Loading...
HomeMy WebLinkAbout3550_2016.02.26_Bulletin 1.pdfPage 1 of 2 MCG Architecture Market District Store: #3550 CARMEL, IN 7100 E. Pleasant Valley Rd. #320 Cleveland, Ohio 44131 Date: February 26, 2016 ** CONSTRUCTION BULLETIN 1 ** Aetos Construction Company 261 Kappa Drive Aetos Project Manager: Phone: Pittsburgh, PA 15238 FAX: This Construction Bulletin includes revisions for the following SPCRs:  SPCR #3550-xx-xx – Revisions  Drawing List – Cover Sheet, AD1, ME101, ME102 Instructions to Contractors and Vendors: A. This is not an order for performed work. This is a request for cost proposals for the described revisions. B. Enter amounts for each SPCR and totals on the appropriate lines. C. Itemize quantity and rates for labor, material, overhead and profit separately. D. The Contractor must sign for each SPCR. E. Contractor must attach detailed supporting documentation consistent with Specification Section 01035 - 1.02 for each SPCR. F. Work not revised hereby shall remain as originally shown and specified. SPCR #3550-xx-xx – Revisions CS  Updated Current Drawing List. AD1  Added demo ceiling plan and reflected ceiling plan with notes.  Added bulkhead detail. ME101  Added demolition of existing lighting and controls in back storage area. Page 2 of 2  Added new lighting and relocation of occupancy sensor into new ceiling grid in back storage area.  Added demolition of existing ductwork supply air registers in back storage area.  Added relocated supply air register and new supply air diffuser to in back storage area. ME102  Added mechanical details. Total Additions: $ Total Deductions: $ Total SPCR #3550-xx-xx: $ Contractor’s Signature Date END OF REVISIONS FOR BULLETIN 1