Loading...
HomeMy WebLinkAbout700_3550_ME102.pdf1DETAIL - LOWER HANGER ATTACHMENT SCALE: NONE11-02-05 2DETAIL - DUCT TAKE-OFF FROM SQUARE DUCT SCALE: NONE11-02-05 3DETAIL - FLEXIBLE DUCT SCALE: NONE11-02-05 HANGER RODS, WIRES, 50" DIA MAX 24" DIA MAX USED IF DUCT SHAPE IS MAINTAINED BAND ONE HALF-ROUND MAY BE DEFORM DUCT SHAPEHANGERS MUST NOT STRAP HANGERS OR STRAPS AS HANGER STRAPBAND OF SAME SIZE (VERIFY UPPER TRAPEZE ANGLES TRAPEZE HANGERS LOAD CAPACITY) ALTERNATE LOCATION(TYPICAL) LOCKNUTS ALLOWABLE LOAD DO NOT EXCEED LI M I T S USED FOR ATTACHMENT REINFORCEMENT MAY BE IF IT QUALIFIES FOR BO T H D U T I E S ROD FASTENERS LOAD RATED IF HANGER LOOPS SCREWS MAY BE OMITTED BOTTOM REINFORCEMENT IS PLACED UNDER A UNLESS FOOT OF STRAP SCREWS NO T E : 1" MI N WIRE SECUREHANGER 60" MAXHANGER STRAPS ATTACH ALL HANGERS FROM SIZE BOLT(S) FOR LOAD STRAP OR ANGLE TOP CHORD OF JOISTS. ST R A P ROD 10" DIA MAX ISOMETRIC VIEW PLAN VIEW DUCT AND OPERATOR OF NOT LESS THAN INSULATION THICKNESS. VOLUME/BALANCING DAMPER OPERATORS. ALLOW CLEARANCE BETWEEN AND INSTALLED WITH STAND-OFF MOUNTING BRACKETS FOR ALL INSULATED SUPPLY AND RETURN DUCTWORK SHALL BE FURNISHED TAKE-OFF BRANCH CLOSE OPENING MAIN DUCT AT CORNERS DIRECTION OFAIR FLOW (SUPPLY) MINIMUM OF 4" 1/4 OF DUCT WIDTH ABOVE SUSPENDED CEILING). WHEN DAMPER IS LOCATED SURVEYOR'S TAPE (PROVIDE BALANCER CAN LOCATE ALL VOLUME DAMPER SO THAT HANG SURVEYOR'S TAPE FROM BRACKET STAND-OFF MOUNTING BALANCING DAMPEROPPOSED BLADEOROR DAMPERS. DAMPER VOLUME45 DEGREE ENTRY BRANCHDUCT DUCT WIDTH FLOW (RETURN) DIRECTION OF AIR TO ROUND TRANSITION INSULATED FLEXIBLE METAL BAND CLAMP SHEET METAL SQUARE METAL BAND CLAMP SUPPLY MAIN NO BENDS OR KINKS AND PULLFLEXIBLE DUCT. RUN STRAIGHT,DU C T DIFFUSER CEILING SUSPENDED 5'-0" MAXIMUM LENGTH OF TIGHT. 45 DEGREE TAKE-OFF FROM SIDE OF SUPPLY MAIN WITH GALVANIZED DUCT AND VOLUME DAMPER PROVIDE HARD SHEET METAL TURNING VANES. WITH SINGLE THICKNESS PROVIDE MITERED ELBOWS ALLOW A FULL RADIUS, ALLOWS. WHERE SPACE DOESN'T RADIUS ELBOWS WHERE SPACE Fe b 2 6 , 2 0 1 6 - 1 5 : 1 8 : 4 6 D W G N a m e : C : \ J o b s \ 2 0 1 6 \ A e t o s \ G e t g o S E R F s \ # 3 5 5 0 - I N C a r m e l \ D r a w i n g s \ B u l l e t i n # 1 \ 1 0 9 0 1 - 1 m e 1 0 2 . d w g U p d a t e d B y : b a n d r a s i k MECHANICAL DETAILS N ME1023/16"=1'-0" BEA / RJP CONTRACTOR MUST VERIFY ALL CLEARANCES ANDDIMENSIONS IN FIELD ISSUED FOR 50 % ISSUED FOR REDLINE REVIEW ISSUED FOR CONSTRUCTION ISSUED FOR PERMIT KICK OFF MEETING FINAL APPROVED PLAN ISSUED FOR BID DRAWN BY SCALE DATE OWNER DWG. TITLE FILE NAME LOCATION PROJECT DATE LAYERS REVISIONS SHEET NO. PLANNER PROJECT NO. USERNAME BY GETGO, LLC. SPCR NO. REV. NO. -- KAB 3550 THE BRIDGES CARMEL, INDIANA STAMP 01/22/16 -- 01/22/16 -- -- -- 02-26-16