HomeMy WebLinkAbout3550_2016.02.26_Bulletin 1.pdfPage 1 of 2
MCG Architecture Market District Store: #3550 CARMEL, IN
7100 E. Pleasant Valley Rd. #320
Cleveland, Ohio 44131 Date: February 26, 2016
** CONSTRUCTION BULLETIN 1 **
Aetos Construction Company
261 Kappa Drive
Aetos Project Manager:
Phone:
Pittsburgh, PA 15238 FAX:
This Construction Bulletin includes revisions for the following SPCRs:
SPCR #3550-xx-xx – Revisions
Drawing List – Cover Sheet, AD1, ME101, ME102
Instructions to Contractors and Vendors:
A. This is not an order for performed work. This is a request for cost proposals for the
described revisions.
B. Enter amounts for each SPCR and totals on the appropriate lines.
C. Itemize quantity and rates for labor, material, overhead and profit separately.
D. The Contractor must sign for each SPCR.
E. Contractor must attach detailed supporting documentation consistent with
Specification Section 01035 - 1.02 for each SPCR.
F. Work not revised hereby shall remain as originally shown and specified.
SPCR #3550-xx-xx – Revisions
CS
Updated Current Drawing List.
AD1
Added demo ceiling plan and reflected ceiling plan with notes.
Added bulkhead detail.
ME101
Added demolition of existing lighting and controls in back storage area.
Page 2 of 2
Added new lighting and relocation of occupancy sensor into new ceiling grid in back
storage area.
Added demolition of existing ductwork supply air registers in back storage area.
Added relocated supply air register and new supply air diffuser to in back storage
area.
ME102
Added mechanical details.
Total Additions: $
Total Deductions: $
Total SPCR #3550-xx-xx: $
Contractor’s Signature Date
END OF REVISIONS FOR BULLETIN 1