Loading...
HomeMy WebLinkAboutB15502402.pdfStick frame screen porch roof. 11-01-02 TOP 11-01-02 TOP 12-07-02 TOP 11-01-02 TOP 1 1 -0 1 -0 2 T O P 1 1 -0 1 -0 2 T O P 12-07-02 TOP 1 2 -0 7 -0 2 T O P 10-01-02 TOP 1 0 -0 1 -0 2 T O P 9-08-14 TOP (from top of first floor deck) 9 -0 8 -1 4 T O P (f r o m t o p o f f i r s t f l o o r d e c k ) 9 -0 8 -1 4 T O P (f r o m t o p o f f i r s t f l o o r d e c k ) 1 0 -0 1 -0 2 T O P (f r o m t o p o f f i r s t f l o o r d e c k ) S t i c k f r a m e f r o n t p o r c h r o o f . 6-05-13 TOP 5 -0 4 -1 2 T O P 4-08-09 TOP 4-08-09 TOP Stick frame H T U 2 6 H T U 2 6 H T U 2 6 H T U 2 6 H T U 2 6 H T U 2 6 MUS26 MUS26 MUS26 MUS26 MUS26 MUS26 MUS26 M U S 2 6 M U S 2 6 M U S 2 6 M U S 2 6 M U S 2 6 M U S 2 6 M U S 2 6 M U S 2 6 M U S 2 6 M U S 2 6 M U S 2 6 M U S 2 6 M U S 2 6 M U S 2 6 M U S 2 6 M U S 2 6 LAY01 LAY02 LAY02 LAY03 LAY04 LAY05 LAY06 LAY07 LAY08 LAY09 LAY10 LAY12 LAY13LAY13 LAY13 LAY14 LAY15 LAY11 LAY16 T G 0 1 T 0 1 T 0 2 T 0 3 TG02 T04 MG01 C G 0 1 J 0 2 J03 C G 02 T05 T06 T07 T08 T09 TG03 G E 0 1 T 1 0 T 1 1 T G 0 4 TG05 T12 T G 0 7 T 1 4 T 1 5 T 1 6 T 1 7 T G 0 8 T 1 8 C G 03 T G 0 9 T 1 9 T 2 0 TG10 T21 T22 T22 T21 TG10 TG11 T24 TG12 T G 1 3T27 C G 0 4 C G 0 4 G E 0 2 G E 0 2 TG14 T G 1 5 T 2 9 T G 1 5 T 2 9 J 0 6 C G 05 C G 0 5 J08 J09 J 1 0 J 1 1 C G 06 J12 J13 J 1 4 TG16 TG16 C G 07 C G 0 8 J 1 5 J 1 6 J 1 5 J 1 7 T G 1 7 T 3 0 T 3 1 T 3 2 C G 0 9 M 1 0 M 0 9 C G 1 0 C G 11 J18 J19 J18 J20 V 0 4 V 0 5 M 0 1 (4 ) J 0 1 (3 ) M 0 2 (1 4 ) M03(3) J 0 4 (2 ) M 0 4 (7 ) T 2 3 (2 ) T 2 5 (6 ) T 2 6 (4 ) M05(16) T 2 8 (4 ) M06(4) J 0 5 (6 ) J05(6) J 0 7 (5 ) V01(9) V 0 1 (7 ) V 0 2 (4 ) T33(2) V 0 3 (2 ) M09(5) T 1 3 (4 ) M 0 8 (4 ) M 0 8 (4 ) 1 1 -0 422-00-0013-00-0044-06-00 1 5 -1 0 -0 0 2 7 -1 0 -0 8 1 4 -0 0 -1 3 2-08-00 7-01-08 12-08-08 10-02-00 20-10-00 26-04-00 1 1 -0 4 1 3 -0 6 -0 0 2 4 -0 0 -0 0 1 6 -1 0 -0 0 1 3 -1 0 -0 0 2 -0 0 -0 0 24-01-08 19-03-00 12-01-08 7-01-08 12-08-08 6 -1 1 -0 1 1 0 -0 1 -1 4 6 -1 1 -0 1 6-04-00 1 5 -0 6 -0 8 1 7 -0 5 -0 0 4-09-0522-07-1117-01-00 28-06-08 4-09-08 1 6 -1 0 -0 0 5-03-00 3 -0 8 11-09-06 3-11-11 2-09-15 3 -0 1 -1 4 4 -0 1 -1 1 4 -0 1 -1 1 1 5 -0 1 -1 0 3 -0 5 -0 6 3-08 5 -0 7 -0 0 3-08 3 -0 9 -0 0 1-05-12 3-08 1 5 -0 3 -0 0 28-04-00 I R C 2 0 0 6 T P I 2 0 0 2 2 0 T L L - 1 0 T D L - 1 0 B D L H o m e s b y M c K e n z i e W e s t v a l e M o d e l 7 6 W e s t v a l e 1 /4 "=1 ' N o v e m b e r 6 , 2 0 1 5 P H B 1 5 5 0 2 4 0 2 C U S T O M E R : L O C A T I O N : M O D E L : J O B #: D A T E : D E S I G N E R : D E S I G N I N F O R M A T I O N : S C A L E : 9 0 2 8 O l d S R 6 7 S o u t h M o o r e s v i l l e , I N 4 6 1 5 8 (3 1 7 ) 8 3 4 -5 3 8 0 Truss Placement Guide 1)This layout is intended for the purpose of truss location and placement only.Refer to the building plans for actual building construction. 2)All dimensions shown 00-00-00 are in feet-inches-sixteenths. 3)Trusses are spaced 24"on center unless otherwise noted. 4)Do not cut or modify trusses. 5)Refer to the individual truss design drawings for the location of member bracing,uplift and truss end reactions. 6)Installation of all temporary and permanent bracing is essential.See truss drawings,BCSI-B2 Summary Sheet and building designer requirements.