HomeMy WebLinkAboutWSM_ComCheck.pdfCOMcheck Software Version 4.0.2.6
Envelope Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Vertical Glazing / Wall Area�
Construction Site:
3016 Warren Way
Carmel, IN 46032
Building Area
90.1 (2007) Standard
Woodland Springs Manor
Indianapolis, Indiana
5a
Alteration
17%
Owner/Agent:
Nicole James
Hunt Pacific
Indianapolis, IN
317-848-4022
Floor Area
1-Apartments (Multifamily) : Residential 2352
Envelope Assemblies
Post-Alteration Assembly
Designer/Contractor:
James McCann
KEELER-WEBB ASSOCIATES
486 Gradle Drive
Carmel, IN 46032
317-574-0140
R-Value Proposed Max. Allowed
Cavity Cont. U-Factor SHGC U-Factor SHGC
Roof 1: Attic Roof with Wood Joists, [Bldg. Use 1- Apartments] 38.0 0.0 0.027 — 0.027 —
NORTH
Wall - Brick Veneer: Wood-Framed, 16" o.c., [Bldg. Use 1- — — — — — —
Apartments], Exemption: Cavity filled with minimum R-3/inch
insulation
Windows: Vinyl/Fiberglass Frame, Other, [Bldg. Use 1- — — 0.350 — 0.350 0.548
Apartments]
Sliding Patio Doors: Other poor, Non-Swinging, [Bldg. Use 1- — — 0.350 --- 0.500 ---
Apartmentsj
(a) 'Other' components require supporting documentation for proposed U-factors.
(b) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
Project Notes
ComCheck for damaged portions of the existing building only.
Envelope Compliance Statement
Compliance Statement: The proposed envelope alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.0.2.6 and to comply with the mandatory
requirements listed in the Inspection Checklist.
Project Title: Woodland Springs Manor Report date: 02/03/16
Data filename: E:\PROJECTS\ARDIZZONE\1601-xxx ARDIZZONE - Woodland Springs ManohWSM - ComCheck.c Page 1 of 9
���-}iY1t�S Pl ��.�viv, �.t. � '``ti 2�3 --lln
Name - Title Sig ure Date
_..uitti�l,s._
''��I
•���,....� � f e
¢ �,1ST���
,� PE&�t1332
m �...�..�.''°�. o
'8 Si�A�� fa� . �
�•c� �o'13fA1�1�.a'' �a�G'�:
�`�n �-.�....»^' �,�, �w�
�. `��A�.'��' ..��•.
Project Title: Woodland Springs Manor Report date: 02/03/16
Data filename: E:\PROJECTS\ARDIZZONE\1601-xxx_ARDIZZONE - Woodland Springs Manor�WSM - ComCheck.c Page 2 of 9
COMcheck Software Version 4.0.2.6
Inspection Checklist
Energy Code: 90.1 (2007) Standard
Requirements: 100.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
5ection
#
& Req.ID
4.�.2
[PRl]1
Plan Review � Complies?
Comments/Assumptions
Plans and/or specifications provide all ❑Complies � Requirement will be met.
information with which compliance ❑Does Not
can be determined for the building
envelope and document where ❑Not Observable
exceptions to the standard are ❑Not Applicable
claimed.
Additional Comments/Assumptions:
� _. .. _ - --- — -- ,
1; High Impact (Tier 1) 2. Medium Impact (Tier 2) , 3 Low Impact (Tier 3)
�__� — � ,_—__�-- � - -- -- - — -- -- -
Project Title: Woodland Springs Manor Report date: 02/03/16
Data filename: E:\PROJECTS\ARDIZZONE\1601-xxx_ARDIZZONE - Woodland Springs ManohWSM - ComCheck.c Page 3 of 9
Se � on i Footing / Foundation i Plans Verified
� Inspection Value
& Reg.iD-�-- -- _ - -- — — - - —l- - - — —
5.5.3.3 Below-grade wall insulation R- R-
[FO1]1 value.
5.5.3.5 Slab edge insulation R-value.
[F03]1
5.53.5 Slab edge insulation
[F05]1 depth/length.
R-
❑ Unheated
❑ Heated
ft
5.8.1.7.3 Insulation in contact with the �
[F07]1 ground has <=0.3% water
absorption rate per ASTM C272.
Additional Comments/Assumptions:
Field Verifed Complies? Comments/Assumptions
----Value-- --- -- -- - -
R- ❑Complies See the Envelope Assemblies
❑DoeS Not table for values.
❑Not Observable
❑Not Applicable
R- ❑Complies See the Envelope Assemblies
❑ Unheated �Does Not table for values.
❑ Heated ❑Not Observable
❑Not Applicable
ft ❑COmplles See the Envelope Assemblies
❑Does Not table for values.
❑Not Observable
❑Not Applicable
❑Complies Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
1 High Impact (Tier 1), � 2 Medium Impact (Tier 2) L3 � Low Impact (Tier 3) �
Project Title: Woodland Springs Manor Report date: 02/03/16
Data filename: E:\PROJECTS\ARDIZZONE\1601-xxx_ARDIZZONE - Woodland Springs ManorlWSM - ComCheck.c Page 4 of 9
Section 4
# Framing / Rough-In Inspection
& Req.ID � ` __ __
5.43.2 Factory-built fenestration and
[FR1]3 doors are labeled as meeting air
leakage requirements.
5.5.4.3a Vertical fenestration U-Factor
[FR8]1
5.5.4.3b Skylight fenestration U-Factor.
[FR9]1
5.5.4.4.1 Vertical fenestration SHGC value.
[FR10]1
5.5.4.4.2 Skylight SHGC value.
[FR11]1
5.8.2.1, Fenestration products rated in
5.8.2.4 accordance with NFRC.
[FR12]z
5.8.2.2 Fenestration products are
[FR13)1 certified as to performance labels
or certificates provided.
5.8.23, U-factor of opaque doors
5.5.3,6 associated with the building
[FR14]z thermal envelope meets
requirements.
Additional Comments/Assumptions:
Plans Verified I Field Verified �omplies?
Value f value i
Fenestration
cfm/ftz
Doors
cfm/ftz
Fenestration_ ❑Complies
_ cfm/ft2 ❑Does Not
Doors ❑Not Observable
cfm/ftz ❑Not Applicable
Comments/Assumptions
Requirement will be met.
U- U- ❑COmplies See the Envelope Assemblies
❑Does Not table for values.
❑Not Observable
❑Not Applicable
U- U- ❑Complies See the Enve/ope Assemblies
❑Does NOt table for values.
❑Not Observable
❑Not Applicable
SHGC: SHGC: ❑Complies See the Envelope Assemblies
❑Does Not table for values.
❑Not Observable
❑Not Applicable
SHGC: SHGC: ❑Complies See the Envelope Assemblies
❑Does Not table for values.
❑Not Observable
❑Not Applicable
❑Complies Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
❑Complies Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
U- U- ❑COmplie5 See the Envelope Assemblies
❑ Swinging ❑ Swinging ❑Does Not table for values.
❑ Nonswinging ❑ Nonswinging ❑Not Observable
❑Not Applicable
_ _ _.. .r _ ..._ .
1 High Impact (Tier 1) � 2, Medium Impact (Tier 2) �, 3� Low Impact (Tier 3) �
Project Title: Woodland Springs Manor Report date: 02/03/16
Data filename: E:\PROJECTS\ARDIZZONE\1601-xxx_ARDIZZONE - Woodland Springs Manor�WSM - ComCheck.c Page 5 of 9
5ection Plans Verified Field Verified
# Insulation Inspection Value Value E Complies? Comments/Assumptions
& Reg.ID --- ---- ---� ---- - - -- — -- --- - -- - - ---- ----
5.4.3.1 All sources of air leakage in the �❑Complies Requirement will be met.
[IN1]1 building thermal envelope are ❑Does Not
sealed,caulked,gasketed,
weather stripped or wrapped with ❑Not Observable
moisture vapor-permeable ❑Not Applicable
wrapping material to minimize air
leakage.
5.53.1 Roof R-value. For some ceiling R- � {R- � M ❑Complies See the EnvelopeAssemblies
[IN2]1 systems, verification may need to � qbove deck ❑ Above deck �Does Not table Por values.
occur during Framing Inspection. � Metal ❑ Metal ❑Not Observable
❑ Attic ❑ Attic ❑Not Applicable
_ . .. ---•• -.�_._...__ .._...••-•__.-.• ••_ -_ •- •••_ -
5.8.1.2, Roof insulation installed per ❑Complies Requirement will be met.
5.8.1.3 manufacturer's instructions. ❑Does Not
[IN3]1 Blown or poured loose-fill
insulation is installed only where ❑Not Observable
the roof slope is <=3 in 12. ❑Not Applicable
5.5.3.1.1 High-albedo roofs meet solar SR: SR: ❑Complies Requirement will be met.
[IN5]3 reflectance of 0.70 and thermal SRI: SRI: �Does Not
emittance of 0.75 or SRI of 82.
❑Not Observable
❑Not Applicable
5.5.3.2 Above-g�ade wall Insulatlon R- R- R- ❑Complies See the Envelope Assemblies
[IN6]1 value. table for values.
❑ Mass ❑ Mass �Does Not
❑ Metal ❑ Metal ❑Not Observable
❑ Steel ❑ Steel ❑Not Applicable
❑ Wood ❑ Wood
5.8.1.2
[IN7]1
5.5.3.4
[IN8]1
Above-grade wall insulation ❑Complies Requirement will be met.
installed per manufacturer's ❑Does Not
instructions.
❑Not Observable
❑Not Applicable
Floor insulation R-value. R- f R- � ❑Complies See the Envelope Assemblies
❑ Mass ❑ Mass �Does Not table for values.
❑ Steel ❑ Steel ❑Not Observable
❑ Wood ❑ Wood ❑Not Applicable
5.8.1.1 Building envelope insulation is ^
[IN10]� labeled with R-value or insulation
certificate providing R-value and
other relevant data.
5.8.1.4 Eaves are baffled to deflect air to ~ �
[IN11]z above the insulation.
5.8.1.5 Insulation is installed in
[IN12]� substantial contact with the
inside surtace separating
conditioned space from
unconditional space.
5.8.1.6 Recessed equipment installed in
[IN13]� building envelope assemblies
does not compress the adjacent
insulation.
❑Complies Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
❑Complies Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
❑Complies Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
❑Complies Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
-T -- — � �
�High Impact (Tier 1) 2� Medium Impact (Tier 2) � 3 i Low Impact (Tier 3)
Project Title: Woodland Springs Manor Report date: 02/03/16
Data filename: E:\PROJECTS\ARDIZZONE\1601-xxx ARDIZZONE - Woodland Springs ManorlWSM - ComCheck.c Page 6 of 9
5e �ion Insulation Ins ection P�ans Verified Field Veri�ed �
P Value Value I Complies? Comments/Assumptions
& Rec�.ID °
5.8.1.7 Exterior insulation is protected —__ ._ ._.... _._.. ___� -- `OComplies Requirement will be met
[IN14]z from damage with a protective ❑Does Not
material. Verification for exposed
foundation insulation may need ❑Not Observable
to occur during Foundation ❑Not Applicable
Inspection.
5.8.1.7.1 Attics and mechanical rooms ❑Complies Requirement will be met.
[IN15]z have insulation protected where ❑Does Not
adjacent to attic or equipment
access. ❑Not Observable
❑Not Applicable
5.8.1.7.2 Foundation vents do not interfere T T ❑Complies Requirement will be met.
[IN16]z with insulation. ❑Does Not
❑Not Observable
❑Not Applicable
5.8.1.8 Insulation intended to meet the ^� ^ ��� ❑Complies Requirement will be met.
[IN17]3 roof insulation requirements ❑Does Not
cannot be installed on top of a
suspended ceiling. Mark this ❑Not Observable
requirement compliant if ❑Not Applicable
insulation is installed accordingly.
Additional Comments/Assumptions:
- � - -- - ,- - -- — -- .
, 1 High Impact (Tier 1) '`2 ; Medium Impact (Tier 2) �, 3 Low Impact (Tier 3)
._ _
Project Title: Woodland Springs Manor Report date: 02/03/16
Data filename: E:\PROJECTS\ARDIZZONE\1601-xxx_ARDIZZONE - Woodland Springs ManohWSM - ComCheck.c Page 7 of 9
5.4.3.3
[FI1]1
Final Inspection
Weatherseals installed on all loading
dock cargo doors in Climate Zones 4-
8.
Additional Comments/Assumptions:
Complies? � — Comments/Assumptions
❑Complies Exception: Requirement does not apply.
❑Does Not
❑Not Observable
❑Not Applicable
1� High Impact (Tier 1) _ I 2, Medium Impact (Tier 2) � 3 Low Impact (Tier 3)
Project Title: Woodland Springs Manor Report date: 02/03/16
Data filename: E:\PROJECTS\ARDIZZONE\1601-xxx_ARDIZZONE - Woodland Springs ManohWSM - ComCheck.c Page 8 of 9
Project Title: Woodland Springs Manor Report date: 02/03/16
Data filename: E:\PROJECTS\ARDIZZONE\1601-xxx_ARDIZZONE - Woodland Springs ManohWSM - ComCheck.c Page 9 of 9