9,295 kWh @ $0.05158800 479.51
Load Factor-Over 300 Hrs Use
Nov 25-Dec 29 19,631 kWh @ $0.04678900 918.51
34 Days KVAR Charge
13.00 Kvar @ $0.24000000 3.12
Rider 60-Fuel Adjustment
44,981 kWh @ $0.01028500 462.63
Rider 61 -Coal Gasification Adj
44,981 kWh @ $0.01000200 449.90
Rider 62-Pollution,Cntl Adj
44,981 kWh @ $0.00321700 144.70
Rider 63- Emission Allowance
44,981 kWh @ $0.00008400 3.78
Rider 66-A-Energy Eff Adj
44,981 kWh @ $0.00021600 9.71
Rider 66-DSM Ongoing
44,981 kWh 0.00000000 0.00
Rider 67-Cinergy Merger Credit
44,981 kWh @ $0.00029500cr 13.27cr
Rider 68-Midwest Ind Sys Oper Adj
44,981 kWh 0 $0.00154600 69.54
Rider 70-Reliability Adjustment
44,981 kWh @ $0.00046400 20.87
Rider 71 -Clean Coal Adjustment
44,981 kWh @ $0.00382600 172.10 $3,735.02
„ ., $3,735.02
kWh Electric Usage
150,000
120,000- a
m-
90,00060,0004�
30,0000
M
Calculations based on most recent 12 month history
Total Usage 784,800
Average Usage 65,400
DEC JAN FEB MA AP MA JUN JUL AUG SEP OC NOV DEC
Sectric 48,4 53,1 50,551 43,60 28,37 62,55 121,83 131,989 106,40 71,071 37,2 33,09 44,981
4'DUKE Visit us at www.duke-energy.com
ENERGY
Page 1 of 2
t333YEOWNco7xn
City Of Carmel Duke Energy 1-877-499-7859 X501.0 3608-U1 2
Carmel Clay Parks For Account Services,please contact
1235 Central Park Dr E Jessica Jackman
Carmel IN 46032
PO Box 1326x Payments after Jan04not included Bill YpreparedJan�04,2016-----
Charlotte NC 28201-1326 Last payment received Dec 14 Next meter reading Jan 29,2016
i::!:!!::li: ::; I
=
Elec 108068377 Nov 25 Dec 29 34 358,924
On Peak 708.00
Usage- 358,924 kWh 708.00 kW Amt Due-Previous Bill $25,579.75
341.60 War Payment(s)Received 25,579.75c
Duke Energy-Rate HSNO $27,085.14 Balance Forward 0.00
Current Electric Charges Current Electric Charges 27,0_85.14_
Current Amount Due17
$ ..
JAN - 5 2016
Y.
31.
Average Cost: $0.0755 per kWh Jan 26,2016 $27,085.14
DUKE.,
r Visit us at www.duke-energy.com
F:NERG^ �
DUKE To view information printed on the back of your bill please click or
ENERGY go to www.duke-enerpv.com/indiana/billing/back-of-bill.asp Pa e 2 of 2
City Of Carmel 1235 Central Park Dr E 5010-3608-01-2
Carmel Clay Parks Carmel IN 46032
7'.'..JL'1Afe
Duke Energy
108068377 Rate HSNO -High Load Factor Sec Sry
358,924 Connection Charge $15.00
708.00 Demand Charge
Actual kVa- 786.10 708.00 kW @$14.06000000 9,954.48
Billed Kvar- 341.60 Energy Charge
Power Factor- 90.1 i 358,924 kWh @ $0.01683000 6,040.69
KVAR Charge
341.60 Kvar @ $0.24000000 81.98
Date of Peak 12/23/2015 Rider 60-Fuel Adjustment
Time of peak 12.30.00 358,924 kWh Co) $0.01028500 3,691.53
Nov 25-Dec 29 Rider 61 -Coal Gasification Adj
34 Days 708.00 kW @ $5.51965200 3,907.91
Rider 62-Pollution Cntl Adj
708.00 kW @ $1.71739000 1,215.91
Rider 63-Emission Allowance
358,924 kWh 9 $0.00008400 30.15
Rider 66-A-Energy Eff Adj
358,924 kWh @ $0.00021600 77.52
Rider 67-Cinergy Merger Credit
358,924 kWh @ $0.00033300cr 119.52cr
Rider 68-Midwest Ind Sys Oper Adj
358,924 kWh @ $0.00153800 552.03
Rider 70-Reliability Adjustment
358,924 kWh @ $0.00050000 179.46
Rider 71 -Clean Coal Adjustment
708.00 kW 9 $2.05932300 1,458.00 $27,085.14
o trr $27,085.14
kWh Electric Usage
500,000-
400,000-
300,000
00,000400,000300,000 NAL E
200,000
100,000
0
M MM
Calculations based on most recent 12 month history
Total Usage 4,835,479
Average Usage 402,957
DEC JAN FEB MA AP MA JUN JU AUG SEP OC NOV DEC
Electric 396,27
388,264368,73 369,37 365,33 416,01 491,59 491,326 463,41 452,79 353,31316,3 358,924
4S DUKE Visit us at www.duke-energy.com
ENERGY
City Of Carmel Duke Energy 1.877-499-7859 2810 343_-0�1
Carmel Clay Parks For Account Services,please contact
1235 Central Paris Dr E Jessica Jackman
Misc:Shelter
Carmel IN 46032
i
PO Box 1326 Payments after Dec 30 not included Bill prepared OP, 30.,20;15
Charlotte NC 28201-1326 Last payment received Dec 08 Next meter reading Jan 27,2016
Elec 039451247 Nov 23 Dec 26 33 28721 29493 1 772 0.00
i � riiQ. 'trlt
Usage- 772 kWh Amt Due-Previous Bill $86.03
Duke Energy-Rate CSNO .$96.24 Payment(s)Received 86.03c
Current Electric Charges $ � Balance Forward --T.M
Current Electric Charges 96:24,
Current Amount Due ,`
TVFD
DEC 1 X015
BY:
Q
Average Cost: $0.1247 per kWh Jan 25,2016 $96.24 $99.13
('DE
ENEVisit us at www.duke-energy.com
RG`T;W
j'DUKE To view information printed on the back of your bill please click or
ENERGY go to www.duke-energy.cam/indiana/billink/back-of-bill.asp Pa e 2 of 2
City Of Carmel 1235 Central Park Dr E 2810-3743-01-1
Carmel Clay Parks Misc:Shelter
Carmel IN 46032
Electric Duke Energy
Meter- 039451247 Rate CSNO -Commercial Service
Multipliers- 1 Connection Charge $9.40
kWh Usage- 772 Energy Charge
300 kWh @ $0.08240900 24.72
Nov 23-Dec 26 472 kWh @ $0.07287300 34.40
33 Days Rider 60-Fuel Adjustment
772 kWh @ $0.01028500 7.94
Rider 61 -Coal Gasification Adj
772 kWh @ $0.01348900 10.41
Rider 62-Pollution Cntl Adj
772 kWh @ $0.00423800 3.27
Rider 63-Emission Allowance
772 kWh @ $0.00008400 0.06
Rider 66-A-Energy Eff Adj
772 kWh 9u $0.00021600 0.17
Rider 66-DSM Ongoing
772 kWh 0.00000000 0.00
Rider 67-Cinergy Merger Credit
772.kWh @ $0.00060300cr 0.47cr
Rider 68-Midwest Ind Sys Oper Adj
772 kWh @ $0.00229400 1.77
Rider 70-Reliability Adjustment
772 kWh @ $0.00061300 0.47
Rider 71 -Clean Coal Adjustment
772 kWh @ $0.00531600 4.10 $96.24
11 9M
$9624
kWh Electric Usage
1,000-
60'_
,000 600
400
200
'am WM
Calculations based on most recent 12 month history
Total Usage 6,932
Average Usage 578
DEC JAN FEB MA AP MA JUN JUL AU SEP OC NOV DEC
E
66 69 67 59 551 501 46 467 5 450 678 772
r"
t'DUE Visit us at www.duke-energy.com
Page 1 of 2
City Of Carmel Duke Energy 1-500-521-2232 181`-0 343=01 6
Carmel Clay Parks
1235 Central Park Dr E
Misc:Lighting
Carmel IN 46032
PO Box 1326 Payments after Dec 30 not included Bill prepared on Dec 30 20:15
Charlotte NC 28201-1326 Last payment received Dec 08 Next meter reatli g Jan s7;2016
Elsc 038130351-- -Nov-23 Dec 26 33 } 4383 4492 1 109 0.00
Usage- 109 kWh Amt Due-Previous Bill $20.65
Duke Energy-Rate CSNO $22.30 Payment(s)Received 20.65c
Current Electric Charges Balance Forward —T.'M
Current Electric Charges 22.3.0
Current Amount Due
7a rC
D�� 3 1 2015
Average Cost: $0.2046 per kWh Jan 25,2016 $22.30 $22.97
('DUKE
ENERGYx Visit us at www.duke-energy.com
(>DUKE To view information printed on the back of your billplease click or
ENERGY go to www.duke-energy.com/indiana/billing/back-of-bill.asp Pa e 2 of 2
City Of Carmel 1235 Central Park Dr E 1810-3743-01-6
Carmel Clay Parks Misc:Lighting
Carmel IN 46032
Electric Duke Energy
Meter- 038130351 Rate CSNO -Commercial Service
Multipliers- 1 Connection Charge $9.40
kWh Usage- 109 Energy Charge
109 kWh Co-) $0.08240900 8.98
Nov 23-Dec 26 Rider 60-Fuel Adjustment
33 Days 109 kWh @ $0.01028500 1.12
Rider 61 -Coal Gasification Adj
109 kWh 0 $0.01348900 1.47
Rider 62-Pollution Cnti Adj '
109 kWh 0 $0.00423800 0.46
Rider 63-Emission Allowance
109 kWh 0 $0.00008400 0.01
Rider 66-A-Energy Eff Adj
109 kWh 0 $0.00021600 0.03
Rider 66-DSM Ongoing _
109 kWh - 0,00000000 000 -
_ Rider 67-Cinergy Merger Credit_ --
109 kWh @ $0.00060300cr 0.07cr
Rider 68-Midwest Ind Sys Oper Adj
109 kWh Co) $0.00229400 0.25
Rider 70- Reliability Adjustment
109 kWh @ $0.00061300 0.07
Rider 71-Clean Coal Adjustment
109 kWh @ $0.00531600 0.58 $22.30
kWh Electric Usage
150-
1 0
501200so300Calculations based on most recent 12 month history
Total Usage ' 1,067
Average Usage 89
DEC JAN FEB MAR AP MA JUN JUL AU SEP OC NOV DEC
Bectric 1 12 1 as 71 8 8 109
z--
tENERGY Visit us at www.duke-energy.com
Page 1 of 2
Carmel Clay Parks&Recreation Duke Energy 1-800-521-222 8740-3794`=U2
11675 Hazel Dell Pkwy
Misc:Pavilion
Carmel IN 46033
e _
PO Box1326Payments after Jan 04 not included Bill prep red on�Jari 04K�kRQ
Charlotte NC 28201-1326 Last payment received Dec 14 Next me Ore ding Jan 29, 016
i ...
:,
Elec 106959482 Nov 27 Dec 30 33 2158 2326 40 6,720 21.20
t,
WOMMEMM
Usage- 6,720 kWh- 2.00 kVar Amt Due-Previous Bill $512.65
Duke Energy-Rate LSNO $648.90 Payment(s) Received 512.65c
Current Electric Charges Balance Forward Tb
Current Electric Charges 648.90
Current Amount Due
F
' CE' TVEl D
JAN - 5 2016
Average Cost: $0.0966 per kWh Jan 26,2016 $648.90
fflDVisit us at www.duke-energy.comGY-
J
(�DUKE To view information printed on the back of your billpplease click or
ENERGY go to www.duke eneri v.com/indiana/billins/back of-bill.asp PaRe 2 of 2
q°
Carmel Clay Parks&Recreation 11675 Hazel Dell Pkwy 8740-3794-02-1
Misc:Pavilion
Carmel IN 46033
Electric Duke Energy
Meter- 106959482 Rate LSNO -Low Load Factor Sec Stv
Multipliers- 40 Connection Charge $15.00
kWh Usage- 6,720 Energy Charge
Demand Read- 00.53 300 kWh @ $0.10788900 32.37
Actual kW- 21.20 700 kWh @ $0.08688900 60.82
Billed Kvar- 2.00 1,500 kWh @ $0.07798900 116.98
Power Factor- 99.5% 1,528 kWh @ $0.05818900 88.91
Load Factor-Next 110 Hrs Use
Nov 27-Dec 30 2,332 kWh @ $0.05158800 120.30
33 Days Load Factor-Over 300 Hrs Use
360 kWh @ $0.04678900 16.84
KVAR Charge
2.00 Car 0 $0.24000000 0.48
Rider 60- Fuel Adjustment
6,720 kWh @ $0.01028500 69.12
Rider 61 -Coal Gasification Adj
6,720 kWh- @ $0.01000200 67.21
' Rider 62-Pollution Cntl Adj
6,720 kWh @ $0.00321700 21.62'
Rider 63-Emission Allowance
6,720 kWh 0 $0.00008400 0.56
Rider 66-A-Energy Eff Adj
6,720 kWh @ .$0.00021600 1.45
Rider 66-DSM Ongoing
6,720 kWh 0.00000000 0.00
Rider 67-Cinergy Merger Credit
6,720 kWh @ $0.00029500cr 1.98cr
Rider 68-Midwest Ind Sys Oper Adj
6,720 kWh 0 $0.00154600 10.39
Rider 70-Reliability Adjustment
6,720 kWh @ $0.00046400 3.12
Rider 71 -Clean Coal Adjustment
6,720 kWh 0 $0.00382600 25.71 $648.90
$648.90
kWh Electric Usage
10,000-
8,000-
6,000-
4,000-
2,000-
M
0,0008,0006,0004,0002,000M M
Calculations based on most recent 12 month history
Total Usage 60,520
Average Usage 5,043
DEC JAN-' FEB MA AP MA JUN JUL AUG SEP OC NOV DEC
Electric 6,72 6,16 6,84 5,20 2,66 2,40 4,16 4,280 4,520 4,32 4,200 5,040 6,720
(�DUKE Visit us at www.duke-energy.com
ENERGY,
i Nage i of 1
tii ttl .
:...:.........:::::.::; ...
.::::::::::::.::::::::::::::::::.:.:::.:: .::::::::::::.:::::::,::::::::::::::::.............. ...........................................
Carmel Clay Parks&Recreation Duke Energy 1.800-774-1202550 33281-02=9'
1507 116Th St E
Carmel IN 46032
PO Box 1326 Payments after Dec 30 not included Bill prepar on Dec 30�20f5"L
Charlotte NC 28201-1326 Last payment received Dec 14 Next meter readin U h 27 2016
Elec 108226582 Nov 23 Dec 26 33 2552 3922 1 1,370 0.00
Usage- 1,370 kWh Amt Due- Previous Bill $ 149.17
Duke Energy- Rate CSNO $ 157.18 Payment(s) Received 149.17cr
Current Electric Charges $157.18 Balance Forward 0.00
Current Electric Charges 157.18
Current Amount Due
JAN -- 4 2016
BY:
..................
e>Ir
<` < a >'
Avera- Cost: $0.1147 per kWh Jan 25,2016 $157.18 $161.90
MENwww.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20151230010101_1.CSV-37827-000014608 Printed on recyclable paper.
Page 1 of 2
>< ....
City Of Carmel Duke Energy 1-877-499-7859 2240-3050-01-0
3417 116Th St E For Account Services,please contact
Carmel IN 46033 Jessica Jackman
PO Box 1326 Payments after Dec 30 not included Bill prepared on Dec 30,2015
Charlotte NC 28201-1326 Last payment received Dec 21 Next meter reading Jan 27,2016
>< letrRend%n=>::
IIEfeer >' �uirimier :1tuti>:>:<:>::: >::>«=::>
Elec 108051372 Nov 23 Dec 24 31 63 64 80 80 0.00
«<::<: :::=:::;:`:.. :::`::::::>: iirt #1 �8
Usage- 80 kWh Amt Due- Previous Bill $24.20
Duke Energy- Rate SWP $24.20 Payment(s) Received 24.20cr
Current Electric Charges 24.20 Balance Forward 0.00
Current Electric Charges 24.20
L5 9 Current Amount Due 24.20
.......................................... ..........................................
.......................................... ..........................................
.......................................... ..........................................
.......................................... ..........................................
.......................................... ..........................................
.......................................... ..........................................
.......................................... ..........................................
Average Cost: $0.3025 per kWh Jan 25,2016 $24.20
ENERGY. www.duke-energy.com
BM BWDEMW.DUKE.INREG.20151230010101_1.CSV-17263-000023134 Printed on recyclable paper.
Nage 1 of 1
>< <> rCi lri1.0
1> > ><> < » ` 1ccatii#tl# <
City Of Carmel Duke Energy 1-877-499-7859 5150-3287-03-3
Carmel Utilities For Account Services,please contact
11511 Westfield Blvd Jessica Jackman
Carmel IN 46032
Tt> ><:»:> t ' `' `«'< ` ; ` '< `< > ><>>' >>'1�►cut`lvta3i<>>>>`>`"<`>> < >< '<< < > <><
PO Box 1326 Payments after Dec 30 not included Bill prepared on Dec 30,2015
Charlotte NC 28201-1326 Last payment received Dec 21 Next meter reading Jan 27,2016
IVietr:> >:N��i�s ::€:l ::
Elec 077707179 Nov 23 Dec 26 33 1069 1206 1 137 0.00
<<'>'>':>< '»><>» >> >>`:`=>:` >...........................: : > ><<`>=>` > '«' .
Usage- 137 kWh Amt Due- Previous Bill $22.40
Duke Energy- Rate CSNO $25.61 Payment(s) Received 22.40cr
Current Electric Charges 25.61 Balance Forward 0.00
Current Electric Charges 25.61
I y Current Amount Due 25.61
S 01- -71sv � � ?
Average Cost: $0.1869 per kWh Jan 25,2016 $25.61
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20151230010101_1.CSV-17135-000023166 Printed on recyclable paper.
puhAvhmE]UKm[HE/orrvx/mwm^/*,vuxPAYMENT
Page 1of2
City[fCarmel Duke Energy 1-877-499-7859 6730'3050-01'0
Carmel Utilities For Account Services,please contact
889Bridle Cir Jessica Jackman
Carmel |N46O32
POBox 1320 Payments after Dec 10not included Bill prepared nnDec 1n.un1s
Charlotte NC282O11320 Last payment received Dec on Next meter reading Jan 1o.001n
................ jowl
Bec 108080123 Nov 13 Dec 17 34 8260 8443 1 183 0.62
Usage- 183 kWh Amt Due- Previous Bill
Duke Energy- Rate SWP $34.79 Payment(s) Received
Current Electric Charges �-34.79 Balance Forward 0.00
Current Electric Charges 34.79
Current Amount Due �--34.7,q�/.~��
$0'1901 9erkWh
4 DUKE
ENERGY. www.duke-energy.com
BM-BW ocMmuoxs./wpca.zo1o,x/oo1o1o11.ouv+o849-mo00,o82 @ Printed onmqm/uu/opaper.
----.._._. ...._._. ._...._.........__........._.. Page 1 of 1
;................................... s>>> > >>
........................> >>' r't a r ; ` .............> ` > < ' > u s mow
City Of Carmel Duke Energy 1-877-499-7859 9110-3050-02-8
Carmel Utilities For Account Services,please contact
Carmel Water Works Jessica Jackman
11468 Wood Creek Dr
Carmel IN 46033
` '' ?` 3isi=i`'>"E` < ?C I�G..�3
::::;:::;:::::::::..:<:::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::::::::......::.....
PO Box 1326 Payments after Dec 29 not included Bill prepared on Dec 29,2015
Charlotte NC 28201-1326 Last payment received-Dec 21 Next meter reading Jan 26,2016
etifir'Rede ' `:'>> ' <<>'» > > »><> > <` ><>
:i�:.;
Elec 106939238 Nov 21 Dec 23 32 41500 41801 1 301 1.29
>>s >
Usage- 301 kWh Amt Due- Previous Bill $43.61
Duke Energy- Rate SWP $46.90 Payment(s) Received 43.61cr
Current Electric Charges 46.90 Balance Forward 0.00
Current Electric Charges 46.90
Current Amount Due 46.90 -
Mg
> ie:::::> >
Average Cost: $0.1558 per kWh Jan 20,2016 $46.90
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20151229010101_1.CSV-56769-000009704 e*Printed on recyclable paper.
----.._._......._._. ._...._........ ._........ Page 1 of 1
City Of Carmel Duke Energy 1-877-499-7859 2210-3050-02-6
Carmel Utilities For Account Services,please contact
4879 Woodfield Dr Jessica Jackman
Carmel IN 46033
PO Box 1326 Payments after Dec 17 not included Bill prepared on Dec 17,2015
Charlotte NC 28201-1326 Last payment received Dec 08 Next meter reading Jan 15,2016
Il�e�r<::><::�]ui��ter�< <:��oiti:>:>:?:fi'o>>�:»> :<:Da:s:»a���v�+our<::F�res�if:»::»a�tfrtl�:>::>:>:>::1�•s���>:<'::::>:>�:>»>:>ft<W:<::><:>::
Elec 108036934 Nov 11 Dec 15 34 20142 20459 1 317 1.27
:<
Usage- 317 kWh Amt Due- Previous Bill $40.75
Duke Energy- Rate SWP $48.54 Payment(s) Received 40.75cr
Current Electric Charges 48.54 Balance Forward 0.00
Current Electric Charges 48.54
Current Amount Due V48.54
c�a. K0. 03
Average Cost: $0.1531 per kWh Jan 8,2016 $48.54
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20151217010101_1.CSV-38759-000007117 0 Printed on recyclable paper.
'-------'-- '--'-- -''--~'' Page 1of1
City Of Carmel Duke Energy 1'877'499'7850 7200'3287'01'8
Carmel Utilities For Account Services,please contact
Dir Gray Rd Jessica Jackman
POBox 132O Payments after Dec 3Unot included Bill prepared onDec 3O.2o1S
Charlotte NC 28201'1328 Last payment received Dec u1 Next meter reading Jan u7.uu16
Beo 108083835 Nov 23 Dec 26 33 11728 12061 1 833 1.17
Usage- 333 kWh Amt Due- Previous Bill $41.02
Duke Energy- Rate SWP $50.16 Payment(s) Received 41.02cr
Current Electric Charges —50.16 Balance Forward . 0.00
Current Electric Charges 50.16
Current Amount Due F5—0.16
c) / -71.5 0
Average Cost: $Q.150G per kWh Jan 25,2016 $50.16
DUKE�������,
.~ �. "�"~`�^. u ke no«m.ovm
oM-vvxncmeuoxs./wpso.zv1o12,ov1v1o,-1.00v1nm*ou02o1e 0Printed unrecyclable paper.
_
uy— . —
tatilddss< «'<'< < <<> < < >'<'<'> <' iwrt
City Of Carmel Duke Energy 1-877-499-7859 2600-3291-01-3
Carmel Utilities For Account Services,please contact
12501 Pennsylvania St N Jessica Jackman
Carmel IN 46032
rfqmbini
Account.Inila<Itlxtiii«>>`i >`>' >> >`
PO Box 1326 Payments after Dec 30 not included Bill prepared on Dec 30,2015
Charlotte NC 28201-1326 Last payment received Dec 21 Next meter reading Jan 29,2016
I.. .
Elec 108080014 Nov 25 Dec 29 34 44009 45041 1 1,032 3.31
: :.............................................` a >' < : >: : r > >>> >><» « > <<'<` '> <<> > :
Usage- 1,032 kWh Amt Due- Previous Bill $ 111.54
Duke Energy- Rate SWP $121.90 Payment(s) Received 111.54cr
Current Electric Charges $121.90 Balance Forward 0.00
Current Electric Charges 121.90
ICurrent Amount Due $121.90
......... .............
......................:......... .............................
Ceara< <<> fnw [Elue €`: ;
Average Cost: $0.1181 per kWh Jan 25,2016 $121.90
f4
ENERGY. www.duke-energy.com '
BM Printed on recyclable paper.
PLEASE RETURN THE TOP PORTION WITH YOUR PAYMENT
Page 1of1
City OfCarmel Duke Energy 1'877'499-7859 4118'3060'02'0
Carmel Utilities For Account Somioea.please contact
Carmel Water Works Jessica Jackman
10601 Hazel Dell Pkwy
Carmel |N48O33
POBox 132O Payments after Dec xunot included Bill prepared unDec on.un1s
Charlotte NC 28201-1326 Last payment received Dec ui Next meter reading Jan e7.uo1V
Beo 108208788 Nov 23 Dec 23 30 73,428
On Peak 25870
Usage- 73,429 kWh Amt Due- Previous Bill $4,995.17
Duke Energy- Rate SWP $5,244.40 Payment(s) Received 4,995.17cr
Current Electric Charges —5'-5,244.40 Balance Forward 0.00
Current Electric Charges 5,244.40�
U�
_-
.
Average Cost: $D.D714 per kWh Jan 19,2016 $5,244.40
[�0��
��,^�
ENERGY w°^mduko'onomm�ovm
u�Beoswvxooxs./wxso.co1x1oomv1v1-,.00v~7,w�o�o �m ��Printed onrecyclable paper.
Page 1 of 3
4 a ii l v d€ <> <...... `u s'> ' '<`< << 1 tt l l eit<
City Of Carmel Duke Energy 1-800-521-2232 5580-3643-01-5
Brookshire Golf Club
::.::... ..... ::::::.::.::::::::::::::::::::::::::Acunt.� Ecrfna ::. ::.:.:::::::::::::::::::::._:._::::
::::::::::::::::.: :::::::.: :::.::::: :::::.:..:::::.::::::::::::::::::::::::::::::
PO Box 1326 Payments after Dec 30 not included Bill prepared on Dec 30,2015
Charlotte NC 28201-1326 Last payment received Dec 14
Qty 4 Usage-321 kWh Amt Due- Previous Bill $36.64
Duke Energy Payment(s) Received 36.64cr
4 @ Rate SUAL $36.64 Balance Forward 0.00
Current Street Light Charges 36.64 Current Street Light Charges 36.64
Current Amount Due 36.64
L000-d-LZ80£ gZ49ZooOO-t699b'AS0'L LOLotooeZL9LOZ'93HNI'3Nn0'MIN30'M9 We ®A0213N3
woo,maue-e�np'MMM avnn`�/
DUKE ENERGY
................................... Page2of3
City Of Carmel 5580-3643-01-5
Brookshire Golf Club
:::::::::::. ......:..::...............:................:.....................................
' '» »: « < ::::: : :»:»> «'" »
......... :...........
Street Lights Duke Energy
Quantity- 1 Rate SUAL -Unmetered Outdoor Ltg Sry
Lumens - 30,000
Type- High Press Sodium Energy Charge
kWh Usage- 102 102 kWh 0 $0.04538700 $4.63
Unit kW- 0.305 Lighting Maint Charge
3 Burn Hours- 333.33 1 Units 0 4.50000000 4.50
Nov 25- Dec 29 Rider 60- Fuel Adjustment
34 days 102 kWh 0 $0.01028500 1.05
Rider 61 -Coal Gasification Adj
102 kWh 0 $0.00023400 0.02
Rider 62- Pollution Cntl Adj
102 .kWh 0 $0.00099500 0.10
Rider G0- Lim:ss-on.-Allowance
102 kWh 0 $0.00008400 0.01
Rider 66-A- Energy Eff Adj
102 kWh 0 $0.00021600 0.02
Rider 67-Cinergy Merger Credit
102 kWh 0 $0.00098200cr 0.10cr
Rider 68-Midwest Ind Sys Oper Adj
102 kWh @ $0.00046400 0.05
Rider 70- Reliability Adjustment
102 kWh @ $0.00018000 0.02
Rider 71 -Clean Coal Adjustment
102 kWh 0 $0.00122100 0.12 $ 10.42
Duke Energy
Quantity- 2 Rate SUAL -Unmetered Outdoor Ltg Sry
Lumens - 16,000
Type- High Press Sodium Energy Charge
kWh Usage- 117 117 kWh 0 $0.04538700 $5.31
Unit kW- 0.176 Lighting Maint Charge
Burn Hours- 333.33 2 Units Co) 4.50000000 9.00
Nov 25- Dec 29 Rider 60- Fuel Adjustment
34 days 117 kWh 0 $0.01028500 1.20
Rider 61 -Coal Gasification Adj
117 kWh 0 $0.00023400 0.03
Rider 62- Pollution Cntl Adj
117 kWh @ $0.00099500 0.12
Rider 63- Emission Allowance
117 kWh 0 $0.00008400 0.01
Rider 66-A- Energy Eff Adj
_117 -kWh__$0.00021600 0.03.
Rider 67-Cinergy Merger Credit
117 kWh 0 $0.00098200cr 0.11 cr
Rider 68-Midwest Ind Sys Oper Adj
117 kWh 0 $0.00046400 0.05
Rider 70- Reliability Adjustment
117 kWh 0 $0.00018000 0.02
Rider 71 -Clean Coal Adjustment
117 kWh 0 $0.00122100 0.14 15.80
ENERGY. www.duke-energy
.com
BM BW DEMW.DUKE.INREG.20151230010101 1.CSV4655-000028425
Printed on recyclable paper.
Page 1 of 1
------------
City Of Carmel Duke Energy 1-800-521-2232 7010-3295-05-8
457 3Rd Ave SW
Carmel IN 46032
PO Box 1326 Payments after Dec 08 not included Bill prepared on Dec 08,2015
Charlotte NC 28201-1326 Last payment received Nov 23 Next meter reading Jan 06,2016
:>Actt.... :.....
........ tef......
:: .....
Elec 108068556 Nov 02 Dec 04 32 4542 4582 40 1,600 6.80
l �lat ..................................................
Usage- 1,600 kWh 3.70 kVar Amt Due- Previous Bill $262.18
Duke Energy- Rate LSNO $ 194.68 Payment(s) Received 262.18cr
Current Electric Charges $194.68 Balance Forward 0.00
Current Electric Charges 194.68
Current Amount Due $194.68
=`.
Average Cost: $0.1217 per kWh Dec 30,2015 $194.68
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20151208010101_1.CSV-33777-000009131 Printed on recyclable paper.
Page 1 of 1
City Of Carmel Duke Energy 1-800-521-2232 5780-3839-01-0
Dir111ThStE
College Ave
r <'
<> »7 ......
:,.:..:....:...::::::::..... ;;;;;:;::::::::.::::.::..r:.,...r...:::.::::.::::::::::.
:.;,:.
PO Box 1326 Payments after Dec 30 not included Bill prepared on Dec 30,2016
Charlotte NC 28201-1326 Last payment received Dec 29 Next meter reading Jan 29,2016
:lieer::::>`:>< lri} er::. rt ::::> :<>::: .::. ...:5.:.....: ......... ...:.1'.....4 ..:...... ............................ ...................... ...:;:«:
Elec 108013030 Nov 27 Dec 29 32 100 122 1 22 0.00
Usage- 22 kWh Amt Due- Previous Bill $15.35
Duke Energy- Rate CSNO $ 12.00 Payment(s) Received 15.35cr
Current Electric Charges 12.00 Balance Forward 0.00
Current Electric Charges 12.00
Current Amount Due V12.00
22O0—y2.3 ej nOD
�5
JIM 2016
CARMQ
> t
Average Cost: $0.5455 per kWh Jan 25,2016 $12.00 $12.36
ENERGY. www.duke-energy.com
BM_BWDEMW.DUKE.INREG.20151230010101 1.CSV-37779-000014631 Printed on recyclable paper.
PLEASE RETURN THE TOP PORTION WITH YOUR PAYMENT Page 1 of 1
aitiiifIt `F €dts'><' >'>' > > > ` r>tr' :.' '> ciaullca `:
:::::q::::::::::::::::::::::.::::::::::.::::::::::::::::::..:::.::::::::::.::::::::::::::::::..:::.:
City Of Carmel Duke Energy 1-800-521-2232 3960-3050-01-4
1ralPaisT '<>< > >> < >''' <><' `<< ><'`>' ` ` '`<`'> Aau #Iira#o >>> > > ><`<<> ` > > <`
::
PO Box 1326 Payments after Dec 30 not included Bill prepared on Dec 30,2015
Charlotte NC 28201-1326 Last payment received Dec 29
.................................................................... ....................................................................................................
..................................................................................................... ..................................................................................................................
............................. ......................................................................................................
. % % :1::
Qty 14 Usage-0 Amt Due- Previous Bill $ 131.60
Duke Energy- Rate CSN9 Payment(s) Received 131.60c
Comm Sry-Fire Siren 131.60 Balance Forward 0.00
Current Unmetered Charges $131.60 Current Unmetered Charges 131.60
Current Amount Due $131.60
Jan 25,2016 $131.60
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20151230010101_1.CSV-37777-000014632 Printed on recyclable paper.
-- --.._._......._._. . _...._........ .__........._.. Page 1 of 1
> >» > a i . -
City Of Carmel Duke Energy 1-800-521-2232 6290-3721-01-0
Street Department
Dir Carmel Dr E
Keystone Ave
PO Box 1326 Payments after Dec 29 not included Bill prepared on Dec 29,2015
Charlotte NC 28201-1326 Last payment received Dec 14 Next meter reading Jan 26,2016
>:<::<:> :>:<:::; <`=`)$I[ red :>:::>:'> `'' ' > ` ' > >' >'''' ' '� # a ' >>
`':':€egad 31i .b.-t�'> '' ''<`:>'>'<>...... ate . n
VEX :.;:.;:.;: :.;:.;:.;:.;:.:.;:.Da..s:.::.:€eevts>:::Ir
::::::::::::::::::::::::::::.::..:.y.:::::::._::::::::::::::::::::::::::.::.:::::::::..::::.:::::::::::::::::::.,::::::.: .::::.:::..::::::.::::::::::::::::::::
Elec 106077453 Nov 21 Dec 24 33 51997 52956 1 959 0.00
Usage- 959 kWh Amt Due- Previous Bill $44.82
Duke Energy- Rate SMLC $52.67 Payment(s) Received 44.82cr
Current Electric Charges 52.67 Balance Forward 0.00
Current Electric Charges 52.67
Current Amount Due 52.67
.........................................
Average Cost: $0.0549 per kWh Jan 20,2016 $52.67
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20151229010101_1.CSV-13443-000027905 printed on recyclable paper.
Page 1of1
City Of Carmel Duke Energy 1'800'621'2232 0230'3727-01-1
Street Department
936 Main St E
Carmel|N4O032
POBox 1328 Payments after Dec uonot included Bill prepared onDec e3.2o1S
Charlotte NC 28201-1326 Last payment received Dec 14 Next meter reading Jan uo.uo1a
Beo 082820038 Nov 23 Dec 28 35 53198 54753 1 1.554 080
Usage- 1,554 kWh Amt Due- Previous Bill $55.49
Duke Energy- Rate SMLC $79.53 Payment(s) Received 55.49cr
Current Electric Charges $-79.63 Balance Forward 0.00
Current Electric Charges 79.53
Current Amount Due �-79—.53
16
Average Cost: $O.O512 per kWh
����
�="~�
ENERGY www.duke-energy.com
vm_uaucMWooxE./wnsozv,o,e2vv,v`m1.00v-1w
»� -0ma
o /noo Printed onrecyclable paper.
Page 1 of 1
rrc >1S€ciss ` <>< ` `=` _ 'sidrtr';:lr# t ><>> ?c �aulI> cre
City Of Carmel Duke Energy 1-800-521-2232 8550-3714-01-4
Street Department
2380 116Th St E
Carmel IN 46032
' `> ` >Acuatorra `< » >''> >< <`< ` >` `
PO Box 1326 Payments after Dec 29 not included Bill prepared on Dec 29,2015
Charlotte NC 28201-1326 Last payment received Dec 14 Next meter reading Jan 26,2016
> 'iiirttreadxn > ' t�al >
F resent::>::::>Mtiltf<<:<:>s:<::::1 :::::<::::>:::::>: ......:..
g . ::::,:.. ......... :
Elec 106889707 Nov 21 Dec 23 32 88082 89742 1 1,660 0.00
................................................................. .................................................................................................................
Usage- 1,660 kWh Amt Due- Previous Bill $113.61
Duke Energy- Rate SMHL $ 129.36 Payment(s) Received 113.61cr
Current Electric Charges $129.36 Balance Forward 0.00
Current Electric Charges 129.36
Current Amount Due $129.36
.......................................... ..........................................
Moun
Average Cost: $0.0779 per kWh Jan 20,2016 $129.36
DUKE
NERGY® www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20151229010101_1.CSV-13729-000027763 @ Printed on recyclable paper.
-----.._._......._._. . _....-�---.... .__........._.. Page 1 of 1
City Of Carmel Duke Energy 1-800-521-2232 9550-3714-01-0
Street Department
11599 Keystone
Carmel IN 46032
>:
PO Box 1326 Payments after Dec 30 not included Bill prepared on Dec 30,2015
Charlotte NC 28201-1326 Last payment received Dec 29 Next meter reading Jan 27,2016
<Ffead : <<>< treadt <><<>''`''>< » <<<> «<< << > < al>
illtei r::>::> IUii :>>:>:�ri�ni:::>:: >:<::::::;D.....: -:> !e i ::l r> se t>`::::<::AitilFf ><::':<::»::l sa....::::>::::::>' :<:<: ::.....
I::,:::: .:::: . . f . .:::;:.::::::::::.:::.::::::
Elec 035185747 Nov 23 Dec 24 31 65178 66369 1 1,191 0.00
Usage- 1,191 kWh Ami Due- Previous Bill $93.52
Duke Energy- Rate SMHL $98.47 Payment(s) Received 93.52cr
Current Electric Charges 98.47 Balance Forward 0.00
Current Electric Charges 98.47
Current Amount Due 98.47
.......................................... ..........................................
.....................................
..................... ..........................................
>'D e'l a . >>Ainoui�t'Dii e.
Average Cost: $0.0827 per kWh Jan 25,2016 $98.47
��
ENERGY. www.duke-energy.com
BM_BW DEMW.DUKE.INREG.20151230010101_1.CSV-9059 000026501 Printed on recyclable paper.
Nage i of i
a ti >l zrr dd ss >>r <<>>>> ;.... ar' :':u�r� ::G l::....:<::::::::» c ►al t:; l l et:>:
City Of Carmel Duke Energy 1-800-521-2232 7920-3824-01-2
Street Department
95106Th St E
Indianapolis IN 46280
Ajcitlfaai� a >' >'>> < < >< <
PO Box 1326 Payments after Dec 30 not included Bill prepared on Dec 30,2015
Charlotte NC 28201-1326 Last payment received Dec 29 Next meter reading Jan 29,2016
Elec 108220719 Nov 25 Dec 29 34 688 690 1 2 0.00
Usage- 2 kWh Amt Due- Previous Bill $10.00
Duke Energy- Rate CSNO $9.63 Payment(s) Received 10.00cr
Current Electric Charges 9.63 Balance Forward 0.00
Current Electric Charges 9.63
Current Amount Due 9.63
Average Cost: $4.8150 per kWh Jan 25,2016 $9.63
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20151230010101_1.CSV-7247 000027378 0 Printed on recyclable paper.
Page 1 of 1
a.
cr.tta. urrla2iil > '<> < «`'' Ifaitliie `
City Of Carmel Duke Energy 1-800-521-2232 2370-3824-01-3
Street Department
51 111Th E
Carmel IN 46032
IafPa >::>:aiitt £ < < > <<`<< � << < < <AacitMtaai <> > > > >
PO Box 1326 Payments after Dec 30 not included Bill prepared on Dec 30,2015
Charlotte NC 28201-1326 Last payment received Dec 29 Next meter reading Jan 29,2016
< s''Readtata'> <»>'` Ei#tareadr► > >' = > » >>>»> »>'<<'>'`>'':':> `Aaat `s
.....................................
F eviiaii >' r .:....t:>: <::t[ir.....:>
:::::::::::::::::::::::::::::::::: :::::.:.:::::::.:::::::::..:::::::::::::: .:.:::..::::::::::::._::::::::::::._
Elec 108228208 Nov 25 Dec 29 34 3107 4580 1 1,473 0.00
...............................................................................................
..........................................................
..................................
: :> :: `:< :: ::: «:: € ::
Usage- 1,473 kWh Amt Due- Previous Bill $ 137.26
Duke Energy- Rate CSNO $ 167.23 Payment(s) Received 137.26cr
Current Electric Charges $167.23 Balance Forward 0.00
Current Electric Charges 167.23
Current Amount Due $167.23
.................................. ..............
........................... ............................. ...................................
............................ ...................................
<`<t3iie` at; iituitE€Coes »`i> It 3t3�5>> (I '3
`.................................. ................................ ...............
%
Average Cost: $0.1135 per kWh Jan 25,2016 $167.23 $ 172.25
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20151230010101_1.CSV-7245-000027378 Printed on recyclable paper.
Page 1 of 1
> r►a r s»> »>>>«»>>» >> >'>>> ><'.. air :'u�r� :: ....::>:........::>;:>::>::::<:::::::::::>:::::
City Of Carmel Duke Energy 1-800-521-2232 1280-3816-01-6
1482 Main St W
Carmel IN 46032
If a 'Pa<:>::::>:>o s >>> > >'>`' > > >< >'>''A a ui t fia i c > >'> <<
PO Box 1326 Payments after Dec 30 not included Bill prepared on Dec 30,2015
Charlotte INC 28201-1326 Last payment received Dec 29 Next meter reading Jan 29,2016
...........:......:..................
:Meie. ;. ..:.... . . . :. .:.:..:>::::>:......:....:::::
r::.:>::::>...li...rr3...ler,:::;;:art :.......:......:.............. ...................cut........1'............................�...............�...0......................�...::.::..
Elec 106961329 Nov 25 Dec 29 34 9054 10628 1 1,574 0.00
Usage- 1,574 kWh Amt Due- Previous Bill $ 145.87
Duke Energy- Rate CSNO $177.09 Payment(s) Received 145.87cr
Current Electric Charges $177.09 Balance Forward 0.00
Current Electric Charges 177.09
Current Amount Due $177.09
>`<Afit
> >
Average Cost: $0.1125 per kWh Jan 25,2016 $177.09 $182.40
ENERGY. www.duke-energy.com
BM BW.DEMW.DUKE.INREG.20151230010101_1.CSV-7251-000027377 Printed on recyclable paper.
Page 1 of 1
t ..r.1.r1. 11tr::ie :> I»::::>::::::>::>:: »>: us1t: lt#mt:::
:::::€:::::::::::.::::::::::::::::::::::: :: : :.:::.:......................:..
City Of Carmel Duke Energy 1-800-521-2232 0280-3816-01-0
1480 Main St W
Carmel IN 46032
:::::::::: Arcamtl r ra#cod............;:.;:.;;:.;::
PO Box 1326 Payments after Dec 30 not included Bill prepared on Dec 30,2015
Charlotte NC 28201-1326 Last payment received Dec 29 Next meter reading Jan 29,2016
to
....... ........... ......
:::>::::>:::::.... ..::>::::::::>
.. l
Elec 106931911 Nov 25 Dec 29 34 11174 13188 1 2,014 0.00
..... v m ............................................... ' <€ «s:« ::::: <:<....>......:::<:::::>`::::`::`::::::>< >:
Usage- 2,014 kWh Amt Due- Previous Bill $ 181.01
Duke Energy- Rate CSNO $220.06 Payment(s) Received 181.01 cr
Current Electric Charges $220.06 Balance Forward 0.00
Current Electric Charges 220.06
Current Amount Due $220.06
...... ................................ .........................:.........
.................................... .................................
...................................
€€tfuef]at > <' nxiECte> ><> 1a3 <
................................. ....................,..............
Average Cost: $0.1093 per kWh Jan 25,2016 $220.06 $226.66
��
ENERGY. www.duke-energy.com
BM_BW.DEMW.DUKE.INREG.20151230010101_1.CSV-7249-000027377 *printed on recyclable paper.
-------'-- ' ........... —'---- Page 1of1
City Of Carmel Duke Energy 1'808'621-2232 7030'3728-01'3
Dir Cherry Creok8v
Hazel Dell
POBox 1328 Payments after Dec uonot indudod EUU prepared on Dec uo.uo1s
Charlotte INC 282O1 1326 Next meter reading Jan uo.uo1s
Bmo 071377135 Nov 25 Dec 28 33 13587 18702 1 135 0.00
Usage- 135 kWh Amt Due- Previous Bill $24.68
Duke Energy- Rate CSNO $25-38 Balance Forward 24.68
Current Electric Charges $�-2-5.38 Current Electric Charges 25.38
Current Amount Due 560.06
Average Cost: $*.188Q per kWh Jan 20,2016 $56.06
tn
�0��
=="~�
ENERGY www.duke-energy.com
owomvocMmDUKE./wxso.zv`s`229u,mv,-,.o»V-`mu,-0uomrna @ Printed onrecyclable paper.
_