HomeMy WebLinkAbout255179 02/09/16 CITY OF CARMEL, INDIANA VENDOR: 368938
s ® k ONE CIVIC SQUARE C H A CONSULTING CHECK AMOUNT: $*****7,693.34*
CARMEL, INDIANA 46032 300 SOUTH MERIDIAN CHECK NUMBER: 255179
tyiTON�` UNION STATION CHECK DATE: 02/09/16
INDIANAPOLIS IN 46225
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
202 R4340100 32640 30004-09 7,693.34 96TH PRIORITY WAY RAB
VOUCHER NO. WARRANT NO.
ALLOWED 20
C H A CONSULTING
300 SOUTH MERIDIAN IN SUM OF$
UNION STATION
INDIANAPOLIS, IN 46225
$7,693.34
ON ACCOUNT OF APPROPRIATION FOR
Engineering
PO#/Dept. INVOICE NO. ACCT#/Fund AMOUNT Board Members
32640 I 30004-09 I 43-401.00 I $7,693.34 1 hereby certify that the attached invoice(s), or
2200 E,,..bered 202
bill(s) is (are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Tuesday, February 02, 2016
Cost distribution ledger classification if
claim paid motor vehicle highway fund
`I?O, 32(o4Q
hoz - Izy3� ctoo .-
CJIA7----
Jeremy Kashman January 15,2016
City of Carmel Invoice No: 30004-09
Department of Engineering
One Civic Square
Carmel,IN 46032
Project 30004 96th Street at Priority Way W.Drive Roundabout Construction(City Project#15-04)
CONTACT: DAVID HENKEL: (317)780-7227
Preliminary Engineering Services per the contract dated April 1,2015
Des No.1400937; Total Contract NTE$180,085; NTP dated April 1,2015
$124,310.00 Lump Sum
$24,650.00 Hourly/NTE
$31,125.00 UniUNTE
$180,085.00
Professional Services": November 28,2016 Through December 31,2015
Percent Previous Current
Billing Phase/Task Fee Complete Fee Billed Fee Billed
LUMP SUM
Section 1 Traffic Data Collection 20,500:00 90.00% 18,450.00 0.00
Section 2 Environmental Document&Permitting 21,300.00 95.00% 19,170.00 1,065.00
Section 3 Public Involvement 1.3,400.00 0.00% 0.00 0.00
Section 4, Project Management&Roadway/Drainage Design 69,110.00 100.00% 69,110.00 0.00
(through Stage 2 Plans)
Total Fee 124,310.00 106,730.00 1,065.00
Section 5: Utility Coordination (Hourly/NTE)
Billing Limits Current Billing Prior Billing Billed to Date
Total Billings 6,628.34 .11,304.35 17,932.69
Billing Limit 24,650.00
Amount Remaining 6,717.31
Section 6: RW Engineering (UnitINTE)
Billing Limits Current Billing Prior Billing Billed to Date
Total Billings 0.00 .0.00 10.00
Billing Limit 26,125.00
Amount Remaining 26,125.00
Section 7: Supplemental Two Survey(Hourly/NTE)
Billing Limits ��� Current Billing Prior Billing Billed to Date
Total Billings 0.00 5,000.00 5,000.00
Billing Limit '°� 5,000.00
Amount Remaining 0.00
Total Project Billing Limits. p Current Billing 'Prior Billing Billed To Date
Total Billings 7,693.34 123,034.35 .130,727.69
Billing Limit -180,085.00
Remaining 1�11hn rc/ 49,357.31
Total Due This Invoice $7,693.34
"Satisfying Our Clients with Union Station,300 S.Meridian Street,Indianapolis,IN 46225
Dedicated People Committed to Total Quality" I T 317.786.0461 • F 317.788.0957 • www.chacompanies.com
l
E�q�R 1625 North Post Road
Indn ( � Bus. ( 17)s,IN895- 46219
VENDOR# v - Bus. (317)895-2585
GL ACCT# COnSUlting= Fax (317)895-2596
DOC#.
GL PERIOD
CO# -
su Invoice number 15208-07
Attn: Accounts Payable DEC Z015 Date 12/0212015.
P.O.Box 5269
Albany,NY 12205 By Project 15-208 Roudabout at 96th and Priority
Way
For Professional Services rendered after October 30,2015 through November 27,2015 300011.
Send Invoices via E Mail invoices@chacompanies.com
CC:DHenkel@chacompanies.com
Invoice Summary
Contract Percent= Prior Total Current
Description Amount Complete. Billed Billed.. Billed
Utility Coordination 24,650.00 77.55 12,487.68 19,116.02 6,628.34
Abstracting and Right-of-Way 26,125.00 0.00 0.00 0.00 0.00
Supplemental Topographic Survey 5,000.00 100.00- 5,000.00 5,000.00 0.00
Total 55,775.00 43.24 17,487.68 24,116.02 6,628.34
Utility Coordination
Professional Fees
Billed
Hours Rate Amount
Project Team Leader
Jay N.Ridens
Project Time 4.00 186.44 745.76
Senior Project Manager
Scott G.Minnich
Project Time 22.50 184.30 4,146.7.5 .
Design Engineer.
Jonathan M. Korff
Project Time 13.50 128.58 1,735.83
Invoice total. 6,628.34
Aging Summary
Invoice Number; Invoice Date Outstanding Current Over 30 Over 60 Over 90 Over 120
15208-04 09/11/2015 4,443.83 4,443.83
15208-05 10/09/2015 1,407.95 1,407.95
15208706 11/06/2015 3,676.32 3,676.32
15208-07 12/02/2015 6,628.34 6,628.34
Total 16,156.44 10,304.66 1,407.95 4,443.83 0.00 0.00
CHA Consulting,Inc. Invoice number 15208-07
Page 1:of-2
CHA Consulting,Inc. Invoice number - 15208-07
Project 15-208 Roudabout at 96th and Priority Way Date 12/02/2015
Approved by:
Jon E.CI dfeifer
Manager Bridge Department
CHA Consulting,Inc. Invoice number 15208-07
Page 2 of-2.
Pro ect Status
C]i A. .
CONTACT: Jeremy Kashman,P.E.,City Engineer DATE: January 13, 2016
CLIENT: City of Carmel PROJECT NO.: 30004
PROJECT: 96th Street and Priority Way Roundabout(City Project#15-04)
BY: Christopher J.Schultz,P.E. PAGES: i of 1
DISTRIBUTION:
NAME COMPANY E-MAIL ADDRESS PHONE
Jeremy Kashman City of Carmel jkashman(@carmel.in.gov 317-571-2441
Tom Karis CHA tkarisochacompanies.com .317-780-7255
Kevin Rearick CHA krearickPchacompames.com 317-780-7141
David Henkel CHA dhenkel(@chacompanies.com 317-78o-7227
Chris Schultz CHA cschultz(@chacompanies.com 317-780-7252.
Trevor Wieseke CHA twiesekeC@chacompanies.com 317-78o-7205
Tim Coomes United Consulting timcOucindy.com 317-895-2585 ="
Jon Korff United Consulting jonk(@ucindy.com 317-895-2585.-
PROGRESS
17-895-2585 -PROGRESS SINCE LAST REPORT:
• 12/29/15—INDOT completed review of CE Submittal#3.
1/o7/16—Advertisement No.1 for Public Involvement(IndyStar)
• 1/13/15—Quarterly Report updated in MiTIP.
• 1/14/16—Advertisement No.2 for Public Involvement(IndyStar)
• CHA addressing INDOT Stage 2 Roadway Plan Review comments
• United continuing progress with Utility Coordination
ANTICIPATED WORK DURING NEXT MONTH:
• CHA to complete Public Involvement process.
INDOT to release final approved CE Document.
• CHA to organize PFC Meeting,anticipated to beheld on 2/15/16.
• Once INDOT releases the final approved CE Document,and feedback has-been received from all utilities
on R/W,requirements, CHA will establish the final.proposed R/W lines so United can update the R/W
Engineering documents.
ENVIRONMENTAL SCHEDULE:
• 9/28/15 CE submittal#1 to INDOT - -
10/20/15 Review Complete by INDOT
• 10/30/15 CE submittal#2 to INDOT
• 11/20/15 Review Complete by INDOT
(Continued on Next Page)
V:\Projects\IIN62\Transportation\30004 Carmel 96th St at Priority Way\00 Administration\10 Operations\10 Status Reports\30004 Status Report 2016.01.13.docx
"Satisfying Our Clients with Union Station,300 S.Meridian Street,Indianapolis,IN 46225
Dedicated People Committed to Total Quality" I T 317.786.0461 9 F 317.788.0957 • www.chAcompanies.com
PROJECT STATUS
96th Street and Priority Way Roundabout
January 13, 2016
Page 2
a 12/09/15 CE submittal#3 to INDOT
• 12/29/15 Review Complete by INDOT
• 1/07/16 Advertise for public involvement
• 1/22/16 Public involvement complete
• 2/01/16 Final INDOT Approved CE Document
DESIGN SCHEDULE:
• 9/28/15 Stage 2 Submittal to Carmel
e 1o/8/15 Review Meeting held with Carmel/CHA
• 11/12/15 Stage 2 Submittal to INDOT
•. 12/4/15. On-site Utility Meeting
• 12/11/15 Review Complete by INDOT
• 2/o1/16 INDOT NTP for land acquisition.(Approved CE)
•. 2/15/16 Begin R/W Engineering Updates(United Consulting)
• 2/15/16 PFC Meeting
SCOPE OR BUDGET CHANGES:
12/14/15 CHA submitted Supplemental Agreement No. 1 to Carmel for review and approval of the 2o16
design effort.
INFORMATION NEEDED FROM CLIENT/OTHERS:
• Utilities—Need Utility R/W requirements to finalize proposed R/W:
• City of Carmel—Need Inter-local Agency Agreement between Carmel and Indianapolis for Right-of-Way
Acquisition.